Explain Design Build method

Explain Design Build method

Solutions

Expert Solution

In its simplest terms, Design-build is a method of project delivery in which one entity - the design-build team - works under a single contract with the project owner to provide design and construction services. One entity, one contract, one unified flow of work from initial concept through completion. the design-build construction delivery method replaces the traditional method of awarding separate contracts for design and construction. The contractor, designers, subcontractors and owner work together as one team to build a project that meets or exceeds the owner’s expectations. Team members focus on communication, collaboration and solving problems together rather than pointing fingers and placing blame. Design-build is also known as design/construct and single-source responsibility. Across the country and around the world, design-build successfully delivers office buildings, schools, stadiums, transportation, and water infrastructure projects with superior results.

Distinctive Characteristics of Design-Build

There are three distinctive characteristics in the Design-Build approach:

  1. Communicating instantaneously: being able to communicate instantaneously speeds the whole process which improves your project schedule.

  2. Conducting business without boundaries: you have no physical or geographical boundaries getting in the way of your timeline.

  3. Producing customized products: the ability to quickly produce products that are custom and not your prototypical replications.

A Design-Build Team is usually made up of people who have worked together before. They know each other’s strengths and weaknesses and can build off that knowledge to make the process more streamlined and successful.

Advantages of Design-Build

So what are some of the advantages of the Design-Build approach?  

  • Builds Teamwork

  • Single Point of Responsibility

  • Open/Transparent Communication

  • Eliminates Adversarial Conditions

  • Not Restricted to Building Types

  • Faster Project Delivery


Related Solutions

Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes,...
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes, claims, and disputes (Max 200 words).             
A Design-Bid-Build project delivery approach overlaps the design and construction phases, whereas the Design-Build approach requires...
A Design-Bid-Build project delivery approach overlaps the design and construction phases, whereas the Design-Build approach requires each phase to be completed before moving on to the next one. True False Identify ALL that apply: Under the Design-Bid-Build delivery method, there are legal contacts between which of the following. Owner-Engineer Owner-Contractor Engineer-Contractor Identify ALL that apply: The CM at Risk is responsible for: Means and Methods Quality Assurance Payment to Subcontractors Safety A General Contractor must be the employer of the...
Explain how it is that we build the “processRequest()” method in a Servlet class, when the...
Explain how it is that we build the “processRequest()” method in a Servlet class, when the Servlet interface requires us to write 3 methods(init(), service() and destroy()). Why don’t we have to build these 3 methods?  
Explain how it is that we build the “processRequest()” method in a Servlet class, when the...
Explain how it is that we build the “processRequest()” method in a Servlet class, when the Servlet interface requires us to write 3 methods(init(), service() and destroy()). Why don’t we have to build these 3 methods???
Explain the advantages and disadvantages of using the “build a little, test a little” method versus...
Explain the advantages and disadvantages of using the “build a little, test a little” method versus the “build the project, then test the project” method.
The project is to "Design and build an experiment to verify the first law of thermodynamics...
The project is to "Design and build an experiment to verify the first law of thermodynamics by stirring air with an electric motor powered paddle, in a well-insulated container." We are planning on finding the work of the motor and seeing if it equal to the change in internal energy of the container. The only problem is that we are confused on how to find the internal energy. What would be the best/easiest way to solve this? Also since the...
You are the Construction Manager for the Design and Build Contractor (and PSCS) for a project...
You are the Construction Manager for the Design and Build Contractor (and PSCS) for a project involving the construction of a multi-screen cinema and retail complex. You have had safety concerns in relation to the appointed scaffolding company, over a three weeks period. The issues raising concern include scaffolds being handed over in an unsafe state (missing toe boards, inadequate bracing and ties), scaffold workers operating at height not being tied-off, poor housekeeping and storage of materials on-site. Outline your...
Crossland Construction’s design/build department allows their clients (owners) to select the design and construction team based...
Crossland Construction’s design/build department allows their clients (owners) to select the design and construction team based on their combined experience and track-record. Design/build firms typically have a cash flow problem since they tend to be paid in lump sums when projects are completed or hit milestones. However, their expenses, such as payroll, must be paid regularly. So, such firms need bank lines of credit to finance their initial costs, but in the past year, lines of credit were difficult to...
Crossland Construction’s design/build department allows their clients (owners) to select the design and construction team based...
Crossland Construction’s design/build department allows their clients (owners) to select the design and construction team based on their combined experience and track-record. Design/build firms typically have a cash flow problem since they tend to be paid in lump sums when projects are completed or hit milestones. However, their expenses, such as payroll, must be paid regularly. So, such firms need bank lines of credit to finance their initial costs, but in the past year, lines of credit were difficult to...
Explain how to build a strip, what are the purposes of a strip strategy? Build a...
Explain how to build a strip, what are the purposes of a strip strategy? Build a real life strip for an American stock of your choice, pull the options contracts and paste them on the answer. Please explain each part of it, what the credit or debit will be for the transaction, include every detail of each option contract you will use to build the strip trade.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT