Question

In: Accounting

Activity rates are determined by a. dividing the actual cost for each activity pool by the...

Activity rates are determined by
  • a. dividing the actual cost for each activity pool by the estimated activity base for that pool.
  • b. dividing the cost budgeted for each activity pool by the actual activity base in that pool.
  • c. dividing the cost budgeted for each activity pool by the estimated activity base for that pool.
  • d. dividing the actual cost for each activity pool by the actual activity base for that pool.

Solutions

Expert Solution

c. dividing the cost budgeted for each activity pool by the estimated activity base for that pool


Related Solutions

  In activity-based costing, the activity rate for an activity cost pool is computed by dividing...
  In activity-based costing, the activity rate for an activity cost pool is computed by dividing the total overhead cost in the activity cost pool by:   Multiple Choice the total activity for the activity cost pool. the direct labor-hours required by the product. the machine-hours required by the product. the total direct labor-hours for the activity cost pool.
Compute the ABC rates based on the following information: Activity Cost Pool (a) Estimated Overhead Cost...
Compute the ABC rates based on the following information: Activity Cost Pool (a) Estimated Overhead Cost (b) Expected Activity Labor related........................... $ 5,200 800 DLHs Machine related....................... 1,500 2,000 MHs Machine setups........................ 4,200 100 setups Production orders..................... 1,800 50 orders Product testing........................ 4,800 200 tests Packaging............................... 7,000 500 packages General factory........................ 108,800 800 DLHs Compute the single overall predetermined overhead rate based entirely on direct labor-hours: Compute the cost for completing 100,000 widgets if the direct materials cost was $45,000...
an activity-cost pool a. a measure of the activity performed serves as the cost allocation base....
an activity-cost pool a. a measure of the activity performed serves as the cost allocation base. b. the costs have a cause-and-effect relationship with the cost-allocation base for that activity. c. the cost pools are homogeneous over time. d. costs in a cost pool can always be traced directly to products. e. each pool pertains to a narrow and focused set of costs. Answer the following question(s) using the information below. Peter’s Printers has contracts to complete weekly supplements required...
In activity-based costing, each major activity has its own overhead cost pool, its own activity measure,...
In activity-based costing, each major activity has its own overhead cost pool, its own activity measure, and its own overhead rate. True or False TrueFalse
Kam Company has the following cost pools, drivers, and pool rates for its activity-based costing system:...
Kam Company has the following cost pools, drivers, and pool rates for its activity-based costing system: Pool Driver Rate Design design hours $2,200 per design hour Creation machine hours $80 per MH Ordering of Parts number of orders $300 per order Al Company placed and order with Kam Company for 2,000 units of a custom product. The order required 15 design hours, 900 machine hours, and one parts order. How much overhead cost is assigned to Al's order using activity-based...
2) Gable Company uses three activity cost pools. Each pool has a cost driver. Information for...
2) Gable Company uses three activity cost pools. Each pool has a cost driver. Information for Gable Company follows: Activity Cost Pools Total Cost of Pool Cost Driver Estimated Cost Driver Machining $ 380,120 Number of machine hours 88,400 Designing costs 86,400 Number of design hours 9,000 Setup costs 74,672 Number of batches 525 Suppose that Gable Company manufactures three products, A, B, and C. Information about these products follows: Product A Product B Product C Number of machine hours...
Gable Company uses three activity cost pools. Each pool has a cost driver. Information for Gable...
Gable Company uses three activity cost pools. Each pool has a cost driver. Information for Gable Company follows: Activity Cost Pools Total Cost of Pool Cost Driver Estimated Cost Driver Machining $ 259,000 Number of machine hours 85,600 Designing costs 59,000 Number of design hours 7,800 Setup costs 72,000 Number of batches 370 Required: 1. Compute the activity rate for each activity. (Round your answers to 2 decimal places.) Activity Activity Rate Machining per Machine Hrs Design Costs per Design...
1) Required information Gable Company uses three activity cost pools. Each pool has a cost driver....
1) Required information Gable Company uses three activity cost pools. Each pool has a cost driver. Information for Gable Company follows: Activity Cost Pools Total Cost of Pool Cost Driver Estimated Cost Driver Machining $ 236,300 Number of machine hours 69,500 Designing costs 58,725 Number of design hours 6,750 Setup costs 71,350 Number of batches 500 Required: 1. Compute the activity rate for each activity. 2. Classify each activity as facility, product, batch, or unit level. 2) Required information Gable...
Chapter 7 - problem 18 Activity cost Pool                                   &nbs
Chapter 7 - problem 18 Activity cost Pool                                         Activity Measure                       Total Activity Removing asbestos ………………. Thousands of square feet              800 thousand square feet Equipment and job steps…………. Number of jobs                              500 jobs Working on nonroutine jobs………. Number of jobs nonroutine jobs    100 nonroutine jobs                    Other organization-sustaining costs and idle capacity costs …………… None Note The 100 nonrountine jobs are included in the total of 500 jobs. Both nonroutine jobs and routine jobs require estimating and steps. Cots for the Year...
Calculating Activity-Based Costing Overhead Rates 1. Calculate the cost per unit of activity driver for each...
Calculating Activity-Based Costing Overhead Rates 1. Calculate the cost per unit of activity driver for each activity cost category. Setup $_____ Production scheduling $______ Production engineering $______ Supervision $_______ Machine maintenance $______ 2. Calculate the cost of Job 845 using ABC to assign the overhead costs. $______ 3. Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours. (Round your answer to the nearest dollar.) $_____ A food company had the following activities and costs:...