Question

In: Accounting

Perform a present worth (PW)-based evaluation of the two alternatives below using a spreadsheet. The after-tax...

Perform a present worth (PW)-based evaluation of the two alternatives below using a spreadsheet. The after-tax minimum acceptable rate of return (MARR) is 8% per year, Modified Accelerated Cost Recovery System (MACRS) depreciation applies, and Te = 40%. The (GI - OE) estimate is made for the first 3 years; it is zero in year 4 when each asset is sold.

Alternative X Y
First Cost, $ –8,000 –13,000
Salvage Value, Year 4, $ 0 2,000
GI-OE, $ per Year 3,500 5,000
Recovery Period, Years 3 3

The PW for alternative X is determined to be____ $ .

The PW for alternative Y is determined to be____ $ .

Alternative (Click to select)XY is selected.

Solutions

Expert Solution


Related Solutions

Perform a present worth (PW)-based evaluation of the two alternatives below using a spreadsheet. The after-tax...
Perform a present worth (PW)-based evaluation of the two alternatives below using a spreadsheet. The after-tax minimum acceptable rate of return (MARR) is 8% per year, Modified Accelerated Cost Recovery System (MACRS) depreciation applies, and Te = 40%. The (GI - OE) estimate is made for the first 3 years; it is zero in year 4 when each asset is sold. Alternative X Y First Cost, $ –8,000 –13,000 Salvage Value, Year 4, $ 0 2,000 GI-OE, $ per Year...
Perform a present worth (PW)-based evaluation of the two alternatives below using a spreadsheet. The after-tax...
Perform a present worth (PW)-based evaluation of the two alternatives below using a spreadsheet. The after-tax minimum acceptable rate of return (MARR) is 8% per year, Modified Accelerated Cost Recovery System (MACRS) depreciation applies, and Te = 40%. The (GI - OE) estimate is made for the first 3 years; it is zero in year 4 when each asset is sold. Alternative X Y First Cost, $ –8,000 –13,000 Salvage Value, Year 4, $ 0 2,000 GI-OE, $ per Year...
Compare two alternatives, A and B on the basis of a present worth evaluation using i=8%...
Compare two alternatives, A and B on the basis of a present worth evaluation using i=8% per year and study period of 8 years. Which alternative should be selected based on PW calculation and what is the PW value of the selected alternative? Show work for both alternatives. No excel. Alternative A B First cost, $ -15,000 -28,000 Annual operating cost -6,000 -9,000 Overhaul in year 4 - -2,000 Salvage value 3,000 5,000 Life, Years 4 8
For the below ME alternatives , which machine should be selected based on the PW analysis....
For the below ME alternatives , which machine should be selected based on the PW analysis. MARR=10%. Machine A Machine B Machine C First cost, $ 15000 30000 11,265 Annual cost, $/year   14,021                6,000             4,000 Salvage value, $                  4,000                5,000             1,000 Life, years 3 6 2 Answer the below questions : C- PW for machine C =
For the below ME alternatives , which machine should be selected based on the PW analysis....
For the below ME alternatives , which machine should be selected based on the PW analysis. MARR=10% Machine A Machine B Machine C First cost, $ 22,421 30000 10000 Annual cost, $/year   8,497                6,000             4,000 Salvage value, $                  4,000                5,000             1,000 Life, years 3 6 2 Answer the below questions : A- PW for machine A=
For the below ME alternatives , which machine should be selected based on the PW analysis....
For the below ME alternatives , which machine should be selected based on the PW analysis. MARR=10% Machine A Machine B Machine C First cost, $ 15000 21,476 10000 Annual cost, $/year   8,095                6,000             4,000 Salvage value, $                  4,000                5,000             1,000 Life, years 3 6 2 Answer the below questions : B- PW for machine B=
For the below ME alternatives , which machine should be selected based on the PW analysis....
For the below ME alternatives , which machine should be selected based on the PW analysis. MARR=10% Machine A Machine B Machine C First cost, $ 23,979 30000 10000 Annual cost, $/year   8,679                6,000             4,000 Salvage value, $                  4,000                5,000             1,000 Life, years 3 6 2 Answer the below questions : A- PW for machine A=
Please Solve it ASAP. "A company's present worth (PW) is given by the following equation: PW...
Please Solve it ASAP. "A company's present worth (PW) is given by the following equation: PW = -$180069 + 2.056X(Y-15) + 33180S, where X is the demand, Y is the unit price, and S is a factor that determines the salvage value. All three of these are random variables. Use simulation, like SIPMath, to simulate the present worth of BMC with 100,000 trials. Set X as a normal distribution with mean 2415 and standard deviation 119. Set Y as a...
"A company's present worth (PW) is given by the following equation: PW = -$180062 + 2.199X(Y-15)...
"A company's present worth (PW) is given by the following equation: PW = -$180062 + 2.199X(Y-15) + 36560S, where X is the demand, Y is the unit price, and S is a factor that determines the salvage value. All three of these are random variables. Use simulation, like SIPMath, to simulate the present worth of BMC with 100,000 trials. Set X as a normal distribution with mean 2292 and standard deviation 114. Set Y as a trianglular distribution with the...
For the below ME alternatives , which machine should be selected based on the PW analysis. MARR=10%.
For the below ME alternatives , which machine should be selected based on the PW analysis. MARR=10%.Machine AMachine BMachine CFirst cost, $              15000            30000          10,423Annual cost, $/year                 12,340               6,000            4,000Salvage value, $                 4,000               5,000            1,000Life, years 362Answer the below questions :A- PW for machine C =B- Based on the PW value you got in the previous questions, which machine we should select? type you explanation below 