Question

In: Statistics and Probability

x bar and R control Charts A quality control inspector at the Company B has taken...

  1. x bar and R control Charts

A quality control inspector at the Company B has taken twenty-five samples with four observations each of the sample weight (g). The data are shown in the table. Construct x bar and R control charts for these data. Identify any out-of- control points. Assume these points (if any) are assignable. Remove them and recalculate the control limits. Construct the revised x bar and R control charts. Submit data (spreadsheet) and charts.

Comment on the validity of the revised chart?

Sample

Weight in g

X1

X2

X3

X4

1

32

36

33

35

2

36

31

35

34

3

30

32

31

33

4

29

34

38

32

5

32

37

36

33

6

35

38

43

37

7

30

37

35

33

8

29

33

28

31

9

31

33

33

32

10

35

29

35

31

11

36

40

32

31

12

33

30

29

35

13

33

30

34

34

14

35

37

36

41

15

33

35

37

30

16

31

33

34

36

17

29

34

30

37

18

34

32

34

30

19

36

35

33

31

20

33

31

33

31

21

29

32

37

33

22

30

30

29

31

23

33

32

35

30

24

36

34

31

33

25

34

35

30

30

Solutions

Expert Solution


Related Solutions

Discuss the purposes and differences between the C- charts, p-charts and X-bar and R charts. 2....
Discuss the purposes and differences between the C- charts, p-charts and X-bar and R charts. 2. Define Cp and Cpk 3. The capability index allows for some drifting of the process mean. Discuss what this means in terms of product quality output.
A quality control inspector has taken four samples with five observations each at the Beautiful Shampoo...
A quality control inspector has taken four samples with five observations each at the Beautiful Shampoo Company, measuring the volume of shampoo per bottle. If the average range for the four samples is 0.4 ounces and the average mean of the observations is 20.0 ounces, develop 3-sigma control limits for the bottling operation. (Round answers to 2 decimal places, e.g. 15.25.) CL UCL LCL
A company manufacturing oil seals wants to establish x and R control charts on the process....
A company manufacturing oil seals wants to establish x and R control charts on the process. There are 25 preliminary samples of size 5 on the internal diameter of the seal. The summary data (in mm) are as follows: 6.1. A manufacturer of components for automobile transmissions wants to use control charts to monitor a process producing a shaft. The resulting data from 20 samples of 4 shaft diameters that have been measured are: 20 ∑ xi = 10.275, i=1...
2. A pharmacy is using X bar and R charts to record the time it takes...
2. A pharmacy is using X bar and R charts to record the time it takes to fill a prescription after the customer has turned in or called in the prescription. Each day, the pharmacy records the times it takes to fill six prescriptions. During a 30-day period, the hospital obtained the following values: X double bar = 20 minutes; R bar = 4 minutes. The upper and lower specifications are 23 minutes and 13 minutes respectively. What is the...
1. A pharmacy is using X bar and R charts to record the time it takes...
1. A pharmacy is using X bar and R charts to record the time it takes to fill a prescription after the customer has turned in or called in the prescription. Each day, the pharmacy records the times it takes to fill six prescriptions. During a 30-day period, the hospital obtained the following values: X double bar = 20 minutes; R bar = 4 minutes. The upper and lower specifications are 23 minutes and 13 minutes respectively. What is the...
A large bank established X-Bar and R charts for the time required to process applications for...
A large bank established X-Bar and R charts for the time required to process applications for its charge cards. A sample of five applications is taken each day. The first four weeks (20 days) of data give: X bar bar = 16 min s bar = 3 min R bar = 7 min Based on the values given, calculate the centerline and control limits for the X bar and R charts.
Use the attached file to make the appropriate x-bar and R charts. You must include the...
Use the attached file to make the appropriate x-bar and R charts. You must include the data points, center line, upper and lower control limits. (Remember, only the data points should NOT be a straight line.) MEAN CI x-bar (Grand Mean) LCL x-bar (CI-A2*R-bar) UCL x-bar (CI+A2*R-bar) Sample Range (Max-Min) R-bar (Mean) UCL R (R-bar*D4) 1 12.00 12.50 12.47 12.78 13.00 2 12.78 11.18 11.92 11.95 11.86 3 13.30 13.00 12.95 12.98 13.32 4 11.29 12.87 12.53 11.42 12.37 5...
A production process is checked periodically by a quality control inspector. The inspector selects simple random...
A production process is checked periodically by a quality control inspector. The inspector selects simple random samples of 50 finished products and computes the sample mean product weights x. If test results over a long period of time show that 5% of the x values are over 4.1 pounds and 5% are under 3.9 pounds, what is the standard deviation (in lb) for the population of products produced with this process? (Round your answer for the standard deviation to two...
A tomato farmer has been using an X-bar and R chart to control the yield per...
A tomato farmer has been using an X-bar and R chart to control the yield per plant on her highly-mechanized farm. The yield is table over time in both variability and location. The X-bar chart has a centerline value of 10.50 pounds and the upper control limit is 14.20 pounds. Find the value of the lower control limit of the X-bar chart? Find the value of the upper and lower one-sigma and two-sigma zones of the X-bar chart? Find the...
Use the data in the table below to set up short-run X-bar and R charts using...
Use the data in the table below to set up short-run X-bar and R charts using the DNOM approach. The nominal dimensions for each part are TA = 50, TB = 75, TC = 60, TD = 100, and TE = 125. Sample Part M1 M2 M3 1 A 51 50 51 2 A 48 50 52 3 A 50 52 48 4 A 49 51 54 5 A 47 45 52 6 A 49 50 51 7 B 73...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT