Project Scope Statement: The scope statement is the “top-level document for articulating the overall project goals, objectives, and mission-critical parameters, such as overall timing and resource constraints. It defines the project baseline for all other documentation and management actions.” (Thamhain, 2005, p. 148) The scope of a project defines what is included in and excluded from the project. Based on your project proposal and the information provided in the project charter, submit a list of what will be included in the scope of your project and what will be excluded. Include the following headings and include the necessary information under each heading based on your individual project. The Project Scope Statement should be no longer than a page or page and half (single spaced). • Project objective – 1-2 sentences o Example: To construct a high-quality custom insulated doghouse within 4 weeks at a cost not to exceed $5,000. • Deliverables: What are you going to accomplish. o Example: § A 5’ x 7’ finished doghouse with one doorway § White aluminum siding § Shingled Roof § One (1) Doorway • Milestones: Dates for specific high-level milestones for the project. o Example: § Permits approved – June 1, 2016 § Foundation poured – June 10, 2016 § Framed, siding and roof completed – June 25 § Final inspection – June 30 • Technical Requirements: o Examples: § Doghouse must meet local building codes. § Wall and ceiling insulation must meet ______. § Floor insulation must meet ______. • Limits and Exclusions o Examples: § The doghouse will be built to the specifications and designed provided by the customer. § Owner is responsible for landscaping. § Doghouse does not include windows or a door. § Site work will be limited to Monday through Friday, 8:00am5:00pm
PROJECT SCOPE STATEMENT