Question

In: Operations Management

Question You are within two weeks of turnover of a three-story build-to-suit office building project. Many...

Question

You are within two weeks of turnover of a three-story build-to-suit office building project. Many of the city inspections are complete and it appears that a certificate of occupancy (C of O) will be obtained on time. Only the fire protection, elevator, and life safety inspections remain. The mechanical, electrical, fire protection and life safety were all design-build systems. During the punch list, it is discovered that the fire protection subcontractor has installed a different type of sprinkler head on each floor. The first floor uses concealed heads with white escutcheons to match the ceiling tiles. The second floor uses decorative chrome heads. The subcontractor installed semi-recessed heads on the third floor. This was not picked up prior as a person cannot physically see more than one floor at a time. The client is very upset. Questions: 1. Can you require the subcontractor to change them all out now? 2. Would this be a good move given the status of the inspections? 3. Who is responsible to check and approve the shop drawings and submittals for design-build subcontractors? 4. What should the general Contractor have done to prevent this from happening? 5. What can you do now?

Solutions

Expert Solution

Since there was a demand for a different type of sprinklers to be installed. So, I can force the subcontractor to change the sprinkler system. Also, it is only one the floor that requires to be changed. So, it won't take much of the time to change it. So, yes, I can require the contractor to change it now.

A more good move would be to somehow change those sprinklers to a more decorative item rather than just as a functional measure. This would make the same thing a more decorative item and also might make the client happy about it.

The architecture and design department is responsible for the drawings and submittals for design-build contractors. Also, the procurement team is responsible for sourcing such firms who can fulfill the same.

The general contractors should have checked everything and ensured that the fixtures are of the exact model before fixing them. They should also have invited the client for a round of inspection and ask opinion about the current ongoing work to ensure the smooth implementation process.


Related Solutions

Beavis Construction Company was the low bidder on a construction project to build an office building...
Beavis Construction Company was the low bidder on a construction project to build an office building for $8,000,000. The project was begun in 2017 and completed in 2019. Cost and other data are presented below: 2017 2018 2019 Costs incurred during the year $ 1,500,000 $4,500,000 $1,550,000 Estimated costs to complete 4,500,000 1,500,000 -0- Billings during the year 1,400,000 5,200,000 1,400,000 Cash collections during the year 1,000,000 4,000,000 3,000,000 Assume that Beavis recognizes revenue on this contract over time according...
You are the new CM for a 2 story OFFICE building that is lagging behind by...
You are the new CM for a 2 story OFFICE building that is lagging behind by the following: Wall framing in upper floor is incomplete and needs 2 more days to complete. Doors for installation first floor have not been delivered. Painting contractor crew cannot start painting since floor is not clear of debris ect. Foreman has left due to family emergency. Electrical contractor is 3 days behind. Give your interpretation of how you will approach this situation and provide...
The Young Company enters into a long-term project to build a new office building. The Contract...
The Young Company enters into a long-term project to build a new office building. The Contract price is $9,000,000 and Young expects to complete the project in three years. Young gives you the following information for the first two years regarding the project: 2017 2018 Actual costs incurred during year 2,400,000 3,800,000 Estimated costs to complete at as of December 31: 5,100,000 3,000,000 Amounts billed to customer 2,800,000 4,100,000 Collections from customer 2,600,000 3,400,000 Required: 1.    Prepare the journal entries...
You are field manager for the general contractor on a multi-story office building under construction. The...
You are field manager for the general contractor on a multi-story office building under construction. The project has risen all 15 floors above the foundation. The roof is on and the exterior façade of the structure, consisting of alternating blue glass ribbon windows and red granite panels, has “dried in” the project many weeks ago. On the third, seventh and fifteenth floors, the executive offices located on the corners of the building have blue glass doors that lead outside to...
A large, two-story office building has a first floor which measures 500 ft by 750 ft...
A large, two-story office building has a first floor which measures 500 ft by 750 ft and a second story which is 500 ft by 500 ft. This building used 76,650 GWh of electricity last year and 120,035 therms of natural gas. a) What is the EUI of the building? How does this compare to similar buildings? b) Currently the office encourages carpooling and public transportation and therefore does not have a parking structure attached. They are considering adding this...
You are a project manager at a construction company that specializes in building office buildings. You...
You are a project manager at a construction company that specializes in building office buildings. You were approached by a representative of a company that was interested in your company’s services. He told you that their company was growing and they decided to build a new office building to address their needs. Then he told you that they already started the process with another construction company. They signed a contract with the other construction company and they started the building...
The property you are appraising is a five-story office building. Each floor has 10,000 square feet...
The property you are appraising is a five-story office building. Each floor has 10,000 square feet of rentable space and is suitable for single occupancy. Two tenants have leases. Floor 3 is occupied under a five-year lease with three years remaining. The current rental is $128,600 per year. Floor 4 is occupied under a new five-year lease and the rent is $150,000 per year. Floors 1, 2, and 5 are vacant. The rent being paid for the fourth floor is...
The Sun Top Nursing Home is currently a 100-bed facility located in a two-story building. Due to demand, two additional two-story buildings will be opening within the next two years.
The Sun Top Nursing Home is currently a 100-bed facility located in a two-story building. Due to demand, two additional two-story buildings will be opening within the next two years. When completed, the units will be 1North, 2 North, 1 East, 2 East, 1 West, and 2 West. The chief nursing officer /director of quality improvement is concerned that as the facility expands, the Centers for Medicare & Medicaid Services (CMS) Long Stay Quality Measures results will reflect negatively upon...
Question: PROJECT 2 – ATM MACHINE For this project you will be building an ATM application...
Question: PROJECT 2 – ATM MACHINE For this project you will be building an ATM application that will allow ... PROJECT 2 – ATM MACHINE For this project you will be building an ATM application that will allow users to log in, deposit, withdraw, and check balance. Set a default beginning balance of $1000. I want all monies formatted to currency. Log in Usernames and passwords need to be stored in parallel arrays. At least three logins available for me....
The ZMH Company has two divisions, Corporate Office Systems and Home Office Systems. You are building...
The ZMH Company has two divisions, Corporate Office Systems and Home Office Systems. You are building the budget for Home Office Systems. The forecast included 2019 year's sales of $35,000,000. There was a common sales team for both devisions. 35% of the sales team would be dedicated to Home Office Systems. Sales reps for Home Office would earn a 20% commission on sales of Home Office Systems. Home Office Systems would be charged for 35% of the fixed direct costs...
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT