A hydro power station is required to deliver 48MW of power to the national grid from...

A hydro power station is required to deliver 48MW of power to the national grid from a site where the available head is 16m The alternator efficiency may be taken as 96%.The proposed rotational speed of the coupled turbo-alternators is 150r/min and the specific speed of the available turbines is 400. Estimate the number 9f units required

Solutions

Expert Solution


Related Solutions

Waterloo North Hydro has two options for upgrading a geothermal power station to meet new government...
Waterloo North Hydro has two options for upgrading a geothermal power station to meet new government standards. Assume all interest is 4.19% compounded annually. Option 1 Waterloo North Hydro will make the upgrades themselves. This is expected to cost $46,700 per year from year 1 until the end in 21 years. At the end of the operation (in 21 years) Waterloo North Hydro expects to sell all equipment needed for the upgrade for $96,000. Option 2 Pay experienced contractors. This...
How many 1 gigawatt hydro or wind power ‘plants’ would be required to generate all of...
How many 1 gigawatt hydro or wind power ‘plants’ would be required to generate all of the electricity require in the US?
A closed loop overhead conveyor must be designed to deliver parts from a load station to...
A closed loop overhead conveyor must be designed to deliver parts from a load station to an unload station. The specified flow rate of parts between the two stations is 320 parts/hr. The conveyor has carriers spaced at a center-to-center distance that is to be determined. Each carrier holds one part. Forward and return loops are each 75 m. Conveyor speed is 0.6 m/s. Minimum feasible times to load and unload parts at the respective stations is 0.16 min for...
Describe the effects of climate change on hydro-electric power generation?
Describe the effects of climate change on hydro-electric power generation?
The threat on the Texas power grid has escalated. An imminent attack is expected coming from...
The threat on the Texas power grid has escalated. An imminent attack is expected coming from multiple fronts. This includes expected coordinated attacks including DDOS, malware, and physical attacks on substation equipment. To secure the grid against such an attack, formulate an effective defense scenario and strategies to counter the cyber attack.   This includes deceiving, confining, and neutralizing the attackers before it actually occurs, keeping the grid up.
Define cost analysis on a off grid PV system (mini grid). Use necessary equations required on...
Define cost analysis on a off grid PV system (mini grid). Use necessary equations required on the summary. Write up of 10pages.
The Province of Quebec is facing power shortfalls. Quebec Hydro plans to address this problem by...
The Province of Quebec is facing power shortfalls. Quebec Hydro plans to address this problem by investing in developing coal fired energy and hydropower facilities in the coming seven years, and have $1.5 billion with which to do so.   Every $ million spent on coal fired plants will result in 15 megawatts of power capacity when the plant construction is completed, and every $ million spent on hydropower dams will result in 20 megawatts of power capacity when the dam...
write a review report on the topic impact of climate change on hydro power generation?
write a review report on the topic impact of climate change on hydro power generation?
The Oman National Grid Company ventures to a new project in the southern part of the...
The Oman National Grid Company ventures to a new project in the southern part of the Sultanate which is a 250-kilometer, 132 kilovolts transmission lines. The company has to choose between an Overhead transmission system and Underground transmission system. Table Q2 shows the initial investment for each type, the expected revenues during its lifetime which includes the cost savings incurred by underground transmission system over the overhead transmission system. The company has estimated a salvage value for each type of...
The Oman National Grid Company ventures to a new project in the southern part of the...
The Oman National Grid Company ventures to a new project in the southern part of the Sultanate which is a 250-kilometer, 132 kilovolts transmission lines. The company has to choose between an Overhead transmission system and Underground transmission system. Table Q2 shows the initial investment for each type, the expected revenues during its lifetime which includes the cost savings incurred by underground transmission system over the overhead transmission system. The company has estimated a salvage value for each type of...