Question

In: Civil Engineering

Construction Documents 1. What is included in a Bid Package for a construction project? 2. Name...

Construction Documents

1. What is included in a Bid Package for a construction project?

2. Name and explain the three different stages of construction projects development.

3. Name and explain the three different stages of Architectural Design process for construction projects.

4. Name ten (10) different drawings in a set of drawing for a construction project.

5. What is Title Block and what type of information you can find in a Title Block?  


Solutions

Expert Solution

Answer 1. A Bid Package should include the following-

A)Estimates

B)specifications

C)Drawings

D)Statement of work

E)Schedule

Answer 2. Three stages  of the construction projects are as follows-

a) Design Stage-In this stage the planning and design of the project and indentifying the location of the project and the estimating the how much material and the listing of the material is done and then approval of the design and preparing and reciveing all kinds of permit required.

b) Constrcution Stage-In this first step is the excavation of the land and then progress from preparing the site to the completion of the building and each step is inspected by the project manager.

c) Post Construction Stage-This is the occupancy stage and includes installation of the electrical fittings, furnishing,etc.Then the project is handed over to the the customer.

Answer 3.Three Stages of Architectural Design PRocess of Construction project are-

A)The Conceptualization Stage-This is the intial design process in which the basic requirement and prefrences from the customer is taken and after which is start the design process.It is the most important stage as this sets the base for the entire project.

B)Design Development Stage- In this stage the client give the approval of the intial design and after this we design the in more details.Finalzing the design and other ascepts like planning,material, specification ,placments of things and structural detailing.

C)Construction Documents-This is the final design stage in which we have to produce the detailed dimension drawings including the heating and vetilation systems,plumbing,electrical,etc  which useful for the contractors to read the design and help in reducing the confusion in the site.

Asnwer 4 Ten types of drawings are-

1.Plan

2.Elevation

3.Excavation Drawing

4.Section Drawing

5.Cloumn Layout drwaing

6.Roof Beam Drwaing

7.Component Drwaing

8Foundation plan

9.Electrical Drawing

10.HVAC drawing

Answer 5.

Title Block is a template or a block which is usually located on the bottom or bottom right hand corner of the sheet.The title block includes the drawing title,drwaing nunmer,location,signature and approval dates,scales and other information like name of the firm,address and logo.


Related Solutions

The construction department is planning to bid on a large project for the development of a...
The construction department is planning to bid on a large project for the development of a new airport in Chicago area. The following table shows major activities, times, and sequence required: Activity Immediate Predecessor Activity Duration, Months Optimistic Most Likely Pessimistic A - 2 3 4 B A 1 2 3 C A 4 5 12 D A 3 4 11 E B 1 3 5 F C 1 2 3 G D 1 8 9 H E, F 2...
Construction Documents Review 11. Explain Addendum, Addenda, and Change Order in construction projects. 12. Name and...
Construction Documents Review 11. Explain Addendum, Addenda, and Change Order in construction projects. 12. Name and explain three items (required at minimum) in a Change Order. 13. What is the Door Schedule, Window Schedule & Room Finishes?
3. Smith’s bid of $542,000 was the lowest on a construction project that was advertised. The...
3. Smith’s bid of $542,000 was the lowest on a construction project that was advertised. The cost of the largest construction contract which Smith had previously performed was $78,000. What should the owner do to determine whether or not to let the contract to Smith?
Alden Construction is bidding against Forbes Construction for a project. Alden believes that Forbes’s bid is...
Alden Construction is bidding against Forbes Construction for a project. Alden believes that Forbes’s bid is a random variable B with the following mass function: P(B $6,000) .40, P(B $8,000) .30, P(B $11,000) .30. It will cost Alden $6,000 to complete the project. Use each of the decision criteria of this section to determine Alden’s bid. Assume that in case of a tie, Alden wins the bidding. (Hint: Let p Alden’s bid. For p 6,000, 6,000 p 8,000, 8,000 p...
The Rogers Construction Company is trying to decide whether to make a bid on a project...
The Rogers Construction Company is trying to decide whether to make a bid on a project against 4 competitors. The lowest bid will win the contract and be paid the amount they bid. It believes it will cost the company £10,000 to complete the project (if it wins the contract) and £350 to prepare the bid. Based on historical data, Rogers believes each competitor’s bid has a normal distribution with mean £15,000 and standard deviation £1,500. a) Set up a...
A building contractor is preparing a bid on a new construction project. Two other contractors will...
A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $500,000 and $700,000 B Normal probability distribution with a mean bid of $600,000 and a standard deviation of $40,000 If required, round your answers to three decimal places. If...
Johnson Company is preparing a bid on a new construction project. Two other contractors will be...
Johnson Company is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from other contractors can be described by the following probability distributions: Contractor A: Uniform probability distribution between $500,000 and $1,000,000. Contractor B: Normal probability distribution with a mean bid of $700,000 and a standard deviation of $100,000. a. If Johnson Company submits a bid of $750,000, what is the probability Butler will...
1. Name three things that must be included in the documentation of patient education. 2. Discuss...
1. Name three things that must be included in the documentation of patient education. 2. Discuss the purposes of patient education. 3. Discuss the purposes of patient education.
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two...
Problem 12-18 (Algorithmic) A building contractor is preparing a bid on a new construction project. Two other contractors will be submitting bids for the same project. Based on past bidding practices, bids from the other contractors can be described by the following probability distributions: Contractor Probability Distribution of Bid A Uniform probability distribution between $530,000 and $730,000 B Normal probability distribution with a mean bid of $630,000 and a standard deviation of $43,000 If required, round your answers to three...
1 ) If the original bid for the city hall project was $5,000,000, what entry would...
1 ) If the original bid for the city hall project was $5,000,000, what entry would be made when the bid was awarded to the contractor. Your answer should be in this form: DR XXX(account name), CR XXX (account name) no amount is needed. Use the following information to answer the next 3 questions regarding property taxes. T-Accounts might help answer some of these questions. The following transactions and events related to Colfax County's tax revenues for the year beginning...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT