Question

In: Civil Engineering

A mass balance is performed for a treatment process consisting of a sedimentation tank followed by...

A mass balance is performed for a treatment process consisting of a sedimentation tank followed by a mixing tank. First, 25097 m3/d of raw wastewater with solids concentration of 180 mg/l flows into the sedimentation tank. 97% of the incoming solids end up in the sludge. The effluent flows at a rate of 1040 m3/hr. Next, the effluent of the sedimentation tank enters the mixing tank where it is mixed with pure filtered water. Assume that the density is the same for all streams. Calculate the following: a) Flow (m3/d) of the sludge in the sedimentation tank. b) Solids concentration (mg/l) of the effluent in the sedimentation tank. c) Flow (m3/d) of the pure filtered water, knowing that that the final effluent of the mixing tank will be used in irrigation with a ma ximum solids concentration of 97 mg/l.

Solutions

Expert Solution


Related Solutions

what is the wastewater treatment principal and layout? Discuss how to design a sedimentation tank
what is the wastewater treatment principal and layout? Discuss how to design a sedimentation tank
How can sewage treatment that combines both aeration and sedimentation in the same tank can be...
How can sewage treatment that combines both aeration and sedimentation in the same tank can be improve to treat high concentration of ammonia?
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process...
A wastewater treatment plant that treats wastewater to secondary treatment standards uses a primary sedimentation process followed by an activated sludge process composed of aeration tanks and a secondary clarifiers. This problem focuses on the activated sludge process. The activated sludge process receives a flow of 15 million gallons per day (MGD). The primary sedimentation process effluent has a BOD5 concentration of 180 mgBOD5/L (this concentration is often referred as S). Before flowing into the activated sludge process, the primary...
2. Calculate the volume and dimensions of a rectangular sedimentation tank for a flow rate of...
2. Calculate the volume and dimensions of a rectangular sedimentation tank for a flow rate of 10,000 gpm based on a maximum overflow rate of 650 gallons per day/sq ft. Also, determine the length of the effluent weir and calculate the horizontal flow velocity in the tank.
- A primary sedimentation basin for a municipal waste water treatment plant treats a flow of...
- A primary sedimentation basin for a municipal waste water treatment plant treats a flow of 3 MGD and removes 70 percent of the total suspended solids..The basin is 60ft in diameter with a depth of 15 ft. the TSS removed (kg)in the basin about ?
Sedimentation basins are employed both in filter plants for drinking water treatment and in municipal wastewater...
Sedimentation basins are employed both in filter plants for drinking water treatment and in municipal wastewater treatment plants. Briefly explain what solids are removed in each of these sedimentation basins.
How can I design a rectangular sedimentation tank? Inputs: Average Flowrate , Peak Flowrate ,Number of...
How can I design a rectangular sedimentation tank? Inputs: Average Flowrate , Peak Flowrate ,Number of tanks, W:L ratio , Launder width, Sidewall depth ,Bottom slope, MLSS concentration ,Recycle ratio (R) Outputs: Length , Width ,Surface loading (for Qave and Qpeak) ,Weir type (one-sided, two-sided, 1/3 of length, corrugated) Weir loading (for Qave and Qpeak) ,Solids loading (for Qave and Qpeak) ,Retention time (for Qave and Qpeak) ,Horizontal velocity (for Qave and Qpeak) (if it is rectangular)
If the volume is the same in the whole process, the process is performed with an...
If the volume is the same in the whole process, the process is performed with an isochoric. Select one: True False -------------------------------------------------------------------------------------------------------------------- Every quasistatic process is necessarily reversible Select one: True False ---------------------------------------------------------------- The a / v2 term in the van der Waals equation is caused by the forces exchanging between molecules Select one: True False
Briefly describe each of the 5 steps of water treatment Aeration Coagulation (flocculation) Sedimentation Filtration Disinfection
Briefly describe each of the 5 steps of water treatment Aeration Coagulation (flocculation) Sedimentation Filtration Disinfection
The PLC program simulates a process tank being filled with a fluid. The tank will start...
The PLC program simulates a process tank being filled with a fluid. The tank will start filling (via a valve) whenever the start process button is enabled and the tank is below 50% full. It will shut off when the tank is 100% full. In case the level sensor is out of calibration or not working properly, there is a high-level safety limit to prevent the tank from overfilling. If the high limit is met at a preset value of...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT