A company manufacturing oil seals wants to establish x and R
control charts on the process. There are 25 preliminary samples of
size 5 on the internal diameter of the seal. The summary data (in
mm) are as follows:
6.1.
A manufacturer of components for automobile transmissions
wants to use control charts to monitor a process producing a shaft.
The resulting data from 20 samples of 4 shaft diameters that have
been measured are:
20
∑ xi = 10.275, i=1
20
∑ Ri = 1.012 i=1
Subgroup x R
1 8.3 2
2 8.1 3
3 7.9 1
4 6.3 5
5 8.5 3
6 7.5 4
7 8.0 3
8 7.4 2
9 6.4 2
10 7.5 4
Subgroup x R
11 8.8 3
12 9.1 5
13 5.9 3
14 9.0 6
15 6.4 3
16 7.3 3
17 5.3 2
18 7.6 4
19 8.1 3
20 8.0 2
(a) Find the control limits that should be used on the x and R
control charts.
the 20 preliminary samples plot in
25
∑ xi = 1,253.75, i=1
25
∑ Ri = 14.08 i=1
(b) Plot the preliminary data from the first 20 samples on the
control charts that you set up in part (a). Is this process in
statistical control?
6.6. Components used in a cellular telephone are manu-
factured with nominal dimension of 0.3 mm and lower and upper
specification limits of 0.295 mm and 0.305 mm respectively. The x
and R control charts for this process are based on subgroups of
size 3 and they exhibit statistical control, with the center line
on the x chart at 0.3015 mm and the cen- ter line on the R chart at
0.00154 mm.
(a) Estimate the mean and standard deviation of this
process.
(b) Suppose that parts below the lower specifica- tion limits
can be reworked, but parts above the upper specification limit must
be scrapped. Estimate the proportion of scrap and rework produced
by this process.
(c) Suppose that the mean of this process can be reset by
fairly simple adjustments. What value of the process mean would you
recommend? Estimate the proportion of scrap and rework produced by
the process at this new mean.
6.7. The data shown in Table 6E.2 are x and R values for 24
samples of size n = 5 taken from a process produc- ing bearings.
The measurements are made on the
(a) Find the control limits that should be used on the x and R
control charts.
(b) Assume that the 25 preliminary samples plot in control on
both charts. Estimate the process mean and standard
deviation.