Question

In: Civil Engineering

Explain the process for establishing the line and grade for a sanitary sewer line connection to...

Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such as field notes and a simple plan and profile drawing in establishing the line and grade.

Solutions

Expert Solution

look through the attached images for the solution


Related Solutions

Explain the process for establishing the line and grade for a sanitary sewer line connection to...
Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such as field notes and a simple plan...
B05 - Construction Surveying - Assignment 8 Explain the process for establishing the line and grade...
B05 - Construction Surveying - Assignment 8 Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such...
Class: (Sanitary Engineering) The sewer design criteria and design methods and sewer lining?
Class: (Sanitary Engineering) The sewer design criteria and design methods and sewer lining?
Flow in Sewers What are the minimum and maximum flowrates for sanitary and storm sewer? What...
Flow in Sewers What are the minimum and maximum flowrates for sanitary and storm sewer? What is the reason (rationale) for applying such minimum and maximum for each sewer type? Present answer in Tabulation
A new development is being planned, which will connect to the city ’s sanitary sewer system....
A new development is being planned, which will connect to the city ’s sanitary sewer system. This development will have 80 acres of medium-density residential assume 10 DU / acre and 2.8 persons per DU). Assume a per capita sewage rate of 90 gal/d/person. Additionally, a new community hospital will be constructed with 300 beds (assume 300 gal/d/bed). Assume I/I contribution of 10%. a. Calculate the mean sewer discharge (accounting for residential, commercial, and I/I flows). b. Calculate the maximum...
Explain the terms Hydraulic Grade Line and Total Energy Line. Compare the total energy line and...
Explain the terms Hydraulic Grade Line and Total Energy Line. Compare the total energy line and hydraulic grade lines for the pipe sections if there is sudden enlargement in the pipe section or sudden contraction in the pipe with the help of sketches.
The line spectra are an unchanging characteristic of each of the elements. Explain the connection between...
The line spectra are an unchanging characteristic of each of the elements. Explain the connection between line spectra and the electronic nature of the atom. Your explanation must include the following: electron, energy level, light energy, photon, line spectra absorption, and emission.
Explain the process of establishing new accounts for fixed assets that will be depreciated like equipment....
Explain the process of establishing new accounts for fixed assets that will be depreciated like equipment. Why is accumulated depreciation set up with a negative beginning balance? What is the purpose of depreciation? What financial benefits does deprecation add to the organization?
A grade line AB having a slope of -4% intersect another grade line BC having a...
A grade line AB having a slope of -4% intersect another grade line BC having a slope of +2% at B. The elevations of points A, B and C are 93 m, 87 m and 92 m respectively. Determine the: a) elevation of the sag of the 200 m vertical parabolic curve to connect the grade lines; b) location of sag from where the curve starts; c) station of sag if PI is at station 10+20 (format: 00+00.00); d) vertical...
Outline the process for establishing pay rates.
Outline the process for establishing pay rates.