Capital Budgeting: Estimating Cash: Cash Flow Estimation and Risk Analysis: Real Options

DCF analysis doesn't always lead to proper capital budgeting decisions because capital budgeting projects are not -Select-activepassiverealCorrect 1 of Item 1investments like stocks and bonds. Managers can often take positive actions after the investment has been made to alter a project's cash flows. These opportunities are real options that offer the right but not the obligation to take some future action. Types of real options include abandonment, investment timing, expansion, output flexibility, and input flexibility. The existence of options can -Select-decreaseincreaseneutralizeCorrect 2 of Item 1projects' expected profitability, -Select-decreaseincreaseneutralizeCorrect 3 of Item 1their calculated NPVs, and -Select-decreaseincreaseneutralizeCorrect 4 of Item 1their risk.

The abandonment option is the option to shut down a project if operating cash flows turn out to be lower than expected. To analyze the abandonment option you can draw a decision tree, which is a diagram that lays out different branches that are the result of different decisions made or the result of different economic situations. When analyzing real options you consider the project with and without the option. The option value is calculated as the difference between the expected NPVs with and without the relevant option. (If the value of the project without the option is negative and the NPV of the project with the option is positive, then the option value is simply the calculated NPV of the option.) It is the value that is not accounted for in a traditional NPV analysis and a positive option value expands the firm's opportunities.

Quantitative Problem: Sunshine Smoothies Company (SSC) manufactures and distributes smoothies. SSC is considering the development of a new line of high-protein energy smoothies. SSC's CFO has collected the following information regarding the proposed project, which is expected to last 3 years:

  • The project can be operated at the company's Charleston plant, which is currently vacant.
  • The project will require that the company spend $4.9 million today (t = 0) to purchase additional equipment. For tax purposes the equipment will be depreciated on a straight-line basis over 5 years. Thus, the firm's annual depreciation expense is $4,900,000/5 = $980,000. The company plans to use the equipment for all 3 years of the project. At t = 3 (which is the project's last year of operation), the equipment is expected to be sold for $2,300,000 before taxes.
  • The project will require an increase in net operating working capital of $650,000 at t = 0. The cost of the working capital will be fully recovered at t = 3 (which is the project's last year of operation).
  • Expected high-protein energy smoothie sales are as follows:
    Year Sales
    1 $2,400,000
    2 7,850,000
    3 3,500,000
  • The project's annual operating costs (excluding depreciation) are expected to be 60% of sales.
  • The company's tax rate is 40%.
  • The company is extremely profitable; so if any losses are incurred from the high-protein energy smoothie project they can be used to partially offset taxes paid on the company's other projects. (That is, assume that if there are any tax credits related to this project they can be used in the year they occur.)
  • The project has a WACC = 10.0%.

What is the project's expected NPV and IRR? Do not round intermediate calculations. Round the monetary value to the nearest cent and percentage value to two decimal places.

NPV $
IRR %

Should the firm accept the project?
-Select-The firm should accept the project.The firm should not accept the project.Correct 7 of Item 1

SSC is considering another project: the introduction of a "weight loss" smoothie. The project would require a $3 million investment outlay today (t = 0). The after-tax cash flows would depend on whether the weight loss smoothie is well received by consumers. There is a 40% chance that demand will be good, in which case the project will produce after-tax cash flows of $2.2 million at the end of each of the next 3 years. There is a 60% chance that demand will be poor, in which case the after-tax cash flows will be $0.52 million for 3 years. The project is riskier than the firm's other projects, so it has a WACC of 11%. The firm will know if the project is successful after receiving the cash flows the first year, and after receiving the first year's cash flows it will have the option to abandon the project. If the firm decides to abandon the project the company will not receive any cash flows after t = 1, but it will be able to sell the assets related to the project for $2.8 million after taxes at t = 1. Assuming the company has an option to abandon the project, what is the expected NPV of the project today? Do not round intermediate calculations. Round your answer to two decimal places. Use the values in "millions" to ascertain the answer. Enter your answer in millions. For example, an answer of $10,550,000 should be entered as 10.55.
$   million

Solutions

Expert Solution

Evaluation of high-protein energy smoothies – Calculation of NPV & IRR

Working Notes =

1. The project can be operated at the company's Charleston plant, which is currently vacant. Hence this will be sunk cost and will not be considered in working of NPV & IRR.

2. Year wise cash flow –

3. Working for profit on sale of equipment – On Sale of Equipment company is required to pay tax on profit on sale calculated as below -

4. Calculation of operating profit and net operating cash inflow –

In the first year there is a Net Loss before Tax. Since company is profitable and the loss from the project will be adjusted against the profit from the other business and hence negative tax figure is getting added back in to Net Cash Flow as Cash Inflow.

Answering the question =

1. Calculation of NPV - @ WACC of 10% for the project

Note: Cash Outflows are shown as (negative value) and Cash Inflows as positive value

Hence NPV of the project is $ 250,811.

2. Calculation of IRR –

Note: IRR is the rate at which the PV of all cash inflow = PV of all cash outflow OR IRR is the rate at which NPV become ZERO.

For calculating the IRR we can use the trail & error method by doing following steps –

a. Since NPV is positive the IRR must be greater than the WACC i.e. 10%. So we will try to find range of IRR. We will calculate PV of Cash Inflows @ 12% as per calculation shown in above table which is coming to       $ 8,562. Still NPV is positive, so IRR is bit more than 12%.

NPV @ 12% -

By doing trail & error at different rate slight more than 12 % we can get NPV = 0 @ 12.0731% .

Hence IRR of the project is 12.0731%.

3. Should the firm accept the project?

Yes, company should accept the project because –

a. Project NPV is positive OR

b. Project IRR is more than WACC

Evaluation of "weight loss" smoothie – Calculation of NPV for an option to abandon the project after 1 year

NPV calculation @ WACC of 11%

Since NPV is negative company should not accept the project.

Note: The working capital effect is ignored since not clarified in this part of the question.


Related Solutions

Cash Flow Estimation and Risk Analysis: Real Options DCF analysis doesn't always lead to proper capital...
Cash Flow Estimation and Risk Analysis: Real Options DCF analysis doesn't always lead to proper capital budgeting decisions because capital budgeting projects are not -Select-activepassiverealCorrect 1 of Item 1 investments like stocks and bonds. Managers can often take positive actions after the investment has been made to alter a project's cash flows. These opportunities are real options that offer the right but not the obligation to take some future action. Types of real options include abandonment, investment timing, expansion, output...
Capital budgeting and cash flow analysis
Th e Taylor Mountain Uranium Company currently has annual cash revenues of $1.2 millionand annual cash expenses of $700,000. Depreciation amounts to $200,000 per year.Th ese fi gures are expected to remain constant for the foreseeable future (at least 15 years).Th e fi rm’s marginal tax rate is 40 percent.A new high-speed processing unit costing $1.2 million is being considered as a potentialinvestment designed to increase the fi rm’s output capacity. Th is new piece of equipmentwill have an estimated...
discuss three steps in the capital investment financial analysis: cash flow estimation, project risk assessment, and...
discuss three steps in the capital investment financial analysis: cash flow estimation, project risk assessment, and cost of capital estimation. how might each of these influences a healthcare managers decision to move forward with an investment decision
Capital Budgeting Analysis - Use the information below to prepare for cash flow analysis in a...
Capital Budgeting Analysis - Use the information below to prepare for cash flow analysis in a table for both scenarios Please create your table from Colume L and keep this statement here as it is. You must show the analysis and results from both scenarios based on your cash flow analysis table and make your decision Decision without data support will be given 0 points. Micro-Technologies is a Bio Tech research firm that is conducting research on a cure for...
1. Explain various discounted cash flow (DCF) methods in capital budgeting process! 2. Which method that...
1. Explain various discounted cash flow (DCF) methods in capital budgeting process! 2. Which method that are used in your company to make the investment decision? Give a real example! 3. Discuss the challenges the DCF methods (for example, NPV) usage!
What is traditional capital budgeting analysis? What are its shortcomings? What is real options analysis? What...
What is traditional capital budgeting analysis? What are its shortcomings? What is real options analysis? What are examples of real options? How can simulation be used to study real options in projects?
Consider the following capital budgeting and cash flow estimation problem. You have developed a new energy...
Consider the following capital budgeting and cash flow estimation problem. You have developed a new energy drink that uses various vegetables. The drink is called V-DRINK. You have an existing building that you are using to produce V-DRINK. The building is fully depreciated. You determine a need to buy $400,000 in equipment. Shipping and installation is an additional $50,000. Additionally you determine you will need to have $16,995 in inventory. What is the total initial outlay associated with the project?...
What is usually the largest forecasted cash flow of a capital budgeting analysis? Why
What is usually the largest forecasted cash flow of a capital budgeting analysis? Why
Check for the question with "Cash flows estimation and capital budgeting:" in this test and answer...
Check for the question with "Cash flows estimation and capital budgeting:" in this test and answer the following questions (show your work in details here): a. What is the initial cash outlay? (4 pts.) b. What is the free cash flow for year 1? (4 pts) c. What is the additional Year-3 cash flow (i.e, the after-tax salvage and the return of working capital – also called terminal value)? (4 pt) (please show your work in details and highlight your...
Identify the problems of the discounted cash flow (DCF) analysis for valuing a project and explain...
Identify the problems of the discounted cash flow (DCF) analysis for valuing a project and explain why it is important that real options be identified as part of the risk analysis of new investment.
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT