Imagine you are a project manager of a green roof top installation project. You have to make a critical path for your project? How can you do it?


Imagine you are a project manager of a green roof top installation project. You have to make a critical path for your project? How can you do it? Construct the critical network diagram (critical path) for this project.

Solutions

Expert Solution

The Green roof system is an addition of the suffering roof which infers, at any rate, transcending standard waterproofing, root resistant system, drainage system, channel material, a lightweight developing medium, and plants. Green roof expansion demands the creation of hold green space on a man-made structure. The temperature stabilizer impacts of green roofs can lessen demand on power plants and likely decrease the mass of CO2 and other contaminating results being released into the air. Greater defender gave by green roofs can limit the quantity of vitality required to decrease the temperature of a structure, as roofs are the site of the significant heat mislaying in the winter and the most sweltering temperatures in the mid year. It can assist a decent variety of plants and invertebrates and supply domain for various winged creature types and as a moving stone haunts for floating feathered creatures they can connect species together that would somehow or another be shattered. The ideal place for a green roof is under a higher roof and with a view from the house and entrance from an anteroom or window for preservation.

How to install the green rooftop on a structure? And The critical path of the Project Manager.

This can be installed by applying various planting trays or creating a skirt rooftop landscape area and the means to install a landscape area on a flat facet applying a preventive.

The two layers with at least one meager sheets of three quarter inch foam insulation flattered for contact with damp soil. Put a drainage mat with capillary spaces on the insulation and to shield the soil from obstructing the mat place the mat so the fondled side faces.

Mount the fringe for the roof with work canal guards and wood or another edging that will allow drainage to clutch the soil in place. In the middle of angle hold up may be required to remain the vertical edging extreme. The Parallel leg of the holdup can be tumbled under the drainage mat and weighted with the garnish soil to shield them from upsetting.

Add soil.

Set plants in place.

Water to settle soil around plants.

Being a project manager I have to take the accompanying strategies:

I suppose to be utilized Modular and Traditional System, Modular or serious systems are usually utilized on commercial roofs where the proprietors want a park-like setting for relaxing, eating, or working. All these systems are requiring a plant strategy that is more profound than a large scale system, typically starting at 6 inches. That gives you a broad assorted variety of vegetation, from herb gardens to large trees. Concentrated systems are setting on the right track on the waterproofing membrane. Not many modular systems are originated with open sides to allow the roots to round out the surface to avert damage to the membrane. The substantial primacy to these systems is the instant change to a green roof once installed.

A traditional built-up system has various names, for example, free laid, wall to wall, large scale, or uninterrupted. Anything you decide to call it, this is a layered system that ensures an elucidated area and is gathered on the roof. Broad systems are most ordinarily utilized on single or multi-family structures where pedestrian activity will be low by transplant mediums ranging from 1.5 to 6 inches, Immense systems are intended for least plant variety and are frequently installed on existing roofs. This system offers astounding insurance from UV rays, flotsam and jetsam, components, and root damage. Drainage, water maintenance, and plant health are typically higher as well and These systems are intended to act naturally sustaining, requiring less irrigation and maintenance compared to serious systems.

and the critical path for this project is


Related Solutions

Mark the WRONG statement. A. Some Project networks do not have a critical path. B. Activities...
Mark the WRONG statement. A. Some Project networks do not have a critical path. B. Activities on a critical path have a float of zero. C. A delay in critical activity surely delays the completion of project. D. A network can have more than one critical path. E. Each critical activity has identical earliest and the latest start times.
How can the project manager make sure the selected seller is committed to the project?
Conduct Procurements is the process of obtaining seller responses, selecting a seller, and awarding a contract. It's important the team takes the necessary time to evaluate the potential sellers for the project.Provide your answers to the following questions:2. How can the project manager make sure the selected seller is committed to the project?
An Exercise for Your Imagination Imagine you have been following a path for what seems time...
An Exercise for Your Imagination Imagine you have been following a path for what seems time without measure during a morning of swirling mists and diffused light when you feel the ground give softly under your leading foot. As your momentum carries you forward, wet ribbon-like strands hit your face before rubbing along either side, some few catching under your arms and between the fingers of your hands. Surprised, you stop and try to orient yourself, failing until a moment...
Green Energy Company has recently completed a $220,000, two-year study on its latest project, ‘Roof-top Solar”....
Green Energy Company has recently completed a $220,000, two-year study on its latest project, ‘Roof-top Solar”. It estimated that 28,000 units of its new Roof-top Solar units could be sold annually over the next 10 years at a price of $6,580 each. Subcontractors would install the unit at a cost of $4,700 per installation. Fixed costs of $11 million per annum will be incurred. The initial outlay includes $52 million to build production facilities and $4.2 million in land. The...
You have been appointed project manager for a company critical project. After a detailed WBS analysis...
You have been appointed project manager for a company critical project. After a detailed WBS analysis you have identified 15 key activities that make up the project. The following table details for each activity its duration and its preceding activities. Activity Preceding Activity Duration Days A - 8 B - 6 C A 5 D A 9 E B 5 F B 12 G D,E 4 H C 5 I H 12 J G,F 7 K J 10 L J...
Imagine that you are a project manager who was just assigned to a new project. You...
Imagine that you are a project manager who was just assigned to a new project. You received no additional information except that your primary constraint is time and the initial cost estimates should be based on previously completed projects. Assume that you were able to find ways to gather the information you needed, and that you have already created a project plan and schedule. Now imagine that your team discovers discrepancies in the material and resource costs. Since you used...
Imagine that you are asking your employees to make a change in the company: Please do...
Imagine that you are asking your employees to make a change in the company: Please do the following: [10:38 AM] Arezou Harraf 1. Identify what is the change 2. Who is involved 3. What are the change goals (what is success) 4. How would you communicate this change 5. How would you monitor this change mgt 220
How can you define critical path in Primavera P6? Provide a short paragraph of description. What...
How can you define critical path in Primavera P6? Provide a short paragraph of description. What is the Leveling tab in Primavera P6 used for? Describe how itworks using the Botanical Garden example. how to add/ delete columns on the activities page? what is Gantt chat? where can you view it in Primavera P6 ? write your on word
As a programmer in a java project, you have been asked by your project manager to...
As a programmer in a java project, you have been asked by your project manager to describe the most efficient way to store the following assigned numbers 10,20,30,1000,200,350 for an operation which involves on calculation such as sum and average.
Project Scheduling (incl. Network, Critical Path, WBS) Project: opening a new Restaurant. Anyone know how to...
Project Scheduling (incl. Network, Critical Path, WBS) Project: opening a new Restaurant. Anyone know how to create a critical path and wbs for this project? I did the network but I am not sure if I did it right.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT