The bolt is made of 2014-T6 aluminum alloy and is tightened so it compresses a cylindrical...

The bolt is made of 2014-T6 aluminum alloy and is tightened so it compresses a cylindrical tube made of Am 1004-T61 magnesium alloy. The tube has an outer radius of 10 mm, and both the inner radius of the tube and the radius of the bolt are 5 mm. The washers at the top and bottom of the tube are considered to be rigid and have a negligible thickness. Once snug against the washers, the nut is tightened a full turn. If the bolt has 10 threads per centimeter, determine the stress in the bolt.

In: Civil Engineering

A sample of soil was tested; the results were void ratio e = 1.024 moisture content...

A sample of soil was tested; the results were
void ratio e = 1.024
moisture content w = 33.4%
specific gravity of solids Gs = 2.75

Using a phase diagram, determine the following:
a) The soil's bulk, dry and saturated unit weights, and degree of saturation;
b) The volume of air void in 1m^3 of this soil; and
c) The weight of water required to fully saturate the 1m^3 soil

In: Civil Engineering

What is the quoted current price for a new average-sized scraper and a bulldozer?

What is the quoted current price for a new average-sized scraper and a bulldozer?

In: Civil Engineering

Sanitation (fresh water in, human waste out) is the earliest known form of human leaders/governments taking...

Sanitation (fresh water in, human waste out) is the earliest known form of human leaders/governments taking a hand in issues of waste/pollution. Why do you think it was sanitation, as opposed to other wastes we've examined, that got the government involved? Do you think access to sanitation (clean water and a toilet) should be considered a human right, meaning that governments are obligated to provide it even to people who can't afford it?

In: Civil Engineering

n earthwork contract requires to cut and move excavated rocks. The site is a typical limestone...

n earthwork contract requires to cut and move excavated rocks. The site is a typical limestone rock formation in a cut section, which is 15,000 ft long, 85 ft wide, and 3 ft deep. Seismographic tests indicate a seismic wave velocity of 5,000 fps for the rock layer material. The contractor proposes to rip the rock with a 370-hp crawler tractor. Answer the following questions.

As a Construction Manager for this site development project, prepare detailed cost estimate for the project, and bid documents.

      Assume 10% time value cost of money, bonds, insurance, and storage over total direct cost, contingency at 2% of total direct cost, indirect overhead cost at 5% of total direct cost (additional on top of the equipment and operator costs), and 10% fee (on subtotal total of direct and indirect cost).

In: Civil Engineering

Short notes on 1) Ocean waves classification, and 2) wave transformation (e.g., shoaling, refraction), 3) RCP...

Short notes on 1) Ocean waves classification, and 2) wave transformation (e.g., shoaling, refraction), 3) RCP and SRES climate change scenario, 4) Risk assessment method.

In: Civil Engineering

An earthwork contract requires to cut and move excavated rocks. The site is a typical limestone...

An earthwork contract requires to cut and move excavated rocks. The site is a typical limestone rock formation in a cut section, which is 15,000 ft long, 85 ft wide, and 3 ft deep. Seismographic tests indicate a seismic wave velocity of 5,000 fps for the rock layer material. The contractor proposes to rip the rock with a 370-hp crawler tractor. Answer the following questions.
What is the total duration of the rock cut project assuming 10 hours per day work?

In: Civil Engineering

discribe how a request for information (RFI) from the contractor can lead to a Change Order

discribe how a request for information (RFI) from the contractor can lead to a Change Order

In: Civil Engineering

Describe Hooke’s Law with the use of a diagram and at least one example.

Describe Hooke’s Law with the use of a diagram and at least one example.

In: Civil Engineering

3. Smith’s bid of $542,000 was the lowest on a construction project that was advertised. The...

3. Smith’s bid of $542,000 was the lowest on a construction project that was advertised. The cost of the largest construction contract which Smith had previously performed was $78,000. What should the owner do to determine whether or not to let the contract to Smith?

In: Civil Engineering

1. Describe the goals/aims of performing Value Engineering and Constructability reviews on a project, the main...

1. Describe the goals/aims of performing Value Engineering and Constructability reviews on a project, the main differences between both approaches, and the phase during which each of the reviews is performed (planning vs. design vs. construction).

In: Civil Engineering

Draft a project proposal about AN agricultural project that you are about to start. Project 1:...

Draft a project proposal about AN agricultural project that you are about to start. Project 1: Goats farming (start with 100 Goats) Project 2: Crop farming (about 2.5 hectares), not fenced yet The proposal must be formal, well formatted and well articulated.

In: Civil Engineering

0. Describe the process used including advertising procedures to award public projects in the United States....

0. Describe the process used including advertising procedures to award public projects in the United States. And highlight the differences from the process/ procedures used to awarding contracts/projects in the private sector

In: Civil Engineering

9. a. Explain how auto exhaust, NOx and ozone (O3) are related. b. Explain the natural...


9.

a. Explain how auto exhaust, NOx and ozone (O3) are related.

b. Explain the natural process for formation and destruction of ozone in the stratosphere

c.Explain the human-caused destruction of ozone in the stratosphere.

In: Civil Engineering

ARCHITECTURE Take one façade of your chosen building and assume (for this exercise) that all solid...

ARCHITECTURE

Take one façade of your chosen building and assume (for this exercise) that all solid portions are precast concrete. Diagram the flow of forces showing primary and secondary forces and differentiating tensile forces from compressive ones. propose a new shape for the façade that is more efficient and expressive of the flow of forces.

It is important that you pick a façade that is not completely glass and includes some continuous nonglazed portions from top of wall down to the ground. The building should also have openings for windows and doors.

  • QUESTION 1 a diagram and brief commentary (around 250 words) that describe the flow of forces in your chosen building façade
  • QUESTION 2 a drawing and brief commentary (around 250 words) that describe your proposed new, more efficient and expressive shape for your façade

In: Civil Engineering