Question

In: Civil Engineering

Thompson’s proposal for a building construction contract was for $125,500. After finding that his bid was...

Thompson’s proposal for a building construction contract was for $125,500. After finding that his bid was low, he checked his estimates and found that an item of $25,000 had been incorrectly recorded as $2,500 in making the summary of costs. Can he remove his bid? Is the contract likely to be valid? Why or why not? Explain your answer. To receive full credit, you should use the legal terms discussed in class.

Solutions

Expert Solution


Related Solutions

You are trying to decide whether to bid on a construction contract for a new bridge...
You are trying to decide whether to bid on a construction contract for a new bridge in South Carolina. You think that it will take 36 months to build and that construction costs will be $2 million per month. You expect tolls to be $10 million per year once the bridge opens, which will be offset by toll collection and maintenance costs of $2 million per year. Your (minimally acceptable rate of return) MARR is 15% per year. To bid...
Rookie Construction Limited (RCL) entered into a contract to construct a building for $975,000. The contract...
Rookie Construction Limited (RCL) entered into a contract to construct a building for $975,000. The contract provided for progress payments. RCL’s accounting year ends December 31. Work began under the contract on August 1, 2019, and was completed on October 31, 2021. RCL uses the percentage-of-completion method to account for this long-term contract. Construction activities are summarized below: 2019 2020 2021 Construction costs incurred to date 180,000 630,000 825,000 Estimated remaining costs to complete 630,000 190,000 0 Progress Billings during...
Cary Construction Inc. is preparing to bid on a job building a new dorm fo the...
Cary Construction Inc. is preparing to bid on a job building a new dorm fo the local college. Cary expects that the job will require $850,000 of direct materials, $500,000 of direct labor, and $425,000 of overhead costs. Administrative and other expenses for the job are expected to be $2,000. On average last year, Cary Construction earned about $250,000 profit on a job this size and would like to increase the profit by 5 percent on new contracts. Cary normally...
A building contractor is preparing a bid on a new construction project. Two other contractors will...
A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $500,000 and $700,000 B Normal probability distribution with a mean bid of $600,000 and a standard deviation of $40,000 If required, round your answers to three decimal places. If...
Problem 3 An entity entered into a construction contract to build a condo building at a...
Problem 3 An entity entered into a construction contract to build a condo building at a fixed price of $54,000,000. Construction started in 20x0 and ended in 20x3. Data on the contract is as follows (in ‘000’s): 20x0 20x1 20x2 20x3 Costs incurred during the year $ 6500 19500 25000 5800 Estimated costs to complete 38500 26000 6500 - Billings 18000 18000 - 18000 For each of the parts below, prepare the ‘mini’ income statement for the project for each...
You operate your own small building company and have decided to bid on a government contract...
You operate your own small building company and have decided to bid on a government contract to build a pedestrian walkway in a national park during the coming winter. The walkway is to be of standard government design and should involve no unexpected costs. Your present capacity utilization rate is moderate and allows sufficient scope to understand this contract, if you win it. You calculate your incremental costs to be $268,000 and your fully allocated costs to be $440,000. Your...
You operate your own small building company and have decided to bid on a government contract...
You operate your own small building company and have decided to bid on a government contract to build a pedestrian walkway in a national park during the coming winter. The walkway is to be of standard government design and should involve no unexpected costs. Your present capacity utilization rate is moderate and allows sufficient scope to understand this contract, if you win it. You calculate your incremental costs to be $268,000 and your fully allocated costs to be $440,000. Your...
You operate your own small building company and have decided to bid on a government contract...
You operate your own small building company and have decided to bid on a government contract to build a pedestrian walkway in a national park during the coming winter. The walkway is to be of standard government design and should involve no unexpected costs. Your present capacity utilization rate is moderate and allows sufficient scope to understand this contract, if you win it. You calculate your incremental costs to be $268,000 and your fully allocated costs to be $440,000. Your...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $530,000 and $730,000 B Normal probability distribution with a mean bid of $630,000 and a standard deviation of $43,000 If required, round your answers to three...
ABC Construction Co. signed a $2,000,000 contract to construct an office building for the State of...
ABC Construction Co. signed a $2,000,000 contract to construct an office building for the State of Arizona. The project will begin in 2017 and be completed in 2018. The cost of construction is expected to be $1,875,000. Below is a summary of events for 2017 and 2018: 2017 2018 Costs incurred during the year $ 712,500 $1,138,250 Estimated costs to complete 1,037,500 0 Billings during the year 850,000 1,150,000 Cash collections during the year 750,000 1,000,000 ABC Construction Co. recognizes...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT