Question

In: Civil Engineering

Design an overflow spillway profile for a design discharge of 1200 m3/s. The upstream water surface...

Design an overflow spillway profile for a design discharge of 1200 m3/s.

The upstream water surface level is at an elevation of 220 m and the upstream channel floor is at 180 m.

The spillway, having a vertical face, is 40 m long.

Solutions

Expert Solution

please give a like


Related Solutions

A rectangular channel with a base width of 3 m carries a discharge of 6 m3/s...
A rectangular channel with a base width of 3 m carries a discharge of 6 m3/s at a depth of 1.1 m. At downstream, there is a gradual rising of a channel bed of 0.1 m. a) Plot the specific energy curve from y = 0.4 m to 1.3 m in a step 0.1 m and from the curve, determine the depth of flow at the downstream section. Label the graph and show your working answers clearly on the graph....
Design a canal having a trapezoidal cross section to carry a design discharge of irrigation water...
Design a canal having a trapezoidal cross section to carry a design discharge of irrigation water of 900 cfs. The slope of the canal is to be 0.002. The canal is to be lined with concrete, and it is to have the best hydraulic section for the design flow. Adopt a Manning’s roughness coefficient ? for lined canals under (troweled concrete) ? = 0.012.
Given discharge is 450 m3/s, river width is 50 m at a depth of 6 m...
Given discharge is 450 m3/s, river width is 50 m at a depth of 6 m and bed slope of 0.0003, the sediment has a typical diameter of 0.01 m. Estimate the bedload transport using Shield and Einstein-Brown formula. 2. Annual precipitation measurements (Pi in cm) for M City, were given in Problem 1. Determine the magnitude of the 10-year precipitation depth if the data fit: the normal distribution. the Gumbel distribution. How many times was the P10 (normal) exceeded...
13.(LAB) A discharge of 25 m3/s is passing in a rectangular channel of bed width 8.0...
13.(LAB) A discharge of 25 m3/s is passing in a rectangular channel of bed width 8.0 meters and water depth 3.0 meters. The channel bed width is gradually contracted from 8.0 meters at section (1) to 6.0 meters at section (2). In the contraction zone, a smooth hump is placed in the channel in which the bed level is gradually increased by 1.00 m. Determine: (i) The change in water levels, (ii).The minimum height of hump so that y2 =...
Sketch water surface profile in two rectangular channels that are joined with the following information. a....
Sketch water surface profile in two rectangular channels that are joined with the following information. a. Slope is changing from 0.0016 to 0.015 ? = 0.013 ? = 10 ?? ? = 400 ??? ?0−?ℎ????? 1 = 0.0016 ?0−?ℎ????? 2 = 0.015
Design a trapezoidal channel to pass a discharge of 10m3/s and the channel will be excavated...
Design a trapezoidal channel to pass a discharge of 10m3/s and the channel will be excavated through rock by blasting. The topography in the area is such that a bottom slope of 1 in 4000 will be suitable. Assume that n = 0.030 and select a value for the side slope, Z, as 1 horizontal to 4 verticals. Sketch the diagram for all calculated dimensions.
Design a 3-bit 2’s complement adder/subtractor with overflow flag detection Design and simulate a structural model...
Design a 3-bit 2’s complement adder/subtractor with overflow flag detection Design and simulate a structural model (not behavioral) of a 3-bit Adder/Subtractor). Use the 3-bit carry propagate adder of the project as a module for your adder/subtractor. The inputs A and B should be positive binary numbers where vector B must be converted to a negative 2's complement when a subtraction operation is configured. When m=0 it should perform and addition (A+B) and if m=1 it should perform a subtraction...
The discharge through a rectangular channel 4.4 m wide is 16 m3/s. The Manning’s coefficient n...
The discharge through a rectangular channel 4.4 m wide is 16 m3/s. The Manning’s coefficient n is 0.03. Determine the normal depth when the slope is 0.008. Check whether the flow is sub or supercritical. If the normal depth is to be kept at 2 m, determine the slope.
A 0.8-km concrete lined canal carries a discharge of 1.20 m3/s. Determine the head loss along...
A 0.8-km concrete lined canal carries a discharge of 1.20 m3/s. Determine the head loss along the channel if the width is 2 m and the flow depth is at 1.2 m. Assume n = 0.018
Design a system to move 100 gpm of water from a river with surface water elevation...
Design a system to move 100 gpm of water from a river with surface water elevation of 201.35 ft msl to a tank with surface water elevation = 246.55 ft msl. The tank is pressurized; the air pressure in the tank is 60 psig. The total length of pipe is 125 ft with 6 standard elbows all made of Sch 40 steel pipe. Your design should specify the nominal diameter of pipe (use only commercially available sizes) and the power...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT