The term SICP stands for
Snow and Ice Control Plan
The importance of Snow and
Ice Control Plan to northern parts of United States :
- The plan approval authority is
Federal Aviation Administration ( FAA) and to make
sure than the plans made are in line with the safety standards
- If we talk about North America it
is chilled most the months in an year moreover the snow fall or ice
falls take place on regular places . This makes it unfit for flight
as landing and taking off is not possible. To avoid this situation
there is a need of proper design using proper safety
standards.
- For this purpose there was
formation of SICP and these area where there is regular snow falls
or north America or Mountains area have to follow the procedure of
SICP within a period of eight weeks before FAA
issues the orders.
- The importance of SICP was felt as
the climate is uncertain . The north America and
mountains have similar snow belt climate zone. The mountain areas
have more of ice fall or snow fall whereas the rest of the America
noticed freezing rain events. Therefore the department has to make
backup in advance for the climate change for which SICP forecast
and regulates.
- The program has been formed to
provide the best level of service with the available
resources in the present environment.The monitor of level
of service ( LOS) is from the winter weather event up to its end
.
- The anti icing
strategy is formed . The nature of snow falls in measured
,usually it is slow at first place and thereby increasing. As the
time of cycle increases it becomes difficult to adopt the anti
icing statregy.The cycle included accumulation of snow on the roads
and the runways of north America
- For this there is creation
of pavements and ice interference . These are designed on
the basis of level of service need the risk is set on the parameter
of high medium and low conditions.The anti - icing prevents the
formation of snow on runways and roads
- Other strategies include
Deicing that is breaking the snow using chemicals
and Mechanical i.e. using plows to remove ice from
the area.
The procedures and time frames : the
Procedure is divided into two parts pre and post season
activities
PRE SEASON
ACTIVITIES
- Airport management meetings ( one
month prior to season) : These meetings are formed to monitor the
maintenance and service if need. The budget and staffing of SICP is
planned at this stage.
- Training to remove snow : Prior to
season the training has been given to airport personnel to remove
snow using different different strategies.
- Thereafter there is equipment test
( 1-2 months prior to season) : The each and every equipment to
remove snow is tested by the SICP department.
- SICP Meetings ( 15 days -30 days
prior to season): The committee is formed to welcome the feedback
by the members on various issues and to discuss the issues like
- Priority area where more level of
service is needed.
- staffing and recruitment
- training program to educate the
airport personnel
- Equipment inventory
- Mitigation of storm and freezing
rains
- review and feedback on the
plan
- maximizing the level of service
during extreme icing conditions.
DURING THE
SEASON
- Whether Forecasting ( initial days
of season)
- Commands and chain to be followed
by each personnel
- Snow removal Strategies demo
- Implementation of these
strategies
POST SEASON
ACTIVITIES
- Airport Management meeting : After
the season this meeting is help to discuss the issues arise at the
time of the meeting and the reason of delay. The feedback form is
served to members for the query and their duty
- The SICP meeting will be held after
30 days of ending of season to discuss te changes to be taken in
next pre events
Points to be
remembered:
- The removal of snow is done on the
priority basis and the priority is designed by color coded map
- maintaining the clearing times on
the runways
- Formation of tools required in
removing snow
- making the runway dry throughout
the season