In: Civil Engineering
Which of the following statements is false regarding the Bluebeam software package?
It can be used to manage a digital document set. |
||
It can be used to create hyperlinks between documents to simplify navigation. |
||
It can be used to perform on-screen takeoffs of materials. |
||
It can be used to create project schedules. |
In the Activity Block, the number of working days needed to perform a specific activity is called:
Interval |
||
Length |
||
Duration |
||
Extent |
Which of the following best describes when the successor activity cannot start until the predecessor activity finishes (for example: Activity B starts after the end of Activity A)?
Start-to-start |
||
Finish-to-start |
||
Finish-to-finish |
||
None of the above |
In scheduling software, the least commonly used relationship is:
Finish -to-start |
||
Start-to-start |
||
Finish-to-finish |
||
Start-to-finish |
||
The duration assigned to a predecessor activity to delay its successor is called:
Lag |
||
Lead |
||
Successor |
||
First activity |
||
When adding or deleting doors and windows in Revit, the door and window schedule will automatically update.
True
False
In: Civil Engineering
Do a write up in a clear and understandable manner on Causes, Prevention And Repair of Cracks in building. Focus on concrete structure – slab, beam and columns.
In: Civil Engineering
If you have to construct an embankment structure and you wish to determine the volume of fill between two stations located 1 station apart describe in your own words how would you determine such volume in cubic yards? Discuss and show any formulas you may know.
In: Civil Engineering
Conduct a research of 3 pages on Road Safety and Media reporting in Lebanon by concentrating on the following aspects: its magnitude, its economic costs, its importance, its success story (if any solution is implemented) and the main outputs of such a project.
In: Civil Engineering
What is the purpose of the mass haul diagram? How is it used in the computation of earthworks for roadway alignments?
In: Civil Engineering
What is the truss analogy in dimensioning of RC beams in bending? Sketch the imaginary truss indicate compressed and tensioned elements of the truss.
In: Civil Engineering
Compute and tabulate full-station elevations for an unequal-tangent vertical curve to fit the requirements of grade g1 = +1.25%, g2 = +3.75%, VPI at station 62+00 and elevation 1053.95 ft, L1 = 500 ft and L2 = 600 ft.
In: Civil Engineering
After drilling generally casing is done. Assume in one well the casing failure has taken place due which the operator has faced a problem in the well. Based on understanding how the selection of different types of casing is done (4marks). Support your answer with a neat diagram (1mark).
In: Civil Engineering
In: Civil Engineering
The functionality of solid oxide fuel cells depends on:
Group of answer choices
Vacancy defects
Piezoelectricity
Impurity defect
Interstitial defects
The most significant parameter in determining the crystal structure of ceramic materials is:
Group of answer choices
Charge Neutrality
Size of ions
Bond Hybridization
Stoichiometry balance
Three-point bending test is used for ceramic materials to determine:
Group of answer choices
Flexure toughness
Elastic modulus
Fracture toughness
All of the above
The most significant parameter in determining the crystal structure of ceramic materials is:
Group of answer choices
Charge Neutrality
Size of ions
Bond Hybridization
Stoichiometry balance
Three-point bending test is used for ceramic materials to determine:
Group of answer choices
Flexure toughness
Elastic modulus
Fracture toughness
All of the above
Kaolinite is a type of:
Group of answer choices
Refractory ceramic
Cement ceramic
Natural Clay
Abrasive ceramic
In: Civil Engineering
A new bridge is to be constructed over the East River in New York City. Two structural possibilities exist: the support could be in the shape of a parabola or the support could be in the shape of a semi-ellipse.
The space between the supports needs to be 1050 feet.
The height at the center of the arch needs to be 350 feet. Determine the equation of a parabola with these characteristics. (Hint: Place the vertex of the parabola at the origin to simplify calculations).
Part 1
a. What is your equation for the parabola? An empty tanker, 520 feet wide and 260 feet high needs to pass beneath the bridge.
b. Can the tanker pass under this bridge? Justify your answer. Determine the equation of a semi-ellipse with the same characteristics. (Hint: Place the center of the semi-ellipse at the origin to simplify calculations)
Part 2
a. What is the equation for the semi-ellipse? Show the work required to determine the equation.
b. Will the tanker (520 feet wide and 260 feet high) be able to pass under this bridge? Justify your answer.
Part 3
a. If the river were to flood and rise 10 feet, how would the channel widths and the clearances of the two bridges be affected? Explain, using numbers, how the width of the channel would be affected for each bridge.
b. With all things considered, which bridge design would you choose? Explain your reasoning.
In: Civil Engineering
A photograph was taken from an altitude of 1700.0 m. above datum. If the average elevation of the project area is 250.0 m above datum, and the focal length of the camera is 208.90 mm.,
In: Civil Engineering
A surveying team has to conduct a surveying assignment on a hot summer day. The area where the survey is supposed to be conducted is in the vicinity of a busy metropolitan area with lots of traffic. Assume the surveying firm has the following tools: gunter’s chain, steel tape, EDM, Electronic theodolite and a total station. Which one of the instruments would be most suitable and what advantages does it have over other tools? Explain in terms of time, error in collection of measurements, accuracy, data collection and ease in the collection of data.
In: Civil Engineering
The state government maps have to be updated every 5 years or 10 years. This year (2020), a surveying agency was given the task of updating the Texas state map. What surveying technique would you choose and why? The surveyors have many tools to complete the survey and generate the new maps. What surveying tools might be optimal and accurate. Note: You can choose any tool or survey technique to justify your answer but an ideal option is to think beyond land surveying
In: Civil Engineering