What happens with the degradation of substrates in activated sludge if you add a clarifier. The activated sludge retention time is 0.5 days and the sludge age is 2 days. Also, what if the sludge age is 4 days
In: Civil Engineering
1.857 (RL = 37.567 m), (0.983, 0.354), 0.571, 1.011, 2.151, (1.124, x), 0.890, (0.543, 3.178), 3.808.
Book the levels, including the value of x calculated in part (a) using the HPC method and show all arithmetic checks. (1 mark
In: Civil Engineering
what is the difference between millwork and casework
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
CET 345W Materials Testing Laboratory
1. To Research for NDT cases online. To find one case where
magnetic particle testing was used and one where liquid penetrant
was used.
2. To discuss why we think each method is more appropriate for each
case
In: Civil Engineering
Lump sum contracts: A. Are negotiated between the owner and contractor on competitively bid projects. B. Are where the contractor is reimbursed for actual costs of labor and materials. C. Are typically used on engineering projects. D. Are the simplest method of stating the cost of an entire contract.
In: Civil Engineering
1. If I want a woven fabric to be manufactured within the minimum or maximum thicknesses respectively, how should you arrange the diameters of warp and weft yarns?
How should you arrange the warp wave and weft wave?
What is the corresponding weave phase for the thicknesses?
Please give me answer in details and every Description
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
list three ways in which older washing machines used different materials in their construction that their more modern counterparts
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering
In: Civil Engineering