Question

In: Civil Engineering

General Manager at the Council is considering awarding your team to a new project in Altona...

General Manager at the Council is considering awarding your team to a new project in Altona North.
The General Manager has invited you to submit a report describing some key items relating to how you
would manage the construction activities. Your report needs to include at least the requirements
below.

a)project monitoring and control

b)project quality

c)project safety

Solutions

Expert Solution

Project Monitoring & Control Process

  • Evaluation and comparison of actual measured results against those planned is the fundamental principle of project monitoring process.
  • Whenever there is a variance, corrective action is required to keep the project on schedule and to budget.
  • The inputs are the project plan and progress reports that contain data collected from the project team.
  • Where progress deviates significantly, and this usually means outside of a predetermined tolerance limit, it is important to identify the underlying causes and take corrective action.
  • Monitoring Process (on a regular basis)

  • Collect.
    • Get the data about the current status of your project.
  • Measure and Compare.
    • Compare with baseline plan, highlight any deviation, make a projection based on current data.
  • Assess and Re-plan.
    • Decide whether corrective actions are necessary.
    • If so, plan, document, and take the corrective actions.
    • Monitoring and controlling activities
  • Involves tracking, reviewing, and regulating project progress
  • Includes status reporting, progress measurement, and forecasting
  • Reports on scope, schedule, cost, resources, quality, and risks
  • Controls project and project document changes
  • Includes control of scope, schedule, costs, and risks
  • Formalizes acceptance of deliverables
  • Records quality control results
  • Implements risk treatment plans and actions
  • Administers suppliers
  • Key Results from monitoring process

  • Progress and status reports
  • Plan updates
  • Risks registers
  • Change requests
  • Work products/deliverables

    Project Quality

    Quality in construction is defined as ‘meeting or exceeding the requirement of client/owners. In construction industry, quality is used in different every than the product industry. In the product industry, quality of some product is better than the other, but we can not say that one grade of concrete. Quality in construction is employed with conformity with which specifications are met.

    Designer specifies the grade of concrete to be used and contractor has to use the in gradients of concrete such that desired grade of concrete is obtained.

    Quality in construction is related to

    • satisfying the specification mentioned in the contract

    • completing the project time.

    • Fulfilling the owner's requirement within budget

    • Avoiding disputes claims and

    • Ensuring the faculties performs its intended purpose.

    We use certain product in the construction industry such as tiles, brick. Quality of these products can be partially related with the general connotation of quality. Other aspect in quality has slightly different meaning at various stages of life cycle of product such as at design stage or construction stage.

    Project safety

    Safety is one of the vital issues in the success of the project . Safety programme ensures the worker to be mentally and physically prepared to execute a job quickly ,fearlessly and efficiently . Safety is a way of life . It must be part of every individual at every time during performance of any activity .

    Working in a fearless protected environment makes the team to be more productive and efficient . Safety is an important parameter to measure a project , as cost of implementation and time of completion of the project . Although every manager , supervisor , worker accept their safety requirement , but it is by-passed by just lip service . Construction is highly accident prone industry .

    In India , construction industry is labour intensive , with unskilled and untrained worker . Fatal accidents and minor accidents are very frequent . For example , it has been reported that more than two people died in the construction of dam like Bhakhara-Nangal project .

    In out country , in construction work , a large number of inexperienced laborers are employed . They are unaware of the hazard during their work and generally the company hardly make an effort to explain this worker's inherent risk involved with the job . Medical check-up of the workers is not carried out before engaging them in the construction work .

    Also , many accidents occur due to the use of improper tools and equiptments . Improper methods and processes are used to cut the time of execution. Such as scaffoldings are not properly made , ladders are not checked properly . Many a time poor quality of safety belts are used , which gets broken during accident .


Related Solutions

You are part of the water supply engineering team of your council. Your team is working...
You are part of the water supply engineering team of your council. Your team is working on a certain part of cast iron piping of a water distribution system involving a parallel section. Both parallel pipes have a diameter of 30 cm, and the flow is fully turbulent. One of the branches (pipe A) is 1000 m long while the other branch (pipe B) is 3000 m long. If the flow rate through pipe A is 0.4 m3/s, determine the...
You are a project team manager, and your team members report each day to you to...
You are a project team manager, and your team members report each day to you to receive their primary assignments.   Not every team member is as efficient as another with particular kinds of tasks.    Time required (hours) to complete tasks Task Task complexity Team member 1 - Jones Team member 2 - Nguyen Team member 3 - Walpita Team member 4 - Manderas Task A Very high 3 5 4 3 Task A High 2 1 3 2 Task...
List all the steps that you as the project manager and your team will need to...
List all the steps that you as the project manager and your team will need to complete to get the CRM system developed and operational. The steps will include all the processes that must be accomplished as well as the subprocesses. Create a WBS to include the activities needed to implement a CRM system Explain the need and value for each task
Scenario You are the manager of a software development team working on new applications for your...
Scenario You are the manager of a software development team working on new applications for your company, Optimum Way Development, Inc. Your director has called for all development teams to submit product briefs detailing their current projects. The director plans to share the most promising product briefs with clients at an upcoming meeting. You have software design documents for two potential projects. Directions You must choose one of the potential products and use the information contained in the technical specification...
Corporation A plans to launch a new project and the financial manager is considering whether this...
Corporation A plans to launch a new project and the financial manager is considering whether this is a valuable investment for the corporation. Consider: The initial cost of this project is $197.92, and it offers cash flows in the next 3 years, with an estimated cash flow of $ 50 in the first year, $100 in the second year and $150 in the third year. Questions: 1. What is the Internal Rate of Return (IRR) of this project? 2. If...
A project manager and the project team should not focus on ‘project firefighting ‘but should allocate...
A project manager and the project team should not focus on ‘project firefighting ‘but should allocate sufficient time and resources to preventing problems throughout the life of the project. Project Risk management is one way of preventing problems that can negatively affect the project objectives of cost, schedule, scope, and quality. Effective risk management is directed at eliminating threats and increasing opportunities to ensure project success. (1) Examine a project that you have worked on or know about and discuss...
A project manager and the project team should not focus on ‘project firefighting ‘but should allocate...
A project manager and the project team should not focus on ‘project firefighting ‘but should allocate sufficient time and resources to preventing problems throughout the life of the project. Project Risk management is one way of preventing problems that can negatively affect the project objectives of cost, schedule, scope, and quality. Effective risk management is directed at eliminating threats and increasing opportunities to ensure project success. (1) Examine a project that you have worked on or know about and discuss...
You are a member in a project team and the project manager asked you to purchase...
You are a member in a project team and the project manager asked you to purchase 4 laptops with certain specifications (Lenovo ThinkPad T series, Core i7, 2 Tera Storage, 32 GB Ram, 15.6" size, NVIDIA® graphics). How do you set your procurement management to do that?
you are a member in a project team and the project manager asked you to purchase...
you are a member in a project team and the project manager asked you to purchase 4 laptops with certain specifications (lenovo thinkpad T series,core i7,2 tera storage ,32 GB Ram ,15.6 size , NVIDIA graphics ) how do you set your procurement management to do that?
Your Company is considering a new project that will require $880,000 of new equipment at the...
Your Company is considering a new project that will require $880,000 of new equipment at the start of the project. The equipment will have a depreciable life of 5 years and will be depreciated to a book value of $300,000 using straight-line depreciation. The cost of capital is 13%, and the firm's tax rate is 21%. Estimate the present value of the tax benefits from depreciation. $116,000 $91,640 $85,680 $24,360
ADVERTISEMENT
ADVERTISEMENT
ADVERTISEMENT