What is convection cooling? How can you construct a building so that convection cooling occurs?
What are thermal bridges? Give an example of some ways to eliminate them when you are building?
What is the intention of the Innovation and Design Credits? What are the responsibilities of the LEED Accredited Professional on a project?
In: Civil Engineering
Draw the interaction diagram (P-M diagram) of the column (16”x16” with 4#8 bars plus #3 tie @12”o.c). Assume fc’ is 5 ksi and fy is 60 ksi. (10 points)
In: Civil Engineering
I have GIS class. I want to do project, and I need to use ARCmap to search population of homeless at Denver Colorado. Can you help me to explain how to find the Population of homeless? Please
In: Civil Engineering
what's project organization structure and why is it important
In: Civil Engineering
A rectangular beam has a width of 300 mm and an effective depth of 510 mm. It carries Vu = 200 KN and Mu = 55 KN-m and is reinforced with 2650 mm2. Use f’c = 21 MPa and fy = 345 MPa. Normal concrete. Express your answer in two decimal places.
a. Compute the shear strength in KN provided by concrete using the less conservative formula as shown. Express your answer in two decimal places.
b. Calculate the required area of compression reinforcement in mm2 due to the factored moment, Mu.
c. Compute the shear force in KN to be carried by the transverse reinforcements.
d. What is the e spacing of stirrups in mm?
In: Civil Engineering
1. Managing material cost, worker productivity, and subcontractor requests for extra compensation are all project risks. Discuss how the tools or activities listed below can help manage these risks.
a. Weekly job cost analysis
b. Pre-award subcontractor proposal analysis for completeness and feasibility
c. Hard bids on material unit costs
d. Contracts for material purchase
e. Firm contract procedures for claims for additional costs f. Assigning risk to those best able to manage it
In: Civil Engineering
. Discuss the use and types of estimate you can use for:
a. project planning
b. establishing contract costs
c. managing the costs in the field
d. change order pricing.
In: Civil Engineering
The concept of slab panels are designed as in a single unit, however each consisting of one or more slab items (slab panels). When it comes to design you then need to conceptualize the slab as a series of design panels. Each design panel will have its own results. Different reinforcement can be selected in different panels. More often than not, pattern loading (some panels loaded and others not). In reference to the afore mentioned; produce and explain five types panel used for slab construction. Annotated sketches can be made to support the answers.
In: Civil Engineering
1. A contractor is planning to use a crawler tractor with power shift transmission to push 1,500 LCY. The tractor must haul the loose material up a 12% slope where it will be stockpiled for later removal. The contractor has measured the tractor blade load measurement: the pile length 12.6 ft, the pile width 8.1 ft, and the pile height 4 ft. The tractor weighs 44,400 pounds, and the coefficient of traction is estimated to be 0.7. The average haul distance is estimated to be 300 ft. The job efficiency is 50 minutes per hour. Performance characteristics of the tractor are shown in the lecture slides. (Note: 1 mi/hr = 88 ft/min).
1) What is the estimated productivity of the tractor? (First gear for dozing; Third gear for return.)
2) Estimate the total hours to complete the work.
3) Determine if the tractor can perform the work in the given condition above.
In: Civil Engineering
4. What are the three most frequently and widely assigned rock mechanics property measurement tests? Explain them. How are they each used in rock mechanics property measurement test?
In: Civil Engineering
Prepare an earned value schedule for a public construction project improving the drainage system of a neighborhood street.
In: Civil Engineering
Related to subject of ( Reinforcement Concrete )
Answer the following in very short answers:-
Please use typing
only.
1- What is the difference between a Type A and Type B
splice?
2- Why is it conservative to assume that the moment capacity and
area of steel vary linearly instead of using the quadratic
relationship?
3- Why is this helpful to speed up the moment design?
In: Civil Engineering
Conduct a web search for a news article of a large-scale soils/foundation issue, problem, or failure problem. Prepare a 3-page document on analysis and interpretation of any soils/foundation related current news article following the format below. 1. Summarize Article in ½ page 2. What Aspect or Topic in EGR 354 is it related to? Be specific. List all that Apply 3. Define Problem Statement and its Causes. Use Technical Language based on lessons from EGR 354. 4. What proposed solutions would you have suggested differently? 5. Determine any social and environmental effects of your solutions. Have to include the references.
In: Civil Engineering
What is the difference between a prescriptive specification and a performance standard
for the production of wood structural panels?
In: Civil Engineering
Briefly describe the span rating found in the grade-trademark of sheathing grades and APA Rated Strud-I-Floor
In: Civil Engineering