Question

In: Finance

Waterloo North Hydro has two options for upgrading a geothermal power station to meet new government...

Waterloo North Hydro has two options for upgrading a geothermal power station to meet new government standards. Assume all interest is 4.19% compounded annually. Option 1 Waterloo North Hydro will make the upgrades themselves. This is expected to cost $46,700 per year from year 1 until the end in 21 years. At the end of the operation (in 21 years) Waterloo North Hydro expects to sell all equipment needed for the upgrade for $96,000. Option 2 Pay experienced contractors. This will cost $33,300 up front and $56,600 annually for 13 years.

1) Find the net present value of Option 1: $

2) Find the net present value of Option 2: $

3) Which option should Waterloo North Hydro choose?

Solutions

Expert Solution

Please upvote if the ans is helpful. In case of doubt,do comment. Thanks.


Related Solutions

A hydro power station is required to deliver 48MW of power to the national grid from...
A hydro power station is required to deliver 48MW of power to the national grid from a site where the available head is 16m The alternator efficiency may be taken as 96%.The proposed rotational speed of the coupled turbo-alternators is 150r/min and the specific speed of the available turbines is 400. Estimate the number 9f units required
Design a power generation system by choosing one of the options given below. 1. Geothermal sourced...
Design a power generation system by choosing one of the options given below. 1. Geothermal sourced power plant  Define the geothermal power plant type (Total Flow/Flash/binary)  Define turbine isentropic efficiency  Show all the processes on a T-s diagram  Calculate how much power can be generated 2. Wind Power system  Assume Rayleigh wind regime  Define wind turbine power capacity  Define rated power of the turbine  Define cut-in, cut out and rated wind speed...
Which source of energy has active and passive applications? geothermal energy, wind, biomass burning, hydro, fossil...
Which source of energy has active and passive applications? geothermal energy, wind, biomass burning, hydro, fossil fuels
The county fire department is considering two options (A and B) for upgrading its aging physical...
The county fire department is considering two options (A and B) for upgrading its aging physical facility. Assume an interest rate of 6% per year and 50-year time period. Option A: Involves remodeling the existing fire station by spending $2,252,000 now. In addition, the cost for personnel and equipment will be $126,000 per year. Option B: Calls for buying 5 acres of land for building a new fire station. The cost of the land in that area is estimated to...
Two options are considered to power a new factory located in a rural area, a small-scale...
Two options are considered to power a new factory located in a rural area, a small-scale solar farm, or a new power-line. Solar cells will cost $16,600 to install. Annual costs for inspection are expected to be $2,400. A new power line will cost $31,000 to install, with power costs expected to be $1,000 per year. Assume mutually exclusive projects, and both projects have a useful life of 5 years with no salvage value. At an interest rate of 10%...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two 1000 MWe PWRs and are planning the fuel cycle for the next ten years. You are beginning negotiations with your fuel supplier, Verma Fuels, and must choose between the 3.3% enrichment fuel you have been using and a new 5% enrichment fuel.   Briefly discuss two financial considerations in making this decision.
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two...
You are Plant Manager at the Hokomokee Nuclear Power Station in Moustafa County, which has two 1000 MWe PWRs and are planning the fuel cycle for the next ten years. You are beginning negotiations with your fuel supplier, Verma Fuels, and must choose between the 3.3% enrichment fuel you have been using and a new 5% enrichment fuel.   -Compare the environmental consequences of use of the two different fuels – i.e., consider which might generate more or less waste.
Two tangents of a proposed road meet at station 12+25.00 at a deflection angle of 29°33'00"....
Two tangents of a proposed road meet at station 12+25.00 at a deflection angle of 29°33'00". A 630.00 ft radius circular curve will be used to connect these two tangents. b) Layout this curve by the deflection angles and chords method. Use full stations of 100 ft. Tabulate the results and do the usual check.
Taichung thermal power station wants to change their steam generator with a new steam generator that...
Taichung thermal power station wants to change their steam generator with a new steam generator that has a better efficiency. The existing steam generator operating with Rankine cycle with reheat and has a thermal efficiency of 30%. Taichung thermal power station has been offered by Patron Company that supplies new steam generators that are more environmentally friendly. The specifications of the new steam generator are as follow: maximum pressure is 15MPa, minimum pressure is 10kPa Temperature entering the turbine is...
Taichung thermal power station wants to change their steam generator with a new steam generator that...
Taichung thermal power station wants to change their steam generator with a new steam generator that has a better efficiency. The existing steam generator operating with Rankine cycle with reheat and has a thermal efficiency of 30%. Taichung thermal power station has been offered by Patron Company that supplies new steam generators that are more environmentally friendly. The specifications of the new steam generator are as follow: maximum pressure is 15MPa, minimum pressure is 10kPa Temperature entering the turbine is...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT