In the design of a city water supply system, three reservoirs are connected by three pipes...

In the design of a city water supply system, three reservoirs are connected by three pipes which meet at the junction. Reservoir A needs to supply 0.0938 m3/s to lower reservoirs B (Elevation 150 m) and C (Elevation 140 m). Pipe 1 is 900 m long and 300 mm in diameter, pipe 2 is a 200 mm diameter pipe 387 m long, and pipe 3 is 200 mm in diameter and 700 m long. The roughness coefficient for all pipes is 0.011.
a. Determine the discharge in pipe 2.
b. Compute the discharge in pipe 3.
c. What is the elevation of the water surface of reservoir A?

Solutions

Expert Solution


Related Solutions

introduction and background on the design of water supply system. Present the concepts of water flow...
introduction and background on the design of water supply system. Present the concepts of water flow in piping system focusing on energy equation (Bernoulli equation), head losses, and momentum. Support all the information with references. Provide the objectives at the end of the section. Briefly present the main objective of this report. State the approach used to achieve the tasks focusing into the equations used in the calculation. You can evaluate your design through the results you achieved such as...
Two large tanks are connected by two pipes of different size in parallel. Water temperature is...
Two large tanks are connected by two pipes of different size in parallel. Water temperature is 20°C. The surface water elevation in the upstream reservoir (Reservoir I) is 175m. The length of each pipe is 1250 m, and other properties are specified in the following: Pipe A: diameter 0.5m, and frictional factor 0.025; Pipe B: diameter 0.25m, the frictional factor is not given, but relative roughness is 0.006 under the flow condition observed. Flow velocity in Pipe A is 2m/s....
Alternative Water Supply Gordon Rivers, the city manager of Saratoga, Florida, pitched the proposed design schedule...
Alternative Water Supply Gordon Rivers, the city manager of Saratoga, Florida, pitched the proposed design schedule back at Jay Andrews. Jay Andrews is the Project Manager for Major Design Corporation (MDC). The city of Saratoga selected MDC for this project. As project manager, it is Jay’s responsibility to assemble the technical team necessary to complete the project, develop and track the budget, establish and maintain the schedule, allocate resources as required, and manage the project until completion. “We need the...
A city plans to upgrade its storm water management infrastructure by installing new pipes. The installation...
A city plans to upgrade its storm water management infrastructure by installing new pipes. The installation costs 2.1 million dollars and the annual maintenance cost is $28,000. Every 10 years, the system needs to be fully examined which requires a fixed management and material cost of $ 20,000 and a variable labor cost at the rate of $25/hr. 8 full time (working 8 hours per day) workers will be employed for 40 days for this task. If the infrastructure has...
b) The load connected to a three-phase supply comprises three similar coils connected in star. If...
b) The load connected to a three-phase supply comprises three similar coils connected in star. If the phase currents are 10A and the total active power and power factor absorb by the loads are 3kW and 0.8 lagging, respectively. Find: i. The magnitude of phase and line voltages ii. Total apparent power (1 mark) iii. The impedance of each coil. c) If the coil in Q3(b) are now connected in delta to the same three-phase supply, calculate the magnitude of...
Explain water supply strategies in sustainable design.
Explain water supply strategies in sustainable design.
A system of caves is a group of connected underground tunnels. Design an ADT for a...
A system of caves is a group of connected underground tunnels. Design an ADT for a cave and a cave system. An archaeologist should be able to add a newly discovered cave to a cave system. He/she can enter this system through only one cave and exit the system only through a different cave. Duplicate caves – based on GPS coordinates – are not permitted. Archaeologists should also be able to list the caves in a given cave system. (JAVA)
A system of caves is a group of connected underground tunnels. Design an ADT for a...
A system of caves is a group of connected underground tunnels. Design an ADT for a cave and a cave system. An archaeologist should be able to add a newly discovered cave to a cave system. He/she can enter this system through only one cave and exit the system only through a different cave. Duplicate caves – based on GPS coordinates – are not permitted. Archaeologists should also be able to list the caves in a given cave system. File...
The composite shaft shown in the figure consists of two steel pipes that are connected at...
The composite shaft shown in the figure consists of two steel pipes that are connected at flange B and securely attached to rigid walls at A and C. Steel pipe (1) has an outside diameter of 158 mm and a wall thickness of 6 mm. Steel pipe (2) has an outside diameter of 114 mm and a wall thickness of 4 mm. Both pipes are 3.5 m long and have a shear modulus of 80 GPa. If a concentrated torque...
Two pipes are connected in parallel, the characteristics of pipe A are D = 0.2m, L...
Two pipes are connected in parallel, the characteristics of pipe A are D = 0.2m, L = 1000m, λ(lamda) = 0.014 and of pipe B are D = 0.25m, L = 2000m, λ (lamda) = 0.017; what will be the total discharge if the head loss in the pipe A is 14.3 m? Neglect the local losses. Lütfen birini seçin: A. 0.133 m3/s B. 0.093 m3/s C. 0.106 m3/s D. 0.079 m3/s