Explain how can project quality will be managed?. How can we use
quality planning, quality assurance, quality control, and
continuous improvement? What system will be used to ensure quality
and continuous improvement throughout the project? Discuss how you
will manage project risk for your project. What exactly can be done
to reduce risk? How can risk be controlled? Explain why do some of
the projects fail? Specific things that can be done to reduce
project failure rates?
evelop a plan for performing quality assurance and quality
control on this project. Identify the project deliverables.
Determine the quality criteria for each project deliverable.
Identify the quality control tasks needed to control quality.
Determine quality assurance activities required to assure quality.
Prepare an action plan: Assign the person responsible for each
quality control and assurance activity, and time frame to complete
the activity.
Please Read and Summarize above Article "HOW TO IMPROVE
SOFTWARE QUALITY ASSURANCE IN DEVELOPING COUNTRIES" in APA style
format (3-4 pages). Students should also integrate answers to the
following three questions in their papers:
§ What is the author trying to
say?
§ What is the significance of what you
read?
§ How does the material influence
you?
Advanced Computing: An International Journal ( ACIJ ), Vol.3,
No.2, March 2012 DOI : 10.5121/acij.2012.3203 17 HOW TO IMPROVE
SOFTWARE QUALITY ASSURANCE...
Density requirements of soils are critical to the QC/QA (quality
control and quality assurance) of compacted borrows in the
construction of earth structures, like earth dams and highway
embankments.
a) How the density requirements can be established?
b) Give different methods for the field density check and
explain how each works.
There are five different types of control methods that managers
can utilize to maintain control. These are bureaucratic,
concertive, objective, normative and self-control
(self-management).
Please compare and contrast the different types of
control methods.
Please describe which method you think is the most
effective and which one is the least effective.
Which method would you prefer to use as a manager? Does
this differ from which method you would like to work under as an
employee?
select one quality. as a group leader,discuss how you would
incorporate the selected quality into the running of a group .
examine the aspects of coleaders work together to positively
influences group productivity for members and the co-leaders?
discuss how your theoretical orientation influence the kind of
interventions you will make in a group.