Question

In: Operations Management

Process Control at Polaroid (A) 1. Create and interpret SPC charts – Xbar and R charts...

Process Control at Polaroid (A)

1. Create and interpret SPC charts – Xbar and R charts for each work shift for finger height and pod weight. (provide step by step instructions on how you came up with the XBar, R, R bar, X double bar, UCL, and LCL)

Pod Weight (grams)
Sample Number:
Day Shift 1 2 3 4 5 6
3 August A 2.800 2.799 2.760 2.802 2.805 2.803
B 2.750 2.820 2.850 2.740 2.850 2.790
C 2.768 2.807 2.807 2.804 2.804 2.803
4 August A 2.841 2.802 2.802 2.806 2.807 2.807
B 2.801 2.770 2.833 2.770 2.840 2.741
C 2.778 2.807 2.804 2.804 2.803 2.804
5 August A 2.760 2.804 2.804 2.806 2.805 2.806
B 2.829 2.804 2.805 2.806 2.807 2.807
C 2.741 2.850 2.744 2.766 2.767 2.808
6 August A 2.814 2.804 2.803 2.805 2.807 2.804
B 2.787 2.802 2.805 2.804 2.805 2.804
C 2.766 2.805 2.804 2.802 2.804 2.806
7 August A 2.774 2.801 2.805 2.805 2.805 2.804
B 2.770 2.801 2.833 2.770 2.840 2.741
C 2.832 2.836 2.794 2.843 2.813 2.743
10 August A 2.829 2.846 2.760 2.854 2.817 2.805
B 2.850 2.804 2.805 2.806 2.807 2.807
C 2.803 2.803 2.773 2.837 2.808 2.808
11 August A 2.815 2.804 2.803 2.804 2.803 2.802
B 2.782 2.806 2.806 2.804 2.803 2.802
C 2.779 2.807 2.808 2.803 2.803 2.803
12 August A 2.815 2.815 2.803 2.864 2.834 2.803
B 2.846 2.854 2.760 2.829 2.817 2.805
C 2.767 2.804 2.834 2.803 2.803 2.803
13 August A 2.850 2.804 2.804 2.804 2.804 2.804
B 2.810 2.820 2.814 2.794 2.798 2.787
C 2.850 2.820 2.750 2.740 2.850 2.790
14 August A 2.750 2.765 2.850 2.760 2.790 2.840
B 2.830 2.770 2.848 2.760 2.750 2.830
C 2.740 2.770 2.833 2.770 2.840 2.800
17 August A 2.753 2.807 2.805 2.804 2.802 2.804
B 2.851 2.751 2.752 2.773 2.849 2.806
C 2.845 2.804 2.803 2.806 2.805 2.806
18 August A 2.844 2.777 2.754 2.791 2.833 2.811
B 2.806 2.839 2.805 2.804 2.850 2.740
C 2.849 2.801 2.804 2.762 2.814 2.791
19 August A 2.820 2.793 2.812 2.833 2.853 2.812
B 2.790 2.780 2.764 2.843 2.843 2.818
C 2.850 2.806 2.805 2.814 2.807 2.807
20 August A 2.767 2.831 2.808 2.793 2.836 2.811
B 2.833 2.825 2.793 2.813 2.823 2.766
C 2.824 2.799 2.790 2.764 2.817 2.805
21 August A 2.778 2.775 2.799 2.805 2.833 2.772
B 2.801 2.832 2.758 2.759 2.773 2.814
C 2.770 2.787 2.744 2.766 2.807 2.803
Finger Height (mm)
Sample Number:
Day Shift 1 2 3 4 5 6
3 August A 1.90 1.95 1.94 2.00 2.05 2.16
B 2.15 2.17 2.11 2.13 2.02 2.03
C 1.73 1.90 2.07 1.89 1.76 1.88
4 August A 2.30 2.41 2.54 2.37 2.32 2.16
B 2.28 2.16 2.19 2.08 2.25 2.24
C 1.92 2.24 2.11 1.89 1.88 2.17
5 August A 2.39 2.28 2.10 2.36 2.54 2.25
B 2.11 2.21 2.24 2.21 2.17 2.24
C 1.89 1.90 1.73 2.07 1.89 1.76
6 August A 2.51 2.25 2.08 2.35 2.29 2.32
B 2.22 2.19 2.22 2.24 2.01 2.23
C 1.89 1.90 1.78 2.07 1.89 1.76
7 August A 1.95 2.07 2.25 1.95 2.11 2.16
B 2.08 2.03 2.27 2.23 2.24 2.13
C 2.31 1.90 1.86 1.91 1.89 1.87
10 August A 2.23 2.25 2.21 1.89 2.15 2.11
B 2.23 2.21 2.05 2.19 2.07 2.16
C 1.73 2.00 1.79 1.75 1.84 1.74
11 August A 2.21 2.11 2.21 2.44 2.17 2.30
B 2.17 2.19 2.15 2.04 2.07 2.22
C 2.01 1.90 1.90 1.81 2.06 1.89
12 August A 2.08 2.19 2.28 2.29 2.21 2.45
B 1.93 2.09 1.90 1.95 2.04 2.09
C 1.84 2.12 1.90 1.89 2.01 1.75
13 August A 2.23 2.01 2.25 2.11 2.39 2.15
B 2.19 2.22 2.18 2.15 2.23 2.04
C 1.96 2.05 2.16 1.87 2.13 1.90
14 August A 2.27 2.00 2.06 1.97 2.13 2.05
B 1.92 1.78 1.76 1.77 1.78 1.87
C 1.78 1.65 2.04 1.63 1.75 1.83
17 August A 2.31 2.35 2.25 1.99 2.27 2.11
B 2.02 1.97 1.81 1.73 1.77 1.82
C 1.76 1.91 2.01 1.85 1.78 1.64
18 August A 2.06 2.14 1.91 2.06 2.08 2.09
B 1.76 1.83 1.79 1.79 1.77 1.94
C 2.25 1.88 2.11 2.18 2.02 1.86
19 August A 2.28 2.15 2.17 2.18 2.44 2.00
B 2.31 2.27 2.16 2.10 2.24 2.28
C 1.87 1.89 2.03 1.69 1.75 2.04
20 August A 2.16 2.38 2.20 2.25 1.98 2.23
B 2.06 2.08 2.14 2.24 2.26 2.18
C 1.80 1.71 1.65 1.68 1.96 2.05
21 August A 1.75 2.00 2.04 2.00 2.15 2.06
B 1.90 1.90 1.81 1.86 1.98 1.81
C 1.80 2.01 1.73 1.89 2.01 1.91

