Question

In: Accounting

Unit Cost and Cost Assignment, Nonuniform Inputs Loran Inc. had the following equivalent units schedule and...

Unit Cost and Cost Assignment, Nonuniform Inputs

Loran Inc. had the following equivalent units schedule and cost for its fabrication department during September:

Materials Conversion
Units completed 180,000 180,000
Add: Units in ending WIP x Fraction complete 72,000 41,040
  (72,000 x 57%)
Equivalent units of output 252,000 221,040
Costs:
  Work in process, September 1:
    Materials $147,000
    Conversion costs 7,875
      Total $154,875
   Current costs:
    Materials $1,080,000
    Conversion costs 451,860
      Total $1,531,860

Required:

1. Calculate the unit cost for materials, for conversion, and in total for the fabrication department for September. If required, round your answers to the nearest cent.

Unit materials cost $
Unit conversion cost $
Total unit cost $

2. Calculate the cost of units transferred out and the cost of EWIP. Round unit cost value to the nearest cent in intermediate calculations. If required, round final answers to the nearest dollar.

Cost transferred out $
Cost of ending work in process

Solutions

Expert Solution

Requirement 1

Unit materials cost $ 4.87
Unit conversion cost $ 2.08
Total unit cost $ 6.95

Requirement 2

Cost transferred out $ 1,251,000
Cost of ending work in process $ 436,003

Working

Cost per Equivalent Units (Weighted average)
COST Material Conversion cost TOTAL
Beginning WIP Inventory Cost $ 147,000 $ 7,875 $ 154,875
Cost incurred during period $ 1,080,000 $ 451,860 $ 1,531,860
Total Cost to be accounted for $ 1,227,000 $ 459,735 $ 1,686,735
Total Equivalent Units                 252,000                  221,040
Cost per Equivalent Units $                   4.87 $                     2.08 $                6.95

.

Statement of cost (Weighted average)
Cost Equivalent Cost/unit Ending WIP Transferred
Units Cost Allocated Units Cost Allocated
Material $ 4.87                   72,000 $        350,640.00             180,000 $        876,600.00
Conversion cost $ 2.08                   41,040 $          85,363.20             180,000 $        374,400.00
TOTAL $ 1,687,003 TOTAL $ 436,003 TOTAL $ 1,251,000

Related Solutions

Unit Cost and Cost Assignment, Nonuniform Inputs Loran Inc. had the following equivalent units schedule and...
Unit Cost and Cost Assignment, Nonuniform Inputs Loran Inc. had the following equivalent units schedule and cost for its fabrication department during September: Materials Conversion Units completed 180,000 180,000 Add: Units in ending WIP x Fraction complete 67,000 35,510   (67,000 x 53%) Equivalent units of output 247,000 215,510 Costs:   Work in process, September 1:     Materials $147,000     Conversion costs 7,875       Total $154,875    Current costs:     Materials $1,206,000     Conversion costs 430,980       Total $1,636,980 Required: 1. Calculate the unit cost for materials, for conversion,...
Cost Information and FIFO Gunnison Company had the following equivalent units schedule and cost information for...
Cost Information and FIFO Gunnison Company had the following equivalent units schedule and cost information for its Sewing Department for the month of December: Direct Materials         Conversion Costs   Units started and completed 50,000 50,000   Add: Units in beginning work in process ×          Percentage complete:          5,000 × 0% direct materials —          5,000 × 50% conversion Costs 2,500   Add: Units in ending work in process ×          Percentage complete:          14,000 × 100% direct materials 14,000 —          14,000 × 35% conversion Costs —...
Cost Information and the Weighted Average Method Morrison Company had the equivalent units schedule and cost...
Cost Information and the Weighted Average Method Morrison Company had the equivalent units schedule and cost information for its Sewing Department for the month of December, as shown below. Direct Materials Conversion Costs Units completed 44,000 44,000 Add: Units in ending work in process ×      Percentage complete:         19,000 × 100% direct materials 19,000 —         19,000 × 45% conversion materials — 8,550 Eqivalent units of output 63,000 52,550 Costs:         Work in process, December 1:           Direct materials...
Cost Information and the Weighted Average Method Morrison Company had the equivalent units schedule and cost...
Cost Information and the Weighted Average Method Morrison Company had the equivalent units schedule and cost information for its Sewing Department for the month of December, as shown below. Direct Materials Conversion Costs Units completed 48,000 48,000 Add: Units in ending work in process ×      Percentage complete:         17,000 × 100% direct materials 17,000 —         17,000 × 40% conversion materials — 6,800 Eqivalent units of output 65,000 54,800 Costs:         Work in process, December 1:           Direct materials...
Cornerstone Exercise 6.8 (Algorithmic) Cost Information and FIFO Gunnison Company had the following equivalent units schedule...
Cornerstone Exercise 6.8 (Algorithmic) Cost Information and FIFO Gunnison Company had the following equivalent units schedule and cost information for its Sewing Department for the month of December: Direct Materials Conversion Costs Units started and completed 40,000 40,000 Add: Units in beginning work in process × Percentage complete: 6,000 × 0% direct materials — 6,000 × 50% conversion Costs 3,000 Add: Units in ending work in process × Percentage complete: 11,000 × 100% direct materials 11,000 — 11,000 × 35%...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 41,000 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000;...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 41,000 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000;...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for...
FIFO Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 40,500 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000;...
Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures...
Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, Oklahoma, plant reported the following data: In Cutting, all direct materials are added at the beginning of the process. Beginning work in process consisted of 41,000 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct...
using the schedule from unit 3 assignment, estimate the cost for each activity. Unit 3 Case...
using the schedule from unit 3 assignment, estimate the cost for each activity. Unit 3 Case Assignment (Wedding) – Baseline Schedule of activities. WBS # DESCRIPTION RESPONSIBLE Duration 1 Budget & Planning Tony 9 days 1.1 Create a Timeline Peggy Sue 2 1.2 Estimate Budget Tony 2 1.3 Evaluate Estimated Budget/Timeline & Actual Cost of Wedding Tony 5 2 Guest List Peggy Sue 33 days 2.1 Determine Guest List Tony 7 2.2 Create & Mail “Save the Date” Peggy Sue...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT