Determine the size of the high rate trickling filter for the following data: Sewage flow is...

Determine the size of the high rate trickling filter for the following data: Sewage flow is 5 MLD; Recirculation factor is 1.89; Raw wastewater BOD is 230 mg/L; BOD removed in PST is 30%; Final desired BOD in the treated effluent is 25 mg/L

pls send the sol fast in rough only i need it urgent

Solutions

Expert Solution


Related Solutions

Design a low rate trickling filter for secondary treatment of sewage generated from 10,000 persons with...
Design a low rate trickling filter for secondary treatment of sewage generated from 10,000 persons with rate of water supply 170 liters per capita per day. The BOD5 after primary treatment is 110 mg/L and BOD5 of final effluent should be 20 mg/L. Consider the following equation, where C = 5.358. (St/So)=(1)/(1+C((D^0.67)/(QL^0.5)) Now, design a high rate trickling filter for the data given above except effluent BOD5 is 40 mg/l since polishing treatment is provided after high rate trickling filter....
following facilities the trickling filter, and the Aeration basion are used for clarification of water and...
following facilities the trickling filter, and the Aeration basion are used for clarification of water and wastewater during treatment. Write short notes on each one of them with more emphasis on the similarities and differences in treatment processes, advantages and disadvantages between them.
data:highrate trickling filter pipe dia = 30m deep = 1m swage flow = 4.5mld recirulation ratio...
data:highrate trickling filter pipe dia = 30m deep = 1m swage flow = 4.5mld recirulation ratio = 1.4 bod of raw sewage = 250mg/l bod removed in primary clarifier = 25% efficiency? (ans:74%)
Q) Determine using the NRC formula, the BOD5 of the effluent from a single-stage, low-rate trickling...
Q) Determine using the NRC formula, the BOD5 of the effluent from a single-stage, low-rate trickling filter that has a filter volume of 1,500 m3 , a hydraulic flow rate of 0.26 m3/s, and a recirculation ratio of 1.5. The influent BOD5 is 360 mg/L. Would the single stage be sufficient to achieve the WHO BOD efficacy? If not how can you improve the system efficiency and provide the necessary calculations? Q) A. Design a set of three rectangular grit...
rapid sand filter will be constructed for average flow rate of 0.06 m3 / h. Design...
rapid sand filter will be constructed for average flow rate of 0.06 m3 / h. Design (...find dimensions...) and draw the filter.
Determine the minimum and maximum internal rate of return for the following cash flow. Use Excel....
Determine the minimum and maximum internal rate of return for the following cash flow. Use Excel. Year Net Cash 0 -2500 1 1500 2 1000 3 -1500 4 900 5 500
Determine the rate law for the reaction A+ B → C given the following initial rate data.
Determine the rate law for the reaction A+ B → C given the following initial rate data. [A], M [ B], M ∆[C]/∆t (mol/L•s) 0.10 0.20 40. 0.20 0.20 80. 0.10 0.10 40.
Plot the following data and determine the average rate for the loss of reactant at t...
Plot the following data and determine the average rate for the loss of reactant at t = 25 sec. Enter the numerical answer with 2 significant figures, no units and in scientific notation. For example; .00126 M/min would be entered as 1.3E-3 (no spaces) 2 A(g) → B 2(g) Time(sec) [A]: (mol/L) 0.0: 3.20x10-5 10.0: 2.42x10-5 20.0: 1.95x10-5 30.0: 1.63x10-5 40.0: 1.40x10-5 50.0: 1.23x10-5 60.0: 1.10x10-5
If the flow rate of soil waste is 205 GPM, what size drainpipe will be needed...
If the flow rate of soil waste is 205 GPM, what size drainpipe will be needed for: a. A slope of 1/2 inch per foot of fall? What is the flow rate of the drainpipe selected? b. A slope of 1 ∕8 inch per foot of fall? What is the flow rate of the drainpipe selected?
Determine the size of the multiplier from the above data. Show your working.
Use the table below to answer the following questions. All data are in $ billions. Real GDP Consumption (C) $ 500 $ 495 510 504 520 513 530 522 540 531 550 540 560 549 Determine the size of the multiplier from the above data. Show your working. Determine the equilibrium real GDP if taxes are zero, government purchases are $5, investment is $3, and net exports are zero. Show your working and explain your answer. Determine the equilibrium real...