Question

In: Mechanical Engineering

1. How much oil (in tonnes) would be required in an oil-fired power plant to generate...

1. How much oil (in tonnes) would be required in an oil-fired power plant to generate the equivalent amount of electrical energy as the hydropower generates in a year? The energy content of oil is 11,630 kWh/tonne and chemical to electrical energy conversion efficiency is about 30%.

2. How much (in tonnes) would be the CO2 emissions if the Oil power plant was used? Assume the oil power plant produces 0.27 kg CO2 per kWh

Solutions

Expert Solution

Note - answer will depend of capacity of hydropower plant here I took energy generation by all hydropower plants in USA.


Related Solutions

A coal-fired power plant produces power  with costs . Each unit of power earns the plant ....
A coal-fired power plant produces power  with costs . Each unit of power earns the plant . Burning coal releases particulate matter (PM2.5), a pollutant that is known to cause heart disease, lung disease, and birth defects. The coal plant borders a wildlife sanctuary which sells tourism visits  for a price $30. However, the sanctuary's animals are getting sick due to the negative externality of PM2.5, such that the costs to the sanctuary are . The local government decides to tax the...
How to calculate theoritical NOx and SO2 (mg/Nm3) in gases at coal fired power plant, if...
How to calculate theoritical NOx and SO2 (mg/Nm3) in gases at coal fired power plant, if known : Coal Calorific Value = 4500 kcal/kg Fuel consumption = 180 t/h Excess air = 18% Oxygen in exhaust gases = 5% Flue Gas Temperature in exhaust gases = 135 deg C Carbon Content = 30.110 Hydrogen Content = 3.610 Oxygen Content = 9.850 Sulfur Content = 0.330 Nitrogen Content = 0.700 Ash Content = 5.740 Moisture Content = 32.530 Thank you!
            The Fukushima Power plant is planning construction of a new plant to generate electricity four...
            The Fukushima Power plant is planning construction of a new plant to generate electricity four years hence and must decide now between a small, medium, or large-sized plant. The exact size needed is uncertain because future demands can only be estimated. Forecasters have estimated future demands and their likelihoods as follows: Level of Demand Probability High 0.30 Medium 0.55 Low 0.15 In the following, all the future costs and earnings have been adjusted to their present worth: If a...
At a coal-fired power plant, assume that lignite coal is being burned as shown in the...
At a coal-fired power plant, assume that lignite coal is being burned as shown in the following stoichiometric combustion reaction equation, which assumes that the nitrogen in the lignite and in the air is all converted to NO and that combustion is complete: CH0.96O0.18N0.016S0.012 + x (O2 + 3.78 N2) → CO2 + 0.48 H2O + 0.016 NO + 0.012 SO2 + 3.78x N2 (a) What is the value of the coefficient, x? (b) To ensure complete combustion, air must...
1.       Consumers Energy Inc (CSI) operates a coal fired power plant in Michigan, which has to...
1.       Consumers Energy Inc (CSI) operates a coal fired power plant in Michigan, which has to come in compliance with nitrogen oxide (NOx) standards by reducing its NOx emissions to 100 tons per year from its current level of 250 tons/year. It is considering the following options to come in compliance. Install Selective Catalytic Reactor (SCR) on its boiler. SCR reduces NOx emissions by absorbing NOx in exhaust flue gases. SCR requires a capital investment of $800,000 in year zero...
A power plant is planning construction of a new plant to generate electricity four years hence...
A power plant is planning construction of a new plant to generate electricity four years hence and must decide now between a small, medium, or large-sized plant. The exact size needed is uncertain because future demands can only be estimated. Forecasters have estimated future demands and their likelihoods as follows: Level of Demand Probability High 0.30 Medium 0.55 Low 0.15             In the following, all the future costs and earnings have been adjusted to their present worth: The capacity of...
A nuclear power plant is planned to be constructed near Sydney. The plant is required to...
A nuclear power plant is planned to be constructed near Sydney. The plant is required to have an installed capacity of 1200 MW and will be operated for 7500 hours per year. Consider providing 1200 MW of energy by two solar power plants; one in Sydney and the other in Canberra. It is required that a fixed solar module be mounted. Determine the following parameters if the overall efficiency of the module is given as 15%: a) The peak power...
If a coal-fired power plant burns 2 kg of coal to produce electricity, and the electricity...
If a coal-fired power plant burns 2 kg of coal to produce electricity, and the electricity is used to power an elevator motor that is 60% efficient, how high can the elevator and passengers be lifted up if their total mess is 1500 kg? and then How many human workers using muscle power('energy servants") would be needed to lift the elevator up to the same height, if they had one minute to do so? Assuming that one energy servant is...
A power plant burns 7.3 tonnes (i.e., 7.3*1000 =7300 Kg) coal per hour and discharges the...
A power plant burns 7.3 tonnes (i.e., 7.3*1000 =7300 Kg) coal per hour and discharges the combustion products through a stack of effective stack height of 75m. The coal has a sulfur content of 4.2% and the wind velocity at the top of the stack is 6 m/sec. The atmospheric conditions are moderately stable. Answer Determine SO2 concentrations for following locations: (0,0,0); (850m, 0,0); (850m, 0,75m); (850m, 0,-75m); (-850m, 0,75m); (0, 0,75m); (850m, ?y, ?z). (ii) Determine distance from stack...
A coal-fired power plant proposes to burn 3% sulfur coal with a heating value of 11,000...
A coal-fired power plant proposes to burn 3% sulfur coal with a heating value of 11,000 Btu/lb. If the plant is to meet the standard of performance given by EPA New Source Performance Standards (NSPS), what percent cleanup is required for SO2? What percent sulfur could the coal contain if the standards are to be met with no clean-up devices?