Question

In: Civil Engineering

following your inspection of the off track environment, produce a short inspection report (min 400 words)...

following your inspection of the off track environment, produce a short inspection report (min 400 words) which details your findings and explain the process for drainage inspections.
describe methods applied for the maintenance of track alignment

Describe the methods applied for the maintenance of track formation

Solutions

Expert Solution

To maintain the track's drainage inspection, the following methods have to use:

i) Inspect all side drains, catch water drains should be clear.

ii) It is to be ensured that the rain water should not deposited on bridge or culverts that creates obstruction. The plastics or any harmful spoilers should not be deposited in the side drains or catch water drains that obstructed the drainage of outfall water.

iii) Every Junior Engineer or Assistant Engineer should check the drains before the monsoon as it is clear or not.

iv) Besides all these, if anytime in monsoon there will excess rainfall, motor pump should be present to clear the water as soon as possible to the nearer water bodies or any field .

✓✓ Methods applied for maintanance of track alignment:

The important and most widely methods of maintanance of track alignment or track geometry is Tamping, in which tampers are used for day to day requirements.It is more economical, high speedy and effective work. Tamping is mainly two types, i.e On track tping and off track tamping.

In Off track tamping, portable machines are used and to the opposite side of the sleepers below the rail to check the maximum consolidstion of ballast. In this process, there is no traffic blockage condition , but in this process need more man powee for the portable machines.

In On track tamping, self proppelled vehicles are used to give the loads on the sleepers automatically and to check consolidation of ballast..It is most effective work.

✓✓ Methods applied for maintannce of track formation:

i) The rails and sleepers should be placed on a subgrade soil which has high strength to hold the entire formation.

ii) the sub base layer must be permeable enough to drain the rain water, otherwise it affects on the rails and sleepers.

iii) The joints of sleepers and rails should be inspect once in a week it is under permissble limit or not, otherwise the bolts may be tightened by the jacks.

iv) The roughness of the rails maybe inspected.


Related Solutions

Assessment 11.0: Welding processes Produce a short report with diagrams (min 300 words) on the jointing...
Assessment 11.0: Welding processes Produce a short report with diagrams (min 300 words) on the jointing of rail using welding techniques including: • Alumino-thermic • Flash butt welding if you know the answer could you write it in text as I don't understand the handwriting
In your own words, write a short business report (400-500 words) about Alibaba Group future plans...
In your own words, write a short business report (400-500 words) about Alibaba Group future plans for Internet profit.
In your own words, write a short business report (400-500 words) about Alibaba Group business model.
In your own words, write a short business report (400-500 words) about Alibaba Group business model.
In your own words, write a short business report (400-500 words) about Alibaba Group business model?
In your own words, write a short business report (400-500 words) about Alibaba Group business model?
produce a (250 words min) report that describes thedifferent stages o the signaling design process...
produce a (250 words min) report that describes the different stages o the signaling design process an how the information provided by signalling design is used by installation maintaince and/or testing
Produce a report detailing the planning process for an OLE construction activity (min 600 words), using...
Produce a report detailing the planning process for an OLE construction activity (min 600 words), using a recent work as the basis for the report. The report should detail the following: • Strategic planning process for engineering possessions • Planning of engineer’s trains and on track plant • Ordering and supply of materials • Manpower requirements • Road rail machines requirements • Possession arrangements • On track plant detailed plans • Interface with other engineering functions • Isolation of Traction...
produce a report (300 words min) which identifies the requirements for drainage within the railway infrastructure...
produce a report (300 words min) which identifies the requirements for drainage within the railway infrastructure and the methods of achieving adequate drainage. use a section of track as an example and illustrate your report with photographs and drawings as appropriate. explain the common failure modes associated with track drainage.
Assessment 4.0: Management of Quality Produce a report (min 300 words) detailing construction methodology and the...
Assessment 4.0: Management of Quality Produce a report (min 300 words) detailing construction methodology and the process for the management of quality of installation and progress reporting for either of the following: Plain line track renewals S&C Installation Include in the report an outline the management of quality of high output techniques for the following: Plain line track renewals Ballast cleaning S&C Modular Installation methods Also include the management of quality of track renewals process for special circumstances including: Tunnels...
Assessment 9.0: Hand back process Produce a report (min 250 words) to detail the hand back...
Assessment 9.0: Hand back process Produce a report (min 250 words) to detail the hand back process as defined by the Infrastructure Controller, and detail the factors that should be considered as part of the hand back process including the potential areas for special consideration which should be confirmed. Detail the requirements for maintenance records which form part of the hand back process. Write it in text if you know the answer as I don't understand the handwriting
Assessment 5.0: Hand back process Produce a report (min 300 words) to detail the hand back...
Assessment 5.0: Hand back process Produce a report (min 300 words) to detail the hand back process as defined by the infrastructure controller and detail the factors that should be considered as part of the hand back process including the potential areas for special consideration which should be confirmed. Detail the requirements for construction records which form part of the hand back process. The assets will be handed-back to the procuring authority at contract expiration. It is good practice to...