Use Word to create a task list with a minimum of 25 tasks for the project...

Use Word to create a task list with a minimum of 25 tasks for the project plan. The tasks should be in the format of verb then noun. Deliverable headings should be nouns. The list should be a complete plan to build a local area network in an office.

Solutions

Expert Solution

Tasks for building LAN for office

  1. Discussing to the IT department to calculate the capacity requirement of LAN for the office
  2. Calculate the number of ports and switches to satisfy your requirement
  3. Put forward the project proposal to the management
  4. Take approval from a proper authority
  5. Talk to the purchasing department to find suitable vendors
  6. Select viable vendors providing LAN equipment
  7. Float request for quotation to the selected vendors
  8. Analyze the quotations after receiving them to select the best vendor
  9. Negotiate with the vendor in price and service area
  10. Calculate the project completion time
  11. Select the best location for switches and ports for each department
  12. Plan the cable layout
  13. Take permissions from authorized department heads for excavation permits for laying cable
  14. Talk to the electrical department to provide power sources at each identified location
  15. Calculate the number of PCs or any device needed at each department to be connected
  16. Excavate if it is required for cable laying
  17. Attach switches and ports to each identified location
  18. Provide wireless devices if required by any department
  19. Connect each PC and devices requiring LAN connection
  20. Inform each department of testing of LAN
  21. Configure each switch and port and the computers
  22. Test each connected device
  23. Provide each device with a secure password to access LAN
  24. Add data protection and antivirus programs to each connected devices
  25. Calculate the costs contractors or vendors involved in the process
  26. Talk to the purchasing department for release of payment
  27. Close the project with all accountable calculations

please comment if any doubt

rate me

thanks


Related Solutions

describe a project list two task that may be performed in parallel and two tasks that...
describe a project list two task that may be performed in parallel and two tasks that need to be performed sequeooontially
A project consists of two tasks. Task A is scheduled to begin at the start of...
A project consists of two tasks. Task A is scheduled to begin at the start of Week 1 and finish at the end of Week 4. Task B is scheduled to begin at the start of Week 2 and finish at the end of Week 3. The budgeted cost for Task A is $80,000, and for Task B is $40,000. 1. Creat a cost loaded for this project: Round the number to the closest integer number and input it without...
create an implementation plan for Apple Inc. including milestones and deadlines, tasks and task ownership, and...
create an implementation plan for Apple Inc. including milestones and deadlines, tasks and task ownership, and resource allocation.
A project has just completed its 87th task of a total of 150 tasks in its...
A project has just completed its 87th task of a total of 150 tasks in its project plan. The project has a total budget of $1,500,000. It was scheduled to have spent $500,000 at this point in the plan, but has actually spent only $400,000. The project manager estimates that the value of the work actually finished is $300,000. What are the spending and schedule variances for the project? What are the SPI and CPI? What is the EAC, assuming...
Create a project schedule based on task dependencies and resource constraints
Create a project schedule based on task dependencies and resource constraints
For your task, provide responses to the following in a Word document and submit them: project...
For your task, provide responses to the following in a Word document and submit them: project name - Build an IT infrastructure for a medium size company that does accounting Explain why you selected this project Based on your project selection, explain what requirements and restrictions would be encountered Explain how you would go about constructing this project using an engineering approach
Medical Terminology Project: The project needs to be at least 300-word minimum and utilize 50 medical...
Medical Terminology Project: The project needs to be at least 300-word minimum and utilize 50 medical terms. The medical terms must be full medical terms. You may not use just prefixes, suffixes or word roots. The words must be from the Purple boxes in your book. They must be typed and medical terms must be highlighted but you may put this project together any way you like. You can write a paper, do a powerpoint or do something really creative....
Java Project Tasks: Create a Coin.java class that includes the following:             Takes in a coin...
Java Project Tasks: Create a Coin.java class that includes the following:             Takes in a coin name as part of the constructor and stores it in a private string             Has a method that returns the coins name             Has an abstract getvalue method Create four children classes of Coin.java with the names Penny, Nickle, Dime, and Quarter that includes the following:             A constructor that passes the coins name to the parent             A private variable that defines the...
Task 4:         Tuples Explain what is the difference between list, string and tuple? Create a list...
Task 4:         Tuples Explain what is the difference between list, string and tuple? Create a list example and check whether you could change the item within the list. Create a string example and check whether you could change the item within the string. Create a tuple example and check whether you could change the item within the tuple.
Required Tasks: In Eclipse, create a Java Project as CS-176L-Assign5. Create 3 Java Classes each in...
Required Tasks: In Eclipse, create a Java Project as CS-176L-Assign5. Create 3 Java Classes each in its own file Student.java, StudentList.java, and Assign5Test.java. Copy your code from Assignment 4 into the Student.java and StudentList.java Classes. Assign5Test.java should contain the main method. Modify StudentList.java to use an ArrayList instead of an array. You can find the basics of ArrayList here: https://www.w3schools.com/java/java_arraylist.asp In StudentList.java, create two new public methods: The addStudent method should have one parameter of type Student and should add...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT