In: Accounting
Hi-Tek Manufacturing, Inc., makes two types of industrial component parts—the B300 and the T500. An absorption costing income statement for the most recent period is shown:
|
Hi-Tek Manufacturing Inc. Income Statement |
|||
| Sales | $ | 1,722,000 | |
| Cost of goods sold | 1,235,410 | ||
| Gross margin | 486,590 | ||
| Selling and administrative expenses | 570,000 | ||
| Net operating loss | $ | (83,410 | ) |
Hi-Tek produced and sold 60,500 units of B300 at a price of $20 per unit and 12,800 units of T500 at a price of $40 per unit. The company’s traditional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the company’s two product lines is shown below:
| B300 | T500 | Total | ||||
| Direct materials | $ | 400,700 | $ | 162,900 | $ | 563,600 |
| Direct labor | $ | 120,600 | $ | 42,200 | 162,800 | |
| Manufacturing overhead | 509,010 | |||||
| Cost of goods sold | $ | 1,235,410 | ||||
The company has created an activity-based costing system to evaluate the profitability of its products. Hi-Tek’s ABC implementation team concluded that $57,000 and $101,000 of the company’s advertising expenses could be directly traced to B300 and T500, respectively. The remainder of the selling and administrative expenses was organization-sustaining in nature. The ABC team also distributed the company’s manufacturing overhead to four activities as shown below:
| Manufacturing Overhead |
Activity | |||||
| Activity Cost Pool (and Activity Measure) | B300 | T500 | Total | |||
| Machining (machine-hours) | $ | 207,090 | 90,700 | 62,700 | 153,400 | |
| Setups (setup hours) | 139,920 | 78 | 240 | 318 | ||
| Product-sustaining (number of products) | 101,800 | 1 | 1 | 2 | ||
| Other (organization-sustaining costs) | 60,200 | NA | NA | NA | ||
| Total manufacturing overhead cost | $ | 509,010 | ||||
Required:
1. Compute the product margins for the B300 and T500 under the company’s traditional costing system.
2. Compute the product margins for B300 and T500 under the activity-based costing system.
3. Prepare a quantitative comparison of the traditional and activity-based cost assignments.