Construct a precedence diagram (AON) b) On the diagram, compute the four activity dates (ESD, EFD,...

Construct a precedence diagram (AON) b) On the diagram, compute the four activity dates (ESD, EFD, LSD, and LFD) and the floats (TF and FF) for each activity. c) Identify critical event(s), critical activities, and critical path(s) Please calculate and show results on the diagram in the following form: Act Time Predecessors B 5 - M 4 B N 9 B P 8 B L 6 M F 5 M,N C 8 N,P K 6 P G 7 L,F,C A 3 F,C D 7 C,K E 13 K H 3 G,A J 2 D,E,H

Solutions

Expert Solution


Related Solutions

For the accompanying data​ set, (a) draw a scatter diagram of the​ data, (b) compute the...
For the accompanying data​ set, (a) draw a scatter diagram of the​ data, (b) compute the correlation​ coefficient, and​ (c) determine whether there is a linear relation between x and y. x 2 6 1 7 9 y 8 2 6 9 5 Critical Values for Correlation Coefficient n 3 0.997 4 0.950 5 0.878 6 0.811 7 0.754 8 0.707 9 0.666 10 0.632 11 0.602 12 0.576 13 0.553 14 0.532 15 0.514 16 0.497 17 0.482 18...
For the accompanying data​ set, (a) draw a scatter diagram of the​ data, (b) compute the...
For the accompanying data​ set, (a) draw a scatter diagram of the​ data, (b) compute the correlation​ coefficient, and​ (c) determine whether there is a linear relation between x and y.    Data set x 7 6 6 7 9 y 3 2 6 9 5 Critical Values for Correlation Coefficient n 3 0.997 4 0.950 5 0.878 6 0.811 7 0.754 8 0.707 9 0.666 10 0.632 11 0.602 12 0.576 13 0.553 14 0.532 15 0.514 16 0.497...
Question 1 a. Draw a precedence diagram for the following fabrication of steel project. For each...
Question 1 a. Draw a precedence diagram for the following fabrication of steel project. For each activity, show the computed values of early start, early finish, late start, late finish, total float, free float and the critical path. Activity Immediate Predecessor Duration (weeks) A None 2 B A 4 C A 2 D B 2 E B, C 4 F A, E 6 G D 4 H D, E, F 2 I G, H 6 J H, F 6 K...
1. A precedence diagram is shown below. Solve the network for the basic scheduling information. For...
1. A precedence diagram is shown below. Solve the network for the basic scheduling information. For each activity, show the computed value of early start, early finish, late start, late finish, total float, and free float.   Activity Duration mobilize 1 remove siding 4 excavate/form slab 7 place slab 4 set support beam 1 stud wall up 6 install siding 4 install windows 5 set raffers 4 install roof 6 finish trim 4 paint siding 7 move out 1
A project has the following activities, precedence relationships, and time estimates in weeks: ​ Activity Immediate...
A project has the following activities, precedence relationships, and time estimates in weeks: ​ Activity Immediate Predecessor Activities Optimistic Time (to) Most Likely Time (tm) Pessimistic Time (tp) A — 15 20 25 B — 8 10 12 C A 25 30 40 D B 15 15 15 E B 22 25 27 F E 15 20 22 G D 20 20 22 ​ a.   Compute the expected time and variance for each activity. b.   Determine the critical path and the expected...
Problem #4 PERT Analysis: Consider the project with the following estimates for activity times and precedence...
Problem #4 PERT Analysis: Consider the project with the following estimates for activity times and precedence relationships (be sure to use the triple time estimate). All times are in days: Activity Optimistic Time Most Likely Time Pessimistic Time Immediate Predecessor(s) A 3 4 6 --- B 5 7 10 --- C 2 3 11 A D 2 5 8 B E 1 7 7 B F 3 5 7 C, D G 7 8 9 D, E H 2 6...
A project for improving a billing process has the following precedence relationships and activity​ times: Using...
A project for improving a billing process has the following precedence relationships and activity​ times: Using the info below calculate the slack for each activity. Which activities are on the critical path?                                                                                                           Activity Activity Time​ (weeks) Immediate​ Predecessor(s) A 5 ---- B 10 ----- C 6 A D 14 ​B, C E 9 B F 5 D G 3 E H 6 ​F, G
Maturity Dates of Notes Receivable Determine the maturity date and compute the interest for each of...
Maturity Dates of Notes Receivable Determine the maturity date and compute the interest for each of the following notes: (Use 360 days for interest calculation. Round to the nearest dollar.) Date of Note Principal Interest Rate Term a. August 5 $12,000 8% 45 days b. May 10 33,600 7% 75 days c. October 20 48,000 9% 120 days d. July 06 9,000 10% 45 days e. September 15 18,000 8% 90 days
Maturity Dates of Notes Receivable Determine the maturity date and compute the interest for each of...
Maturity Dates of Notes Receivable Determine the maturity date and compute the interest for each of the following notes: (Use 360 days for interest calculation. Round to the nearest dollar.) Date of Note Principal Interest Rate Term a. July 10 $7,200 9% 100 days b. April 14 12,000 8% 130 days c. May 19 11,200 7.5% 130 days d. June 10 5,400 8% 55 days e. October 29 30,000 8% 85 days Maturity Date Month Day Interest a. AnswerDecemberNovemberOctoberSeptemberAugustJulyJuneMayAprilMarchFebruaryJanuary Answer...
Four displacement vectors, A, B, C, and D, are shown in the diagram below. Their magnitudes...
Four displacement vectors, A, B, C, and D, are shown in the diagram below. Their magnitudes are:  A = 16.2 m, B = 11.0 m, C = 12.0 m, and D =  24.0 m What is the magnitude, in meters, and direction, in degrees, of the resultant vector sum of A, B, C, and D? Give the direction as an angle measured counterclockwise from the +x direction.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT