The cost formulas for Swan Company's manufacturing overhead costs are given below. The costs cover a range of 20,000 to 40,000 machine-hours.
Overhead Costs | Cost Formula |
utilities | $20,600 plus $0.10 per machine-hour |
maintenance | $40,000 plus $1.60 per machine-hour |
supplies | $0.30 per machine-hour |
indirect labor | $130,000 plus $0.70 per machine-hour |
depreciation | $70,000 |
Required:
Prepare a flexable manufacturing overhead budget assuming a budgeted level of activity of 30,000 machine-hours. Include all costs in your flexable budget.
Per Unit | Total | |
Variable Costs: | _________ | _________ |
total variable costs | ||
Fixed Costs: | _________ | |
Total Fixed Costs | ||
Calculate the predetermined overhead rate.
Predetermined overhead rate = ________________
Calculate the variable portion of the predetermined overhead rate.
Variable portion of the predetermined overhead rate = ______________
Calculate the fixed portion of the predetermined overhead rate.
fixed portion of the predetermined overhead rate = ______________