What are the possible reasons for the development of the fractures in the lithosphere?
Need explanation and step by step solution and without
plagrism
In: Civil Engineering
Topic: Technical Report "Retaining Wall Design"
(Note: Briefly discuss in your own words, 1-2 paragraphs minimum.)
1.) Prepare a technical report about the "Retaining Wall Design" types and installation procedures.
2.) Explain the importance of retaining walls as structural (foundation) elements and their construction.
Provide at least one additional source to support your response if using any.
In: Civil Engineering
Civil engineering- Water Engineering
Q. State and discuss 7 technical challenges faced in water distribution systems [14]
In: Civil Engineering
A community’s groundwater has been contaminated by perchloroethylene after years of operation of a dry-cleaning business. Groundwater supplies a spring that feeds a pond and stream and is also the source for a well. A local family relies on the well for their drinking water and regularly eats fish caught in the stream and pond. The concentration of perchloroethylene in the groundwater is found to be 80 mg/L, and the chronic oral RfD is 0.006 mg/kg/day.
a.) Assuming all exposure to perchloroethylene comes from consumption of fish and water, and that children and adults eat the same amount of fish on average per day, calculate the Estimated Exposure Dose (EED) for an adult and a child.
b.) What are the adult and child hazard ratios (HR) for this scenario? Interpret the results.
The average body weight of an adult is 70kg, the average body weight of a child is 10kg, and the amount of fish consumed is 6.5g/day.
In: Civil Engineering
What are the steps for applying the Ishikawa (fishbone) method?
In: Civil Engineering
why baseflow is necessary to be seperated from the hydro graph ? explain the different methods to seperate it
In: Civil Engineering
HOW DO YOU DETERMINE IF A SECTION IS COMPACT OR NON COMPACT ACCORDING TO SLENDERNESS LIMITS
In: Civil Engineering
What are the situations where time is called to be ‘at large’? In reference to construction contracts.
In: Civil Engineering
Describe briefly a conceptual model of the hydrological cycle. Include in your discussion reasons for conceptualisation of the hydrological cycle in the manner required for development of your model. (typing answer please)
In: Civil Engineering
How would you go about testing rainfall records to access their reliability? you can assume that other rainfall records are available both in the same region and within close regions
In: Civil Engineering
Produce a fully researched and referenced report (indicative
word range 2,250–2,500 words) for a client that explains a
particular system, type or design of an innovative modern method of
construction suitable for a new primary school.
Your report should:
• include a critical appraisal that evaluates the relative merits
of this method of construction over that of a more traditional type
of construction;
• address various environmental and sustainability issues.
Please state any assumptions you make in the report. Assumptions
can be made as to any specific type of facility, arrangements,
layout or size. Please ensure that you write in your own words and
that all sources are fully referenced.
Report guidance
The report could look at an offsite system of prefabricated
schools.
In: Civil Engineering
describe briefly a conceptual model of the hydrological cycle includes in your discussion reasons for conceptualisation of the hydrological cycle in the manner required for development of your model
In: Civil Engineering
1) Moisture diffusion is when moisture-laden air infiltrates between different building materials. True or false?
2) Tyvek (or any house wrap) is generally considered to be a:
a. |
vapor retarder |
|
b. |
air retarder |
|
c. |
sheathing |
|
d. |
siding |
3) Moisture can enter a building through which of the following?
a. |
air infiltration |
|
b. |
capillary attraction |
|
c. |
diffusion |
|
d. |
leaks |
|
e. |
all of the above |
|
f. |
a and d only |
4) A "smart" vapor retarder (barrier) changes permeability with humidity. True or false?
5) In heated buildings, the vapor flow is generally
from the inside to the outside of the envelope. |
||
from the outside to the inside of the envelope. |
In: Civil Engineering
1. How does the organization encourage informed, Purposeful and active citizenship?
2. What can students do to be active within the chosen organization?
3. What has this assignment taught you about the importance about the organization's work?
In: Civil Engineering
Problem 2 The daily traffic has 1080 20-kip single axles, 400 24-kip single axles, and 680 40-kip tandem axles. Determine the Daily W18 and the 20-yr W18.
In: Civil Engineering