Question

In: Math

Time​ (days) Immediate Time​ (days) Immediate Activity a m b ​Predecessor(s) Activity a m b ​Predecessor(s)...

Time​ (days)

Immediate

Time​ (days)

Immediate

Activity

a

m

b

​Predecessor(s)

Activity

a

m

b

​Predecessor(s)

A

55

55

77

long dash—

H

44

44

66

​E, F

B

11

22

55

long dash—

I

22

77

1010

​G, H

C

55

55

55

A

J

22

44

77

I

D

44

88

1313

A

K

66

1010

1313

I

E

11

1010

1717

​B, C

L

22

66

66

J

F

11

55

77

D

M

22

22

33

K

G

22

66

99

D

N

77

77

1212

​L, M

Number of days that would result in​ 99% probability of completion​

Solutions

Expert Solution

For each activity we have got 3 time estimates

  • a=Optimistic time
  • m= Most probable time
  • b=Pessimistic time

Using these we can calculate the expected time (t) for each activity as below

for example for activity A, the expected time is

Next we need to find the variance of each activity given by the formula

For example for activity A, the variance is

The expected time and variances are given below

The values are

Next we need to find the critical path pf the project, using the expected time as fixed activity time.

The following is the PERT/CPM with the expected activity times.

We take the earliest start as the earliest end of the predecessor. For example activity D has A as the predecessor. Hence the earliest start of D is earliest end of A = 58.7. The earliest end is got by adding the activity time to the earliest start. When there are more than one predecessors, we take the maximum of the earliest end times. For example Activity E has B,C as predecessors. The end time of B is 25.7 and C is 113.7. Hence the earliest start of E is 113.7

Updated chart with earliest start and end dates, by moving from left to right

Finally we move from the right to left and fill in the latest start/end times

The latest end of any activity is the latest start of its successor. If there are more than one successor the latest end is the minimum of the latest starts. For example activity I has J and K as successors and their latest starts are 1346 and 2168.5. Hence the latest end for I is 1346.0

The final chart is below

The critical path (shown in green) are the activities with zero slack (ealiest time= latest time)

The critical path is A,C,E,H,I,K,M,N

The expected time of the project is the sum of expected times of the activities in the critical path.

The variance for the project completion is the sum of the variances of the critical path activities

Let T indicate the time taken to complete the project. T has normal distribution with mean and

standard deviation

Number of days that would result is 99% probability of completion is given as

the probability that a project would complete in less than t days is 0.99

That is P(T<t) = 0.99

We need to find the value of t.

The standardized value of T is

Now let us find the value of z for which P(Z<z) = 0.99.

If we use the standard normal table we can see that for z=2.33 we get P(Z<2.33) = 0.5+0.4901=0.99

