Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such as field notes and a simple plan and profile drawing in establishing the line and grade.

Solutions

Expert Solution

Following are the main points which are useful in establishing the line and grade of a sanitary sewer line

1. Depending upon the population of the area , soil properties , slope , material involved etc. the shape of sewer section is empolyed whether circular, oval , trapezoidal etc..

2. Laying down of sewer is done according to the natural or artificial gradient to avoid clogging. and it should be laid at suitable underground depth.

3.for the purpose of extension of new sewer line , it should be well designed that this new sewer line will not create nuisance to the exsisting sewer line in terms of load and waste.

4.after the designing of new sewer line , it should be approved and analysed by the goverment body before the execution of work.

5.Nextly . pipes are laid in straight line preferaly with the provision of manholes at suitable distance for regular checkup.

6.Depending upon the type of sewer flow:- a. Entrance flow - It is defined as the downstream control of pipe flow.

b. Pipe flow - Defined with upstream control flow.

c. Exit flow - concerned with type of flow such as critical, sub- critical etc.

7. Downstream invert- A minimum of 0.1 inch drop from invert to invert across manholes is required.Wherever there is change in diameters or gradient change , the downstream invert shall be lowered so that the crown of sewer should aligned.

8.Use of batter boards and offset stakes - Batter boards are wooden planks / formworks used for temprorary work of suspending the layout work of foundation for maintaining the accuracy as per the design. After the construction is done they are removed .

9. Ground cover requirement :- Generally the sewer lines are laid undergroung at suitable distance to avoid from breakage, freezing, day to day load etc.So a minimum cover of 3 inch or as per the manufacturer design which one is greater should be adopted.


Related Solutions

Explain the process for establishing the line and grade for a sanitary sewer line connection to...
Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such as field notes and a simple plan...
B05 - Construction Surveying - Assignment 8 Explain the process for establishing the line and grade...
B05 - Construction Surveying - Assignment 8 Explain the process for establishing the line and grade for a sanitary sewer line connection to an existing municipal sanitary manhole. Include the type of sewer flow, the importance of the pipe invert and reach of the sewer in determining the slope of the pipe, factors that determine the use of manholes, the use of batter boards and offset stakes, minimum ground cover required. In addition, discuss the use of visual aid such...
Class: (Sanitary Engineering) The sewer design criteria and design methods and sewer lining?
Class: (Sanitary Engineering) The sewer design criteria and design methods and sewer lining?
Flow in Sewers What are the minimum and maximum flowrates for sanitary and storm sewer? What...
Flow in Sewers What are the minimum and maximum flowrates for sanitary and storm sewer? What is the reason (rationale) for applying such minimum and maximum for each sewer type? Present answer in Tabulation
A new development is being planned, which will connect to the city ’s sanitary sewer system....
A new development is being planned, which will connect to the city ’s sanitary sewer system. This development will have 80 acres of medium-density residential assume 10 DU / acre and 2.8 persons per DU). Assume a per capita sewage rate of 90 gal/d/person. Additionally, a new community hospital will be constructed with 300 beds (assume 300 gal/d/bed). Assume I/I contribution of 10%. a. Calculate the mean sewer discharge (accounting for residential, commercial, and I/I flows). b. Calculate the maximum...
Explain the terms Hydraulic Grade Line and Total Energy Line. Compare the total energy line and...
Explain the terms Hydraulic Grade Line and Total Energy Line. Compare the total energy line and hydraulic grade lines for the pipe sections if there is sudden enlargement in the pipe section or sudden contraction in the pipe with the help of sketches.
The line spectra are an unchanging characteristic of each of the elements. Explain the connection between...
The line spectra are an unchanging characteristic of each of the elements. Explain the connection between line spectra and the electronic nature of the atom. Your explanation must include the following: electron, energy level, light energy, photon, line spectra absorption, and emission.
Explain the process of establishing new accounts for fixed assets that will be depreciated like equipment....
Explain the process of establishing new accounts for fixed assets that will be depreciated like equipment. Why is accumulated depreciation set up with a negative beginning balance? What is the purpose of depreciation? What financial benefits does deprecation add to the organization?
A grade line AB having a slope of -4% intersect another grade line BC having a...
A grade line AB having a slope of -4% intersect another grade line BC having a slope of +2% at B. The elevations of points A, B and C are 93 m, 87 m and 92 m respectively. Determine the: a) elevation of the sag of the 200 m vertical parabolic curve to connect the grade lines; b) location of sag from where the curve starts; c) station of sag if PI is at station 10+20 (format: 00+00.00); d) vertical...
Outline the process for establishing pay rates.
Outline the process for establishing pay rates.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT