In: Accounting
Puget World, Inc., manufactures two models of television sets, the N 800 XL model and the N 500 model. Data regarding the two products follow: |
Direct Labor- Hours per Unit |
Annual Production | Total Direct Labor-Hours |
|
Model N 800 XL | 2.5 | 3,500 units | 8,750 |
Model N 500 | 1.3 | 12,500 units | 16,250 |
25,000 | |||
Additional information about the company follows: |
a. |
Model N 800 XL requires $65 in direct materials per unit, and Model N 500 requires $25. |
b. | The direct labor wage rate is $16 per hour. |
c. |
The company has always used direct labor-hours as the base for applying manufacturing overhead cost to products. |
d. |
Model N 800 XL is more complex to manufacture than Model N 500 and requires the use of special equipment. Consequently, the company is considering the use of activity-based costing to assign manufacturing overhead cost to products. Three activity cost pools have been identified as follows: |
Activity Cost Pool | Activity Measure |
Estimated Overhead Cost |
|
Machine setups | Number of setups | $ | 510,000 |
Special processing | Machine-hours | 230,000 | |
General factory | Direct labor-hours | 1,410,000 | |
$ | 2,150,000 | ||
Expected Activity |
|||
Activity Measure | Model N 800 XL | Model N 500 | Total |
Number of setups | 200 | 300 | 500 |
Machine-hours | 20,000 | 0 | 20,000 |
Direct labor-hours | 8,750 | 16,250 | 25,000 |
Required information
Required: |
1. |
Assume that the company continues to use direct labor-hours as the base for applying overhead cost to products. |
a. | Compute the predetermined overhead rate. (Round your answer to 2 decimal places.) |
b. | Compute the unit product cost of each model. (Round your answers to 2 decimal places.) |
Required information
2. |
Assume that the company decides to use activity-based costing to assign manufacturing overhead cost to products. |
a(1) |
Compute the activity rate for each activity cost pool. (Round your answers to 2 decimal places.) |
a(2) |
Determine the amount of overhead cost that would be assigned to each model using the activity-based costing system. (Round your answers to 2 decimal places.) |
b. |
Compute the unit product cost of each model. (Round your answers to 2 decimal places.) |