If you have these 2 constraints:

0.6R+4D £180,000 Machine Hour constraint

3R+5D £150,000 Direct Labor Hour constraint

Required:

a Draw a graph showing the possible production plans for this company.

b- From your opinion where is the feasible area of the production plan. Explain your answer.

Solutions

Expert Solution

Plotting of constraint line on graph:

The feasible area for machine hour constraint is O-E-F

The feasible area for labor hour constraint O-A-B

The common feasible area for which both constraints satisfied is O-A-B-O.

According to extreme points method, the optimal solution can be on points O, A, and B.

At point O, R = 0 , D = 0

At point A, R = 50,000 and D = 0

At point B, R = 0 and D = 30,000


Related Solutions

Barnville applies overhead at a rate of $6.00 per direct labor hour. The direct labor rate...
Barnville applies overhead at a rate of $6.00 per direct labor hour. The direct labor rate is $10.00 per hour. During June, Jobs B, C, and D were started. The following is information on costs incurred in June:   Job     Direct materials Direct labor hours                             A           $200                            5 B            $380                           18 C            $500                           40 D            $150                            8 Jobs A, B and C have been completed. At June 30, only Job D is still is process. Question 1: Required:...
Actual quantity of direct labor 5,000 hours Actual direct labor rate $10 per hour Total direct...
Actual quantity of direct labor 5,000 hours Actual direct labor rate $10 per hour Total direct labor variance $8,600 Unfavorable . Direct labor rate variance $4,000 Unfavorable . Standard hours allowed per unit produced 2 hours Required: Find the following unknowns. a. Direct labor efficiency variance b. Standard rate per direct labor hour c. Actual quantity produced
12. The per-unit standards for direct labor are 1.5 direct labor hours at $15 per hour....
12. The per-unit standards for direct labor are 1.5 direct labor hours at $15 per hour. If in producing 3400 units, the actual direct labor cost was $69750 for 4500 direct labor hours worked, the total direct labor variance is $2250 unfavorable. $6750 unfavorable. $6750 favorable. $3400 unfavorable. 13. A company purchases 10000 pounds of materials. The materials price variance is $7000 favorable. What is the difference between the standard and actual price paid for the materials? $1.43 $0.70 $7.00...
what is constraints and what is a legal and ethical considerations in using constraint when you...
what is constraints and what is a legal and ethical considerations in using constraint when you are working with people who have disability?
Mickley Company’s plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $23.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-500: Direct materials $ 280 Direct labor $ 120 Required: 1. What is the total manufacturing cost assigned to Job A-500? 1b. If Job A-500 consists of 30 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage...
Mickley Company’s plantwide predetermined overhead rate is $20.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-500: Direct materials $ 210 Direct labor $ 60 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 50 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.)
The standards for product G78V specify 6.1 direct labor-hours per unit at $14.10 per direct labor-hour....
The standards for product G78V specify 6.1 direct labor-hours per unit at $14.10 per direct labor-hour. Last month 1,800 units of product G78V were produced using 11,030 direct labor-hours at a total direct labor wage cost of $146,220. Required: a. What was the labor rate variance for the month? b. What was the labor efficiency variance for the month? (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero...
Hi: I have a linear programming problem with 3 constraints (written as equalities): Constraint A: X...
Hi: I have a linear programming problem with 3 constraints (written as equalities): Constraint A: X + Y = 150,000 Constraint B: X = 75,000 Constraint C: Y = 60,000 How would the corner point method be utilized to complete the feasibility region (determine the corner points)? As can be seen, constraint B results in a horizontally bound line (to infinity) and contraint C results in a vertically bound line (to infinity). Thanks in advance!
Deck Department Engine Department Direct materials 180,000 540,000 Direct labor 30,000 24,000 Manufacturing overhead 90,000 96,000...
Deck Department Engine Department Direct materials 180,000 540,000 Direct labor 30,000 24,000 Manufacturing overhead 90,000 96,000 a. Instructions Compute the following per-unit costs for the month of May. A deck assembly transferred to the Engine Department. Assembling an engine and installing it. A completed lawnmower. Materials used in assembling a deck. Direct labor cost of assembling and installing an engine. b. Which of these unit costs would be most useful to management in evaluating the overall monthly efficiency of the...
Deck Department Engine Department Direct materials 180,000 540,000 Direct labor 30,000 24,000 Manufacturing overhead 90,000 96,000...
Deck Department Engine Department Direct materials 180,000 540,000 Direct labor 30,000 24,000 Manufacturing overhead 90,000 96,000 a. Instructions Compute the following per-unit costs for the month of May. A deck assembly transferred to the Engine Department. Assembling an engine and installing it. A completed lawnmower. Materials used in assembling a deck. Direct labor cost of assembling and installing an engine. b. Which of these unit costs would be most useful to management in evaluating the overall monthly efficiency of the...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT