Question

In: Mechanical Engineering

How are the requirements for a design project developed?

How are the requirements for a design project developed?

Solutions

Expert Solution

There are following requirements for designing project-

  1. Define owner design requirements and project design needs- further to the design related information gathered audition of business case, designer manager should additional design related information from the owner and other relevant sources.
  2. Engage design Consultants- it includes all the key design consultants that are required to develop the functional design brief and concept design.
  3. Prepare the functional design brief and concept design- Manage the design consultant team to deliver the functional design and concept design that will respond to and record all owner's requirements and needs. Functional design brief will be supported by concept design sketches and report all of which provide an outline of proposed design.
  4. Prepare the design management plan- road map for the way the design will be managed and need to be prepared at this stage of design process for best result.

The key headings in design management plan are-

  • induction
  • Project overview
  • design objectives
  • design process and related procedures
  • design status
  • design documentation and deliverables schedule
  • Value Engineering
  • design reviews
  • design change
  • Peer review checks and permits
  • design quality management
  • Owner sign-offs
  • design close out and as built record.

5. Outline cost plan- the design manager needs to manage and co-ordinate the development of outline cost plan with the quantity surveyor with input from all relevant design Consultants

6. identify design risk- all design related risk identified in a business case stage should be reviewed and expanded upon with the input of entire design team. any safety indesign risk should also be identified

7.   Value Management- Value Management is a systematic review of the essential functions or performance of a project to ensure that best value for money is achieved. it takes an overall view of the function of a project as well as capital and recurrent cost.

8. determine project approval process- the design manager should now work with the design team to offline and define the planning approval process.

9. prepare design report- finalize and present the functional design brief, concept design and the outline design process results to the owner as an outline design report.


Related Solutions

The systems requirements in a software project includes the categories of primary requirements, derived requirements, design...
The systems requirements in a software project includes the categories of primary requirements, derived requirements, design constraints, and design goals. Briefly explain each category and how it is different from the other categories.
PROJECT 4 : DESIGN A HYDRAULIC MOBILE CRANE REQUIREMENTS: •Design the system to carry load of...
PROJECT 4 : DESIGN A HYDRAULIC MOBILE CRANE REQUIREMENTS: •Design the system to carry load of up to 5000 lb •Use a hydraulic winch(rotary actuator)to move the pulleys up and down •Use fail-safe measures to support positive loads and run-away issues •The speed of the crane shouldbe changeable •Use dampeners to prevent vibration and maintain pressure and flow where necessar
Design a spreadsheet to calculate the class’s grades. Consider the following requirements: Each project will be...
Design a spreadsheet to calculate the class’s grades. Consider the following requirements: Each project will be graded from 0 to 10. the contribution of each grade to the final grade are ( 7 team work assignments 10%, Project 1,2,3,4= 20%, mid term 35%, final 35%.) The final test will be graded from 0 to 100, but your solution should allow different grades (i.e 80 points, 90, or 95). This flexibility is very important. Program your solution to set a numeric...
How is the PDS product design specifications developed your product?.
How is the PDS product design specifications developed your product?.
How a project may be affected if Clear Statement of Requirements does not exist for a...
How a project may be affected if Clear Statement of Requirements does not exist for a certain project and techniques that a project manager may employ to help ensure that they are in place.
explain how labour requirements are determined on the project and how will you determine actual Labour...
explain how labour requirements are determined on the project and how will you determine actual Labour cost per task is within the allowable
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes,...
Explain how Design-Bid-Build and Design-Build project delivery methods can differently affect on management of project changes, claims, and disputes (Max 200 words).             
How does a scenario-based design approach help identify key design decisions on a project?
How does a scenario-based design approach help identify key design decisions on a project?
Explain how the CMS promoting interoperability program and its security requirements impact EHR design and use...
Explain how the CMS promoting interoperability program and its security requirements impact EHR design and use . Explain the role of encryption in storing and security secured data. Explain the importance of making ethical decisions to comply with security requirements when using EHR systems. How could aspects of a christian worldview help inform ethical decision making in the situation?
how many types of design drawings for a project? give brief explanations
how many types of design drawings for a project? give brief explanations
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT