A building company has been awarded the contract to undertake the construction works for a multi-storey...

A building company has been awarded the contract to undertake the construction works for a multi-storey office project in a city centre location. A deep basement is to be installed under one half of the building, within a layer of dense gravel.

The site is surrounded by public roads and buildings on all sides and it is expected that the water table is extremely close to the ground surface on a year-round basis.

You have been asked by the contractor to advise their company with regard to a number of issues on the project, in advance of the construction works.

  1. (a) What details would you provide to the contractor in relation to the options and methods available to dewater the soil on the project, to facilitate both the basement construction and trench excavations for utility ducting installation on the site? How would the range of dewatering methods be combined to produce a suitable solution?

  2. (b) Given the basic information available in relation to the location and ground conditions on this site, describe the particular options that you would recommend to the contractor for use on this specific site to assist in supporting the sides of the deep excavations during the basement construction.

Solutions

Expert Solution

1.

(a) What details would you provide to the contractor in relation to the options and methods available to dewater the soil on the project, to facilitate both the basement construction and trench excavations for utility ducting installation on the site?

i. Details that would be required is : type of soil, saturation, water depth, field density, bulkiness index of soil, free area available beside construction space to set up plant and machinery. Topography of area, traffic details, peak traffic time, type of buildings nearby, peak hours of office, permissions to be taken, permission already available

(b) How would the range of dewatering methods be combined to produce a suitable solution?

i. Given the details that location is congested, there is very less space for works which are to be done. For dewatering the soil whose Ground Water table is extremely close to ground level, pumps of higher capacity can be deployed and tanks can be placed on a mobile equipment which will enable movement of water pumped out easy. Since the space is very less, using a rig and structural steel sheets, sheet pile shall be placed and trench excavation can be executed.

2.

(a) Given the basic information available in relation to the location and ground conditions on this site, describe the particular options that you would recommend to the contractor for use on this specific site to assist in supporting the sides of the deep excavations during the basement construction.

            Being a deep excavation to the existing building, proper shoring method to be adopted. To support the sides of excavation, excavation to be done with slope as per approved codal provisions for the type of soil at site. Also, a sheet pile shall be inserted along the length of the excavation to avoid fall of soil or overburden.


Related Solutions

The Scenario: A construction company has been awarded the contract to build a pipeline in Alaska....
The Scenario: A construction company has been awarded the contract to build a pipeline in Alaska. The project timeline is of the highest priority because work can only be completed during summer months due to adverse weather conditions. One of the suppliers of a key component has longer lead time than is required to complete the pipeline, but may be able to deliver if the construction company will pay fees to expedite. There are other suppliers, but these suppliers are...
Construction Engineering question: Produce a environmental management plan Company has been awarded the contract for a...
Construction Engineering question: Produce a environmental management plan Company has been awarded the contract for a bridge replacement, including 2km approach resurfacing on each side and has placed you and your team in charge. Produce a environmental management plan. Thanks!!
CAT Construction has been awarded a contract with the City of Newberg to replace and repair...
CAT Construction has been awarded a contract with the City of Newberg to replace and repair all of the sidewalks in the older residential areas. Based on experience with previous​ projects, CAT feels the project completion time follows a normal distribution with a mean of 60 days and a standard deviation of 10 days. CAT anticipates the net profit for completing the project is​ $100,000. If the company completes the project is less than 40​ days, it will receive an...
ABC Construct Bina Sdn Bhd. is awarded a contract to construct 100 single storey houses. The...
ABC Construct Bina Sdn Bhd. is awarded a contract to construct 100 single storey houses. The construction method is using conventional method or in-situ construction. Concrete is the main material used in that construction project. a) Demonstrate the roles of parties involved in ensuring good quality of work is delivered during the construction project. b) Explain the assessment involved in ensuring the quality of the reinforced concrete structural elements. c) Discuss the possible problems related to poor quality control that...
Your company has just been awarded a project to renovate part of an existing occupied building....
Your company has just been awarded a project to renovate part of an existing occupied building. Your customer has stated that prior to starting work, all existing conditions are to be reviewed and a plan is to be developed off what you discover for how the work will be conducted so as to not interrupt/disrupt any of the existing occupants and their on-going activities. You decide to look to technology to help accomplish and expedite this task. Identify a technological...
Your company has been awarded a contract for 5-story addition on top of an existing 10-story...
Your company has been awarded a contract for 5-story addition on top of an existing 10-story hospital tower at a Cancer Center located in one of the most populated areas of Dallas, Texas. The existing hospital building is beyond 100% occupancy. The company was hired under a design-build contract to complete the $220 million project. Wind-load testing will be conducted. The wind-resisting system will be modified to redistribute loads on the mat foundation. High-strength concrete will be utilized for the...
case study: A leading maintenance management company has been awarded the contract for sole long- term...
case study: A leading maintenance management company has been awarded the contract for sole long- term maintenance of an airport including its hangars, control tower, parking and hotel facilities. Being a maintenance manager working for the company, suggest the most suitable ideas for the following situations. questions: 1. List five resources in this project which can have an MTBF or MTTF associated with them. Explain one benefit for each resource. 2. Explain any six benefits this project will experience by...
Mr. Phiri has been awarded a contract of supplying coarse aggregates to Junxi Engineering company who...
Mr. Phiri has been awarded a contract of supplying coarse aggregates to Junxi Engineering company who are working on Lusaka-Ndola dual carriage way. One of the condition for Mr. Phiri to supply the coarse aggregates is having his own quarry site and to employ a material’s Engineer for quality control purpose and technical advice. The material’s Engineer will give guidance on site selection for coarse aggregates which will be presented to the main contractor Junxi Engineering Company. You have been...
A construction company has entered into a contract to build a parking complex. It hsa been...
A construction company has entered into a contract to build a parking complex. It hsa been estimated the complex will cost 700,000 and will take three years to construct. The complex will be billed to the purchasing company at 1,200,000. Information is as follows. X1 YEAR. X2 YEAR X3 YEAR cost incurrect to date 350,000 490,000 700,000 estimated cost yet to be incurrect 350,000. 210,000. 0 customer billings to date 300,000. 650,000 1,200,000 collections of billings to date 250,000. 600,000....
Industrial Designs has been awarded a contract to design a label for a new wine produced...
Industrial Designs has been awarded a contract to design a label for a new wine produced by Lake View Winery. The company estimates that 150 hours will be required to complete the project. The firm’s three graphic designers available for assignment to this project are Lisa, a senior designer and team leader; David, a senior designer; and Sarah, a junior designer. Because Lisa has worked on several projects for Lake View Winery, management specified that Lisa must be assigned at...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT