In: Civil Engineering
- A primary sedimentation basin for a municipal waste water treatment plant treats a flow of 3 MGD and removes 70 percent of the total suspended solids..The basin is 60ft in diameter with a depth of 15 ft. the TSS removed (kg)in the basin about ?
This can be solved as follows.
Here concentration of total suspended solid is not given so either we assume any value or take an variable.
Calculation....