Given the following information set up the problem in a transportation table and solve for the minimum-cost plan:
PERIOD 1 2 3 Demand 550 700 750
Capacity Regular 500 500 440
Overtime 50 50 50
Subcontract 120 120 100
Beginning inventory 100
Costs Regular time $ 60 per unit
Overtime $ 80 per unit
Subcontract $ 90 per unit
Inventory carrying cost $ 1 per unit
per period Back-order cost $ 3 per unit per period
Suppose that an inventory carrying cost is increased to $2 per unit per period. What will the additional cost of the optimal plan be? (Omit the "$" sign in your response.)
Additional cost $
Formulas:
K12 =SUM(H12:J12) copy to K12:K20
H21 =SUM(H12:H20) copy to H21:J21
K9 =SUMPRODUCT(B12:D20,H12:J20)
Total cost of plan = $ 126,650
With inventory carrying cost of $ 2 , the revised plan is as follows:
Additional cost = 127000 - 126650 = $ 350