What happens with the degradation of substrates in activated sludge if you add a clarifier. The...

What happens with the degradation of substrates in activated sludge if you add a clarifier. The activated sludge retention time is 0.5 days and the sludge age is 2 days. Also, what if the sludge age is 4 days

In: Civil Engineering

A surveyor completes a levelling circuit from a known BM at point A (RL = 37.730...

  1. A surveyor completes a levelling circuit from a known BM at point A (RL = 37.730 m). At the end of the survey, the surveyor finds out that the rod person moved the graduated staff before a BS value was taken at the third change point. The levels obtained are as follows:  

1.857 (RL = 37.567 m), (0.983, 0.354), 0.571, 1.011, 2.151, (1.124, x), 0.890, (0.543, 3.178), 3.808.  

  1. Assuming that the misclosure for the level circuit is 0.000 m, find the probable value of the missing BS value x.   
  2. Is the value of x in part (a) acceptable? Explain. (1 mark)

Book the levels, including the value of x calculated in part (a) using the HPC method and show all arithmetic checks. (1 mark

In: Civil Engineering

what is the difference between millwork and casework

what is the difference between millwork and casework

In: Civil Engineering

Report Title: The Applied Surveying Techniques/Methods in Highway Engineering i want the report report about Applied...

Report Title: The Applied Surveying Techniques/Methods in Highway Engineering

i want the report

report about Applied Surveying Techniques/Methods in Highway Engineering
Length: Between 500 and 1500 words

In: Civil Engineering

Design a simply supported slab over a watch man office of 3.2m x 8m inner span...

Design a simply supported slab over a watch man office of 3.2m x 8m inner span factored live load of 10 KN/m^2. Use M25 grade concrete and Fe460 grade steel. Compare your results with void slab and write a summaryvfor it.

In: Civil Engineering

Design an activated sludge treatment unit with the following data for a town of population of...

Design an activated sludge treatment unit with the following data for a town of population of 80,000:​
B.O.D. of raw sewage = 200 mg/l.
Per capita Average sewage flow is 180 liters.
B.O.D. removal in primary treatment = 60%,
Raw sludge retained in ASP = 25%
Effluent water should have NO BOD at all to satisfy National Standards.

In: Civil Engineering

CET 345W Materials Testing Laboratory 1. To Research for NDT cases online. To find one case...

CET 345W Materials Testing Laboratory

1. To Research for NDT cases online. To find one case where magnetic particle testing was used and one where liquid penetrant was used.
2. To discuss why we think each method is more appropriate for each case

In: Civil Engineering

Lump sum contracts: A. Are negotiated between the owner and contractor on competitively bid projects. B....

Lump sum contracts: A. Are negotiated between the owner and contractor on competitively bid projects. B. Are where the contractor is reimbursed for actual costs of labor and materials. C. Are typically used on engineering projects. D. Are the simplest method of stating the cost of an entire contract.

In: Civil Engineering

1.   If I want a woven fabric to be manufactured within the minimum or maximum thicknesses...

1.   If I want a woven fabric to be manufactured within the minimum or maximum thicknesses respectively, how should you arrange the diameters of warp and weft yarns?

How should you arrange the warp wave and weft wave?

What is the corresponding weave phase for the thicknesses?

Please give me answer in details and every Description

In: Civil Engineering

Explain functioning and importance of ACTIVATED SLUDGE PROCESS in Sewage Treatment. What factors adversely affect overall...

Explain functioning and importance of ACTIVATED SLUDGE PROCESS in Sewage Treatment. What factors adversely affect overall performance of Treatment?

In: Civil Engineering

Determine the velocity of the flow in a sewer running full. The sewer is laid at...

Determine the velocity of the flow in a sewer running full. The sewer is laid at 1 in 500. The diameter of sewer is 200 cm. Also determine the discharge flowing through the sewer. What will be the effect if slope is doubled? Assume N = 0.014 in Manning’s formula.

In: Civil Engineering

list three ways in which older washing machines used different materials in their construction that their...

list three ways in which older washing machines used different materials in their construction that their more modern counterparts

In: Civil Engineering

Q3. Flow velocity of wastewater approaching a Grit chamber is 10cm/s. Design the grit chamber with...

Q3. Flow velocity of wastewater approaching a Grit chamber is 10cm/s. Design the grit chamber with appropriate Free board and a proportionate flow weir at its outlet to handle a sewage flow from a Population of 44,000 with a per capita water consumption of 250 liters/day. It has to handle maximum flow 2 times the average flow. Depth = 1.5m
Length of grit chamber is limited to 8m and it cannot hold water more than 1.5 minutes.

In: Civil Engineering

Q2. What main objectives you would consider as a Plant Manager in Selection of Advanced Sewage...

Q2. What main objectives you would consider as a Plant Manager in Selection of Advanced Sewage Treatment Technologies for Influent received at your Plant?

In: Civil Engineering

5. Discuss some of the most common methods of Water Disinfection with their merits, and demerits.

5. Discuss some of the most common methods of Water Disinfection with their merits, and demerits.

In: Civil Engineering