Question

In: Civil Engineering

Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes,...

Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes, claims, and disputes (Max 200 words).             

Solutions

Expert Solution

In Design-Bid-Build project delivery method there is seperate contracts for design and construction.it generate competitions amoung contractors during bidding .The architects and contractors get connected only after placing the plan for bids.Since design and construction is not integrated it takes a lot of time for completion.Phases are implemented seperately one after the completion of the other.Designers does not have any access to construction cost so cost increase occur in designing time this delays project if the construction documents must be recreated to reduce cost.Construction will not be allowed until the design is fixed this takes more time for the project development.This increase risk of the owner.In this method owner have to act as a mediator between designers and contractors.

Design build method is a join venture of designer and contractor which makes it much more easier task for the owner through out the project development.The owner have to contact the designer only if he wants to clear any doubts.Since there is no bidding in this method,it is very time consuming method.Site preparation and construction can be started immediately after finalizing all the building details.So delivery will be more faster as compared to design bid build method.Design builders have acces to recent construction costs so they will design it in a cost effective manner.Since design and construction is combined most of the conflicts that can usually arisein a site can be eliminated.In short this method is the fastest deliver method with least risk for owner.


Related Solutions

A Design-Bid-Build project delivery approach overlaps the design and construction phases, whereas the Design-Build approach requires...
A Design-Bid-Build project delivery approach overlaps the design and construction phases, whereas the Design-Build approach requires each phase to be completed before moving on to the next one. True False Identify ALL that apply: Under the Design-Bid-Build delivery method, there are legal contacts between which of the following. Owner-Engineer Owner-Contractor Engineer-Contractor Identify ALL that apply: The CM at Risk is responsible for: Means and Methods Quality Assurance Payment to Subcontractors Safety A General Contractor must be the employer of the...
Briefly explain how the design of management compensation can affect conflicts of interest (i.e., agency problems)...
Briefly explain how the design of management compensation can affect conflicts of interest (i.e., agency problems) between managers and stockholders.
Explain Design Build method
Explain Design Build method
Explain how changes in variable costs generally affect the breakeven point. Explain how changes in sales...
Explain how changes in variable costs generally affect the breakeven point. Explain how changes in sales price generally affect the breakeven point.
Explain how missing data in randomised controlled trial will affect the conclusion and what methods can...
Explain how missing data in randomised controlled trial will affect the conclusion and what methods can be used to minimise the effect? (max. 200 words)
Explain how modern-day analysis and design on a large-scale software project affect the business world. In...
Explain how modern-day analysis and design on a large-scale software project affect the business world. In great details
Explain how the same protein can migrate differently on SDS page
Explain how the same protein can migrate differently on SDS page
Changes in project scope might affect the project’s schedule. Discuss this statement. How would a project...
Changes in project scope might affect the project’s schedule. Discuss this statement. How would a project manager formally can inform and communicate such adjustments to project stakeholders? need to state and discuss PM will inform and communicate.
Project Description The objective of this project is to design, simulate and build a speech filter....
Project Description The objective of this project is to design, simulate and build a speech filter. The design should operate on less that ±6 Volts DC. Please keep in mind that you should monitor the cost of the design components. Therefore you will need to determine the frequency band of speech and investigate low power options for the design. After reviewing the various tradeoffs which happens after design and simulations, you should then order the parts for the actual design....
Interconnection between the Respiratory system and Cardiovascular system? Explain how changes in one system can affect...
Interconnection between the Respiratory system and Cardiovascular system? Explain how changes in one system can affect the other and give two specific examples.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT