Question

In: Mechanical Engineering

What are the main engineering constraints to consider for Aluminum machining (milling and drilling) ?

What are the main engineering constraints to consider for Aluminum machining (milling and drilling) ?

Solutions

Expert Solution

One of the biggest problems in aluminum cutting is the Built Up Edge. The built up edge is a welding of workpiece material to the tool edge that commonly occurs on soft, workpiece materials and the loss of effective geometry causes increases in cutting forces and quality problems.

The problems caused by the built up edge are

(1)scratchesin the surface

(2) and cloudy finish,

both increasing the rugosity dramatically and compromising the finish visual.

Eventually a small piece of the built up edge unties and it takes a bit of the tool, leading to the tool breakage.

A few simple constraints can be taken to minimize the built up edge:

  • Higher cutting speed;
  • PVD (Phisical Vapor Deposition) coatings;
  • Polished edges;
  • Abundant coolant (reducing the temperature in the tool edge, preventing the workpiece welding);
  • Non-honed tool edges (keen edges preferable).

Related Solutions

Evaluation of an engineering project involves the following constraints ?
Evaluation of an engineering project involves the following constraints ?A) financial, environmental, social and political constraints.B) technical and financial constraints.C) technological and social constraints.D) time and money constraints. E) budget and time constraints.
Differentiate turning, milling, and drilling in terms of (i) purpose, (ii) feed stock geometry, and (iii)...
Differentiate turning, milling, and drilling in terms of (i) purpose, (ii) feed stock geometry, and (iii) orientation and direction of motion of tool with respect to part.
Consider a project to build an amusement park. What are some of theresource constraints that...
Consider a project to build an amusement park. What are some of the resource constraints that would make this project challenging? What could you do, as a project manager, to help manage the constraints and project scheduling?
Discuss the role of ceramics in biomedical engineering. What are the main advantages and drawbacks of...
Discuss the role of ceramics in biomedical engineering. What are the main advantages and drawbacks of using ceramics (bulk oxides and coatings) as bio-ceramics? Describe bioactive glasses and discuss their limitations along with differences between ordered and disordered glasses
1. a What are the main activities in software requirements engineering? b.Why is it important to...
1. a What are the main activities in software requirements engineering? b.Why is it important to document the software requirements clearly? c. What do we represent in use cases? d. How do we represent the software requirements? Answer this questions in your words please.Thanks you. e. What diagrams can be used to elaborate the use cases?
Discuss ways in which the constraints on possible solutions to an engineering design problem arise.
Discuss ways in which the constraints on possible solutions to an engineering design problem arise.
(a) What is the difference between turning and milling? What is the difference between peripheral milling...
(a) What is the difference between turning and milling? What is the difference between peripheral milling (slab milling) and face milling? (b) What are the main parameters in describing the profile of a thread? How to cut threads on a lathe? (c) Describe the differences between electrochemical machining (ECM) and elctrodischarge machining (EDM).
Describe the three main concerns of genetic engineering? According to the textbook, what was the did...
Describe the three main concerns of genetic engineering? According to the textbook, what was the did the program implemented by the Indian health Service do between 1972 and 1976?
Tank Corp has on support . engineering services and two production departments, Machining and assembling. The...
Tank Corp has on support . engineering services and two production departments, Machining and assembling. The following data relate to the 2017 budget for the Engineering Services? Departmen Practical capacity 9500 hours Fixed costs of the Engineering Services Department in the 6500 labor-hour to 9500 labor-hour relevant range $285,000 Budgeted usage (quantity) of engineering services labor- hours required to support the productions departments: Machining department 2,500 hours Assembly department 5000 hours Total 75,000 hours Budgeted variable cost per engineering services...
A production facility produces aluminum tubes through several steps that include machining, washing, removing dirt and...
A production facility produces aluminum tubes through several steps that include machining, washing, removing dirt and oils and bushing pressing. These tubes are then sold to an assembly facility to be used in axle production. Several types of defects are present while producing these tubes. The following table shows some defect types and their numbers. Data is also available Defect Type Number of Defects Mis-location 63 Miscellaneous 30 Bushing depth 19 Two bearings in a tube 9 Machine adjustment 7...