In: Civil Engineering
As regarding the concrete lab, you will be required to fabricate
6 standard concrete
cubes (100 mm) for compression testing.
Mass ratios:
Mix 1 (30 MPa) – 1:2:4 with w/c = 0.6
Specific gravity of materials:
Cement: 3.15
Fine and coarse aggregate: 2.60
Calculate the Quantity of material?
1)First let us calculate the quantity of concrete required.
Volume of 1 concrete cube =0.1 x 0.1 x 0.1
=0.001 Cubic meter
For 6 cubes =0.001 x 6=0.006 Cubic meter
The dry volume will be 54% more than the actual volume required
Hence dry voulme =1.54 X 0.006
=0.00924 Cubic meter
Given the ratio =1:2:4
Volume of cement =(0.00924/7) x 1 =0.00132 Cubic meter
Volume of fine aggregate=(0.00924/7) x 2 = 0.00264 Cubic meter
Volume of Coarse aggregate =(0.00924/7) x 4 =0.00528 Cubic meter
Specific gravity of cement = 3.15g/cc =3150kg/cubic meter
weight of cement =0.00132 x 3150 =4.158 Kg
Specific gravity of fine and coarse aggregate =2.6g/cc =2600 Kg/cubic meter
weight of fine aggregate = 0.00264 x 2600 =6.864 kg
Weight of Coarse aggregate = 0.00528 x 2600 =13.728 Kg
weight of water = 0.7 x 4.158 =2.9 kg