Assessment 5.0: Hand back process Produce a report (min 300 words) to detail the hand back...

Assessment 5.0: Hand back process Produce a report (min 300 words) to detail the hand back process as defined by the infrastructure controller and detail the factors that should be considered as part of the hand back process including the potential areas for special consideration which should be confirmed. Detail the requirements for construction records which form part of the hand back process. The assets will be handed-back to the procuring authority at contract expiration. It is good practice to establish minimum criteria to be met by the assets so as to ensure that these are transferred back to the procuring authority in an acceptable condition.

In: Civil Engineering

 (a) What are the negative health implication of metals in a structure/building? (b) Mention and...

 (a) What are the negative health implication of metals in a structure/building? (b) Mention and briefly explain five (5) famous structure/building that was constructed using steel.

In: Civil Engineering

Given a 3- layered system with the following information: a1=3.2 in , P or q =...

Given a 3- layered system with the following information: a1=3.2 in , P or q = 140 psi , h1=8in , E1=350,000 psi h2=16in , E2=17,500 psi and E3=8,750 psi. Find: 1.K1? 2.K2? 3.A? 4.H?

5.ZZ1? 6.ZZ2? 7.(ZZ1-RR1)? 8. (ZZ2=RR2)? 9. z1(kPa)? 10. z2 (kpa)? 11. r1 (kpa)? 12 r1?

In: Civil Engineering

Define and describe the key process flow and actions in place for an agreement to be...

Define and describe the key process flow and actions in place for an agreement to be converted into contract especially in terms of its scope of legality, competency and consequences of breaching. Explain and illustrate the legal terms “Assent” and “Acquiescence” in a common legal contract.

In: Civil Engineering

Engineers worldwide hold to the strong belief that man's enjoyment and continued existence on this planet...

Engineers worldwide hold to the strong belief that man's enjoyment and continued existence on this planet will depend on the care and protection he provides to the environment. Therefore, they adhere to certain principles when they embark on any professional activity. Discuss these principles.

In: Civil Engineering

What is the maximum tension (kN) on a cable carrying 2.5 kN/m uniform load if the...

What is the maximum tension (kN) on a cable carrying 2.5 kN/m uniform load if the lowest point of the cable is 40m and 3m away from the one of the support along the horizontal and vertical direction respectively? Round off to 3 decimal places.

In: Civil Engineering

What is the average percentage of time that construction workers and productive according to James Adrian...

What is the average percentage of time that construction workers and productive according to James Adrian (2004)?

In: Civil Engineering

A dump truck with a heaped capacity of 10 yd3 is used to dispose of excavated...

A dump truck with a heaped capacity of 10 yd3 is used to dispose of excavated material at a dump site 3.5 mile away from the job site. The average velocity of the dump truck is 40 kph. The dump time is 30 seconds, load time is 40 seconds. Assume a 50 minutes/hour efficiency, determine the production of the dump truck to complete the 12’ deep excavation of 100’x200’ size building footprint?

In: Civil Engineering

A circular plate having a diameter of 330 mm is held perpendicular to an axisymmetric horizontal...

A circular plate having a diameter of 330 mm is held perpendicular to an axisymmetric horizontal jet of air having a velocity of 43 m/s and a diameter of 88 mm as shown in the figure below. A hole at the center of the plate results in a discharge jet of air having a velocity of 43 m/s and a diameter of 22 mm. Determine the horizontal component of force required to hold the plate stationary.

F = N

the tolerance is +/-2%

In: Civil Engineering

Explain water supply strategies in sustainable design.

Explain water supply strategies in sustainable design.

In: Civil Engineering

Explain and detail Renewable Energy Systems

Explain and detail Renewable Energy Systems

In: Civil Engineering

Explain Design Build method

Explain Design Build method

In: Civil Engineering

Explain Storm water Management

Explain Storm water Management

In: Civil Engineering

1. a) What is the aim of intergrinding some gypsum rock with clinker during the production...

1. a) What is the aim of intergrinding some gypsum rock with clinker during the production of portland cement? b) What are the effects of adding insufficient amount of gypsum and too much gypsum on the cement?

In: Civil Engineering

If you are an Activity or Sub-Activity Manager, what should you look for in designs? State...

If you are an Activity or Sub-Activity Manager, what should you look for in designs? State which Activity or Sub-Activity you manage and any relevant examples of concerns that you have addressed.

In: Civil Engineering