Question

In: Civil Engineering

Class: (Sanitary Engineering) The sewer design criteria and design methods and sewer lining?

Class: (Sanitary Engineering)

The sewer design criteria and design methods and sewer lining?

Solutions

Expert Solution

Sewers are used for carrying if drainage water and waste matters through underground pipelines. There are various criterias that are to be considered while designing a sewer. Those criterias are listed below :

  • Size of sewers
  • Bedding options
  • Depth of the flow
  • Velocity of the flow
  • Ground water Infiltration
  • Pipeline material and leakage amount.

All the above criterias should be considered while designing a sewer. A proper methodology is being followed While designing a sewer and no step should be missed if proper sewer system is to be constructed.

Different zones are being formed for different cities and towns and by the same categories zones are also formed in sewers and it is the basic step in design. Then the arrangement of sewer network is to be done such that from where the sewer is going to come and where to be disposed and further the calculation is being done for the amount of waste that needs to be transferred. The flow velocity is being obtained by empirical formulas and at last the section area of sewer is found out and hence the method of design will be completed and sewer will be constricted by the given design and calculations.

Sewer Lining : Sewer lining is being used to repair cracked pipes without completely replacing the pipelines. Total excavation of sewer system can cause lot of collateral damage hence lining of sewer is preferred and it is more economic also. There are four types of sewer lining methods which are listed below :

  1. Cured - in place
  2. Pulled - in place
  3. Pipe Bursting
  4. Internal pipe coating

Related Solutions

Class: Hydraulic Engineering Hot and cold water Plumbing systems. The design criteria and methods?
Class: Hydraulic Engineering Hot and cold water Plumbing systems. The design criteria and methods?
Explain the process for establishing the line and grade for a sanitary sewer line connection to...
Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such as field notes and a simple plan...
Explain the process for establishing the line and grade for a sanitary sewer line connection to...
Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such as field notes and a simple plan...
Flow in Sewers What are the minimum and maximum flowrates for sanitary and storm sewer? What...
Flow in Sewers What are the minimum and maximum flowrates for sanitary and storm sewer? What is the reason (rationale) for applying such minimum and maximum for each sewer type? Present answer in Tabulation
A new development is being planned, which will connect to the city ’s sanitary sewer system....
A new development is being planned, which will connect to the city ’s sanitary sewer system. This development will have 80 acres of medium-density residential assume 10 DU / acre and 2.8 persons per DU). Assume a per capita sewage rate of 90 gal/d/person. Additionally, a new community hospital will be constructed with 300 beds (assume 300 gal/d/bed). Assume I/I contribution of 10%. a. Calculate the mean sewer discharge (accounting for residential, commercial, and I/I flows). b. Calculate the maximum...
What are the objectives of the storm sewer system design?
What are the objectives of the storm sewer system design?
Overview For this assignment, design and implement the methods for a class that can be used...
Overview For this assignment, design and implement the methods for a class that can be used to represent a quadratic equation. int main() has already been written for this assignment. It is available for download from Blackboard or by using the following link: http://faculty.cs.niu.edu/~byrnes/csci240/pgms/240pgm8.cpp All that needs to be done for this assignment is to add the class definition and method implementation to the above CPP file. The Quadratic class Data Members The class contains three data members: an integer...
Sanitary Engineering what is the required limitation for the residential water delivery standards in term of...
Sanitary Engineering what is the required limitation for the residential water delivery standards in term of pressure and flow?
package design; public class FortuneEmployee { /** * FortuneEmployee class has a main methods where you...
package design; public class FortuneEmployee { /** * FortuneEmployee class has a main methods where you will be able to create Object from * EmployeeInfo class to use fields and attributes.Demonstrate as many methods as possible * to use with proper business work flow.Think as a Software Architect, Product Designer and * as a Software Developer.(employee.info.system) package is given as an outline,you need to elaborate * more to design an application that will meet for fortune 500 Employee Information *...
Design a Geometry class with the following methods: * A static method that accepts the radius...
Design a Geometry class with the following methods: * A static method that accepts the radius of a circle and returns the area of the circle. Use the following formula: Area=?r^2 * A static method that accepts the length and width of a rectangle and returns the area of the rectangle. Use the folliwng formula: Area = Length x Width * A static method that accepts the length of a triangle's base and the triangle's hight. The method should return...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT