Mr. Phiri has been awarded a contract of supplying coarse aggregates to Junxi Engineering company who...

Mr. Phiri has been awarded a contract of supplying coarse aggregates to Junxi Engineering company who
are working on Lusaka-Ndola dual carriage way. One of the condition for Mr. Phiri to supply the coarse
aggregates is having his own quarry site and to employ a material’s Engineer for quality control purpose
and technical advice. The material’s Engineer will give guidance on site selection for coarse aggregates
which will be presented to the main contractor Junxi Engineering Company. You have been engage by Mr.
Phiri as a Material’s Engineer and the first task is to give him a report on the site selection for the quarry
site.
a. Write a technical report to Mr. Phiri on the site selection of the aggregates.
b. What is aggregate gradation, how is it carried out and its importance in concrete production for Civil
Engineering projects?
c. Propose material to use for access roads for the entrance and give reason for selecting that material

d. What are air-entraining agent and what properties of concrete will be affected if air-entraining agent
is added?

Solutions

Expert Solution

​​​​​​


Related Solutions

Construction Engineering question: Produce a environmental management plan Company has been awarded the contract for a...
Construction Engineering question: Produce a environmental management plan Company has been awarded the contract for a bridge replacement, including 2km approach resurfacing on each side and has placed you and your team in charge. Produce a environmental management plan. Thanks!!
The Scenario: A construction company has been awarded the contract to build a pipeline in Alaska....
The Scenario: A construction company has been awarded the contract to build a pipeline in Alaska. The project timeline is of the highest priority because work can only be completed during summer months due to adverse weather conditions. One of the suppliers of a key component has longer lead time than is required to complete the pipeline, but may be able to deliver if the construction company will pay fees to expedite. There are other suppliers, but these suppliers are...
A building company has been awarded the contract to undertake the construction works for a multi-storey...
A building company has been awarded the contract to undertake the construction works for a multi-storey office project in a city centre location. A deep basement is to be installed under one half of the building, within a layer of dense gravel. The site is surrounded by public roads and buildings on all sides and it is expected that the water table is extremely close to the ground surface on a year-round basis. You have been asked by the contractor...
CIVIL ENGINEERING AGGREGATE TEST LAB REPORT (ESSAY) 2.4Specific Gravity for Coarse Aggregates 2.4.1 Objective 2.4.2 Scope...
CIVIL ENGINEERING AGGREGATE TEST LAB REPORT (ESSAY) 2.4Specific Gravity for Coarse Aggregates 2.4.1 Objective 2.4.2 Scope 2.4.3 Apparatus 2.4.4 Test Procedure 2.4.5 Test Result These are the topics. Please use computer font.
Your company has been awarded a contract for 5-story addition on top of an existing 10-story...
Your company has been awarded a contract for 5-story addition on top of an existing 10-story hospital tower at a Cancer Center located in one of the most populated areas of Dallas, Texas. The existing hospital building is beyond 100% occupancy. The company was hired under a design-build contract to complete the $220 million project. Wind-load testing will be conducted. The wind-resisting system will be modified to redistribute loads on the mat foundation. High-strength concrete will be utilized for the...
case study: A leading maintenance management company has been awarded the contract for sole long- term...
case study: A leading maintenance management company has been awarded the contract for sole long- term maintenance of an airport including its hangars, control tower, parking and hotel facilities. Being a maintenance manager working for the company, suggest the most suitable ideas for the following situations. questions: 1. List five resources in this project which can have an MTBF or MTTF associated with them. Explain one benefit for each resource. 2. Explain any six benefits this project will experience by...
CAT Construction has been awarded a contract with the City of Newberg to replace and repair...
CAT Construction has been awarded a contract with the City of Newberg to replace and repair all of the sidewalks in the older residential areas. Based on experience with previous​ projects, CAT feels the project completion time follows a normal distribution with a mean of 60 days and a standard deviation of 10 days. CAT anticipates the net profit for completing the project is​ $100,000. If the company completes the project is less than 40​ days, it will receive an...
Industrial Designs has been awarded a contract to design a label for a new wine produced...
Industrial Designs has been awarded a contract to design a label for a new wine produced by Lake View Winery. The company estimates that 150 hours will be required to complete the project. The firm’s three graphic designers available for assignment to this project are Lisa, a senior designer and team leader; David, a senior designer; and Sarah, a junior designer. Because Lisa has worked on several projects for Lake View Winery, management specified that Lisa must be assigned at...
Industrial design has been awarded a contract to design a label for a new wine produced...
Industrial design has been awarded a contract to design a label for a new wine produced by Lake View Winery.The company estimates that150 hours will be required to complete the project.The firm's three graphic designers available for to this project are Lisa,a senior designer and team leader; David , a senior designer; and Sarah, a junior designer. Because Lisa has worked on several projects for Lake View Winery, management has specified that Lisa must be assigned at least 40%of the...
Choose a company that has been part of your life (by supplying you with goods or...
Choose a company that has been part of your life (by supplying you with goods or services) – /Gym where I am almost every day for several years/. Profile your relationship with it in terms of planned messages, product messages, service messages, and unplanned messages. After examining each of these areas, examine your current attitude toward the company’s products and discuss what you think your future feelings will be