an activity-cost pool a. a measure of the activity performed serves as the cost allocation base....

an activity-cost pool

a. a measure of the activity performed serves as the cost allocation base.

b. the costs have a cause-and-effect relationship with the cost-allocation base for that activity.

c. the cost pools are homogeneous over time.

d. costs in a cost pool can always be traced directly to products.

e. each pool pertains to a narrow and focused set of costs.


Answer the following question(s) using the information below.

Peter’s Printers has contracts to complete weekly supplements required by forty-six customers. For the year 2019, manufacturing overhead cost estimates total $420,000 for an annual production capacity of 12 million pages.

For 2019, Peter’s Printers has decided to evaluate the use of additional cost pools. After analyzing manufacturing overhead costs, it was determined that number of design changes, setups, and inspections are the primary manufacturing overhead cost drivers. The following information was gathered during the analysis:

Cost pool

Manufacturing overhead costs

Activity level

Design changes

$60,000

300 design changes

Setups

320,000

5,000 setups

Inspections

40,000

8,000 inspections

Total manufacturing overhead costs

$420,000


During 2019, two customers, World Makers and Happy Studios, are expected to use the following printing services:


Activity

World Makers

Happy Studios

Pages

60,000

76,000

Design changes

10

0

Setups

20

10

Inspections

30

38


4. What is the cost driver rate if manufacturing overhead costs are considered one large cost pool and are assigned based on 12 million pages of production capacity?

a. $0.05 per page

b. $0.035 per page

c. $0.35 per page

d. $0.025 per page

e. $0.045 per page


5. Using pages printed as the only overhead cost driver, what is the manufacturing overhead cost estimate for World Makers during 2019?

a. $2,500

b. $21,000

c. $1,500

d. $2,700

e. $2,100

Solutions

Expert Solution

Question 1:

Answer: b. the costs have a cause-and-effect relationship with the cost-allocation base for that activity.

Explanation:

An activity cost pool is the costs that have a cause-and-effect relationship with the cost-allocation base for that activity. A group of various individual cost items are called cost pool. For example, Machine setups, inspection cost etc.

Question 4:

Answer: c. $0.35 per page

Calculation:

Manufacturing overhead cost per page = Manufacturing Overhead costs / Number of pages

Manufacturing overhead costs = $420,000

Number of pages = 1,200,000

Manufacturing overhead cost per page = $420,000 / 1,200,000 pages = $0.35 per page

Question 5:

Answer: b. $21,000

Calculation:

World Markers's number of pages = 60,000

Manufacturing overhead cost per page = $420,000 / 1,200,000 pages = $0.35 per page

Manufacturing overhead cost for World Makers = 60,000 pages * $0.35 per page = $21,000

All the best...


Related Solutions

Activity Indirect Cost Allocation Base Allocation base by Ale Allocation base by nonAle Allocation base by...
Activity Indirect Cost Allocation Base Allocation base by Ale Allocation base by nonAle Allocation base by total Brewing $5000 Direct Labor 65hours 25 hours 90 hours Bottling $11000 Machine hours 80hours 30 hours 110 hours Inspecting $4000 Bottles 8000 bottles 2000 bottles 10000bottles Other pertinent information: 1.Cost for ingredients and bottles for Ale is $0.35 per bottle 2.Cost for ingredients and bottles for NonAle is $0.25 per bottle. 3. The labor costs to make a bottle of beer is the...
In activity-based costing, each major activity has its own overhead cost pool, its own activity measure,...
In activity-based costing, each major activity has its own overhead cost pool, its own activity measure, and its own overhead rate. True or False TrueFalse
Discuss how cost allocation or transfer pricing and activity-base cost applies to banking industry and financial...
Discuss how cost allocation or transfer pricing and activity-base cost applies to banking industry and financial institution. Once you have identified the subject of interest, your post should focus on an assessment of the situation. What do you believe are the key issues? If there are problems, what solutions do you see? If this is a post that illustrates a successful resolution of a challenge, how was this success achieved?
Discuss how cost allocation or transfer pricing and activity-base cost applies to banking industry and financial...
Discuss how cost allocation or transfer pricing and activity-base cost applies to banking industry and financial institution. Once you have identified the subject of interest, your post should focus on an assessment of the situation. What do you believe are the key issues? If there are problems, what solutions do you see? If this is a post that illustrates a successful resolution of a challenge, how was this success achieved?
Activity of Activity Allocation Base Allocation Rate Materials handling. . $310,000 Number of parts $0.60 Assembling....
Activity of Activity Allocation Base Allocation Rate Materials handling. . $310,000 Number of parts $0.60 Assembling. . . . . . . $2,200,000 Direct labor hours $13.00 Painting. . . . . . . . . . . . . $150,000 Number of painted desks $4.90 McKnightMcKnight produced two styles of desks in? March: the Standard desk and Unpainted desk. Data for each? follow: Total Total Direct Total Total Assembling Units Materials Number Direct Labor Product Produced Costs of Parts...
  In activity-based costing, the activity rate for an activity cost pool is computed by dividing...
  In activity-based costing, the activity rate for an activity cost pool is computed by dividing the total overhead cost in the activity cost pool by:   Multiple Choice the total activity for the activity cost pool. the direct labor-hours required by the product. the machine-hours required by the product. the total direct labor-hours for the activity cost pool.
Activity rates are determined by a. dividing the actual cost for each activity pool by the...
Activity rates are determined by a. dividing the actual cost for each activity pool by the estimated activity base for that pool. b. dividing the cost budgeted for each activity pool by the actual activity base in that pool. c. dividing the cost budgeted for each activity pool by the estimated activity base for that pool. d. dividing the actual cost for each activity pool by the actual activity base for that pool.
What other options for the activity base and the importance of the MOH allocation. Do multiple...
What other options for the activity base and the importance of the MOH allocation. Do multiple product lines impact the MOH allocation?
Activity cost pool Machine setup Materials handling Machine depreciation Activity cost driver Number of setups Number...
Activity cost pool Machine setup Materials handling Machine depreciation Activity cost driver Number of setups Number of parts Machine hours (mh) Cost assigned to pool 260000 580000 600000 Standard product 60 setups 14000 parts 2 mh per product Custom product 40 setups 12000 parts 4mh per product the company produced 14 000 basic products and 10000 custom product. compute the activity overhead rate for each cost pool using ABC.
Differentiate between traditional cost allocation methods and activity-based costing.
Differentiate between traditional cost allocation methods and activity-based costing.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT