In: Civil Engineering
2. Calculate the volume and dimensions of a rectangular sedimentation tank for a flow rate of 10,000 gpm based on a maximum overflow rate of 650 gallons per day/sq ft. Also, determine the length of the effluent weir and calculate the horizontal flow velocity in the tank.