We equate this to the standardized value of T and get

That means for 3546.66 days, the probability of completion is 99%


Related Solutions

Time​ (days) Immediate Time​ (days) Immediate Activity a m b ​Predecessor(s) Activity a m b ​Predecessor(s)...
Time​ (days) Immediate Time​ (days) Immediate Activity a m b ​Predecessor(s) Activity a m b ​Predecessor(s) A 55 55 77 long dash— H 44 44 66 ​E, F B 11 22 55 long dash— I 22 77 1010 ​G, H C 55 55 55 A J 22 44 77 I D 44 88 1313 A K 66 1010 1313 I E 11 1010 1717 ​B, C L 22 66 66 J F 11 55 77 D M 22 22 33...
Activity Normal Time (days) Normal Cost ($) Crash Time (days) Crash Cost ($) Immediate Predecessor(s) A...
Activity Normal Time (days) Normal Cost ($) Crash Time (days) Crash Cost ($) Immediate Predecessor(s) A 6 1,000 5 1,200 — B 4 800 2 2,000 — C 3 600 2 900 A, B D 2 1,500 1 2,000 B E 6 900 4 1,200 C, D F 2 1,300 1 1,400 E G 4 900 4 900 E H 4 500 2 900 G The Advanced Tech Company has a project to design an integrated information database for a...
1) Consider the network corresponding to the following information. Activity Immediate Predecessor(s) Time (Weeks) A ---...
1) Consider the network corresponding to the following information. Activity Immediate Predecessor(s) Time (Weeks) A --- 3 B --- 4 C A 6 D B 9 E B 6 F C, D 6 G D, E 8 H G, F 9 Draw the network corresponding to the above information. Using a table format, identify the critical path. What is the project completion time?
Activity Optimistic Time Estimate (weeks) Most Likely Time Estimates (weeks) Pessimistic Time Estimates (weeks) Immediate Predecessor(s)...
Activity Optimistic Time Estimate (weeks) Most Likely Time Estimates (weeks) Pessimistic Time Estimates (weeks) Immediate Predecessor(s) A 3 6 9 none B 3 5 7 A C 4 7 12 A D 4 8 10 B E 5 10 16 C F 3 4 5 D, E G 3 6 8 D, E H 5 6 10 F I 5 8 11 G J 3 3 3 H, I A.)Using the information given, construct a network diagram using AON notation....
Activities, predecessors and duration for a School Building Project Activity Description Immediate predecessor Duration (days) A...
Activities, predecessors and duration for a School Building Project Activity Description Immediate predecessor Duration (days) A Clear Site and mobilize labour and equipment None 5 B Excavate foundation A 15 C Procure materials (sand, cement, chippings etc.) A 10 D Pour foundation concrete B, C 5 E Mould sandcrete blocks (substructure) C 5 F Construct substructure block work D, E 15 G Construct superstructure block work F, H 30 H Make doors and window frames I 10 I Procure and...
The following activities are part of a project to be scheduled using CPM: ACTIVITY IMMEDIATE PREDECESSOR...
The following activities are part of a project to be scheduled using CPM: ACTIVITY IMMEDIATE PREDECESSOR TIME (WEEKS) A — 7 B A 6 C A 2 D C 4 E B, D 3 F D 4 G E F 6 a. Draw the network (20 points) b. What is the critical path? c. How many weeks will it take to complete the project ? d. Identify the early start, early finish, late start, and late finish for each activity...
Use the project description presented in the table below for the following questions: Activity Immediate Predecessor...
Use the project description presented in the table below for the following questions: Activity Immediate Predecessor Optimistic Time (O.T.) Most likely Time (M.T.) Pessimistic Time (P.T.) A None 4 6 9 B A 3 5 7 C A 4 7 12 D B 4 8 10 E C 5 9 15 F D 4 4 5 G D, E 3 6 8 H F 5 6 10 I G 5 8 11 J H, I 5 5 5 Calculate the...
QUESTION 5 A project has the following activities: Activity Duration, days Predecessor activity A 8 None...
QUESTION 5 A project has the following activities: Activity Duration, days Predecessor activity A 8 None B 7 A C 4 None D 11 C E 7 B & D The project started on Day 1. Assume 7 working days a week. For example, activity A start on Day 1 and finish on the end of day 8. John is responsible for both activities B and D. However, he CAN'T work on both of them on the same period. By...
Activity Predecessor Activity Duration in Weeks A ---- 3 B A 5 C A 7 D...
Activity Predecessor Activity Duration in Weeks A ---- 3 B A 5 C A 7 D B 10 E C 5 F D, E 4 Using the Critical Path Method (CPM), find the critical part, activities, and the date to finish the project (Gantt Chart would help). I would really appreciate excel screenshots!
The following table represents a plan for a project: PREDECESSOR JOB(S) TIMES (DAYS) JOB NO. a...
The following table represents a plan for a project: PREDECESSOR JOB(S) TIMES (DAYS) JOB NO. a m b 1 – 2 4 6 2 1 3 3 15 3 1 3 4 11 4 1 1 2 9 5 2 2 6 7 6 3 3 7 8 7 4 4 6 8 8 5,6 2 3 4 9 8 1 4 7 10 7 3 4 5 11 9,10 5 6 7    b. Indicate the critical path. 1-2-5-8-9-11...