Question

In: Electrical Engineering

Three loads are connected in parallel to an AC supply of 120∠0° V. The loads are...

Three loads are connected in parallel to an AC supply of 120∠0° V. The loads are 40∠30° Ω, 50 - j30 Ω
and 30 + j40 Ω.
a) Draw the circuit diagram
b) Determine the amplitude and phase angle of the supply current graphically by constructing a
phasor diagram using a suitable scale of the load currents and source voltage.
c) State the overall power factor using the answer from part (b).
d) Construct another phasor diagram for the system that illustrates an improved power factor to
unity.
e) Determine the VAR rating of the load required to achieve this using its current phasor determined
graphically from part (d). State its capacitance or inductance.
f) Draw the power triangles for the system before and after power factor correction.

Solutions

Expert Solution


Related Solutions

Two loads connected in parallel draw a total of 4 kW at 0.68pf lagging from a 120-v ms, 60-Hz line.
Two loads connected in parallel draw a total of 4 kW at 0.68pf lagging from a 120-v ms, 60-Hz line. One load absorbs 3.3 kVAR at a 0.6 pf lagging. Determine: a) The pf of the second loadb) The capacitor value in Farads required to correct the overall pf from 0.68 to 0.9 lagging for combine loads. c) The current drawn from the supply under the new power factor of 09.
Three balanced 3-phase loads are connected in parallel. Load 1 is Y-connected with an impedance of...
Three balanced 3-phase loads are connected in parallel. Load 1 is Y-connected with an impedance of 400 + j300 ? per phase, load 2 is ?-connected with an impedance of 2400 – j1800 ? per phase, and load 3 is absorbing 172.8 + j2203.2 kVA. The loads are fed from a set of distribution lines with an impedance of 2 + j16 ? per line. The magnitude of the line-to-neutral voltage at the load end of the line is 24?3...
A 1.0 toaster and a 2.0 lamp are connected in parallel with the 110-V supply of...
A 1.0 toaster and a 2.0 lamp are connected in parallel with the 110-V supply of your house. (Ignore the fact that the voltage is AC rather than DC.) (a) Draw a schematic of the circuit. (b) For each of the three components in the circuit, find the current passing through it and the voltage drop across it. (c) Suppose they were instead hooked up in series. Draw a schematic and calculate the same things.
A balanced three-phase delta-connected source has a line veltage of 120 V. It is connected to...
A balanced three-phase delta-connected source has a line veltage of 120 V. It is connected to a load via a three-wire transmission line. The per-phase impedance of the delta-connected load is 30 + 120j (2. The impedance of each wire of the transmission line is 2 + 4j 2. How much power is dissipated by the load? By the transmission line? What is the power factor of the load? What is the overall power factor?
A 280-V, 3Ø AC power system, Y-connected three-phase generator connected through a three-phase transmission line to...
A 280-V, 3Ø AC power system, Y-connected three-phase generator connected through a three-phase transmission line to a Y-connected load. The transmission line has an impedance of (0.02+j0.4) Ω/phase, and the load has an impedance of (4+j3) Ω per phase. Determine the;(a)line current (IL) at the load [2Marks] (b)line and phase voltage of the load[2 Marks](c)active power, reactive and apparent power [2 Marks](d) power factor and specify whether it is lagging or leading. [4 Marks]
The charger for a cellphone contains a transformer that reduces 120 V AC to 4.92 V...
The charger for a cellphone contains a transformer that reduces 120 V AC to 4.92 V AC to charge the 3.7 V battery. Suppose the secondary coil contains 50 turns and the charger supplies 680 mA. Calculate (a) the number of turns in the primary coil, (b) the current in the primary, (c) the power transformed and (d) repeat parts (a) to (c) with a 240 V AC to 6.78 V AC
Two parallel connected loads take a total of 2.4 kW, with a 0.8 line delay at...
Two parallel connected loads take a total of 2.4 kW, with a 0.8 line delay at 120 Vrms and 60 Hz. One load absorbs 1.5 kW with a fp delay of 0.707. Determine: a) The fp of the second charge b) The parallel element required to correct the fp of the two loads and convert it to a delay of 0.9
Two loads Z1 = 100+j0 ? and Z2=10+j20 ? are connected in parallel across a 200...
Two loads Z1 = 100+j0 ? and Z2=10+j20 ? are connected in parallel across a 200 V supply. 1) Write a user oriented MATLAB program that will calculate the capacitance of the capacitor connected across the loads to improve the overall power factor to 0.8 lagging,0.9 lagging, unity power factor, 0.8 leading, 0.9 leading. Also MATLAB will calculate total reactive, real power, and the total current at the source for each ste
Write an expression for the instantaneous voltage ?(?) delivered by an ac generator supplying 120 V...
Write an expression for the instantaneous voltage ?(?) delivered by an ac generator supplying 120 V rms at 70 Hz. Assume the voltage is 0 at time ?=0, and leave the factors in exact form; do not round their values. Write the argument of the sinusoidal function to have units of radians, but omit the units.
An AC generator supplies an rms voltage of 230 V at 60.0 Hz. It is connected...
An AC generator supplies an rms voltage of 230 V at 60.0 Hz. It is connected in series with a 0.300 H inductor, a 4.30 μF capacitor and a 256 Ω resistor. What is the impedance of the circuit? What is the rms current through the resistor? What is the average power dissipated in the circuit? What is the peak current through the resistor? What is the peak voltage across the inductor? What is the peak voltage across the capacitor?...