Solutions

Expert Solution

Pod weight:

Sample size (n) = 6
A2 = 0.483 (from table)
D3 = 0 (from table)
D4 = 2.004 (from table)

X-bar chart:

UCLx = X_double-bar + A2 * R-bar = 2.8025 + 0.483*0.064 = 2.8334
CLx = X_double-bar = 2.8025
LCLx = X_double-bar - A2 * R-bar = 2.8025 - 0.483*0.064 = 2.7716

Interpretation - the process is in statistical control.

R-chart:

UCLr = D4 * R-bar = 2.004*0.064 = 0.1283
CLr = R-bar = 0.064
LCLr = D3 * R-bar = 0*0.064 = 0.00

The process is in statistical control.

------------------------------

Finger height:

Sample size (n) = 6
A2 = 0.483 (from table)
D3 = 0 (from table)
D4 = 2.004 (from table)

X-bar chart:

UCLx = X_double-bar + A2 * R-bar = 2.0487 + 0.483*0.2991 = 2.1932
CLx = X_double-bar = 2.0487
LCLx = X_double-bar - A2 * R-bar = 2.0487 - 0.483*0.2991 = 1.9043

The process is not in control.

R-chart:

UCLr = D4 * R-bar = 2.004*0.2991 = 0.5994
CLr = R-bar = 0.2991
LCLr = D3 * R-bar = 0*0.2991 = 0.00

--------------------


Related Solutions

3. SPC and Control Charts (10 Marks) Define what SPC stands for and means. Outline the...
3. SPC and Control Charts Define what SPC stands for and means. Outline the five (5) key steps for setting up a control chart and monitoring a process Name the chart type and list the chart(s) and formula(s) for one (1) control chart for Variable Data and one (1) type for Attribute Data. Explain and list the case characteristics that describe when you would use the chart types named and listed in part (c) Sketch and fully label all the...
In quality control, statistical process control (SPC ) is often employed to analyze the process capability...
In quality control, statistical process control (SPC ) is often employed to analyze the process capability in manufacturing or service operations. Explain the following with an example each : What is a p chart  ? What is a c chart ? There are 3 machines in your factory which can produce a ruler. The rulers as produced has a spread in length between 12.5 thru 12.4 inch. The standard deviation of the 3 machines are * 0.15 * 0.09 * 0.13...
In quality control, statistical process control (SPC ) is often employed to analyze the process capability...
In quality control, statistical process control (SPC ) is often employed to analyze the process capability in manufacturing or service operations. Explain the following with an example each : What is a p chart  ? What is a c chart ? There are 3 machines in your factory which can produce a ruler. The rulers as produced has a spread in length between 12.5 thru 12.4 inch. Given the standard deviation of the 3 machines are as follows, calculate the process...
What is Statistical process control (SPC) key element?
What is Statistical process control (SPC) key element?
A company manufacturing oil seals wants to establish x and R control charts on the process....
A company manufacturing oil seals wants to establish x and R control charts on the process. There are 25 preliminary samples of size 5 on the internal diameter of the seal. The summary data (in mm) are as follows: 6.1. A manufacturer of components for automobile transmissions wants to use control charts to monitor a process producing a shaft. The resulting data from 20 samples of 4 shaft diameters that have been measured are: 20 ∑ xi = 10.275, i=1...
Discuss with examples Type-I and Type-II errors relative to the SPC theory of control charts. What...
Discuss with examples Type-I and Type-II errors relative to the SPC theory of control charts. What practical implication in terms of process operation do these two types of errors have?
Explain management's role and the importance of it in the implementation of statistical process control (SPC)....
Explain management's role and the importance of it in the implementation of statistical process control (SPC). COURSE: QUALITY MANAGEMENT CONTROL
The following xbar and s charts based on n=4 have shown statistical control: Xba Chart: UCL=710,...
The following xbar and s charts based on n=4 have shown statistical control: Xba Chart: UCL=710, CL=700, LCL=690, s chart- UCL=18.08, CL=7.979, LCL=0, A)Estimate the process parameters mean and sigma (standard deviation). B)If the specifications are at 705+/-15, and the process output is normally distributed, estimate the fraction non conforming. C)For the Xbar chart, find the probability of a type I error, assuming sigma is constant. D)Suppose the process mean shifts to 693 and the standard deviation simulatneously shifts to...
x bar and R control Charts A quality control inspector at the Company B has taken...
x bar and R control Charts A quality control inspector at the Company B has taken twenty-five samples with four observations each of the sample weight (g). The data are shown in the table. Construct x bar and R control charts for these data. Identify any out-of- control points. Assume these points (if any) are assignable. Remove them and recalculate the control limits. Construct the revised x bar and R control charts. Submit data (spreadsheet) and charts. Comment on the...
Define the concept of statistical process control Explain briefly the rationale for SPC What is meant...
Define the concept of statistical process control Explain briefly the rationale for SPC What is meant by variation in processes? Describe how the seven tools are used when implementing SPC.